ML20133E639

From kanterella
Revision as of 11:48, 4 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Deviation from Insp on 961104-08 & 1218.Deviation Noted:Provisions for Backup EOF Had Never Been Developed & Licensee Emergency Plan Had Not Been Modified to Include Backup EOF
ML20133E639
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/06/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133E630 List:
References
50-346-96-11, NUDOCS 9701130089
Download: ML20133E639 (1)


Text

_ _ _ _ _ _ _ _ _ - _ _ _. __ .._ _ - _ _ _ . _ _ _ . _ _ _ _ _

i 4

+

NOTICE OF DEVIATION 1

Toledo Edison Company Docket No. 50-346 Davis-Besse Nuclear Power Plant License No. NPF-3 4

During an NRC inspection conducted on November 4 8,1996, a deviation from your commitment for a backup Emergency Operations Facility was identified. In accordance i with the " General Statement of Policy and Procedure for NRC Enforcement Action",

NUREG-1600, the deviation is listed below:

)

I in a December 6,1982, correspondence to the NRC, Toledo Edison indicated that the backup Emergency Operations Facility (EOF) would be located in the Toledo

! Edison corporate office in Toledo, Ohio, approximately 21 miles from the Davis- l l Besse plant site. The location of the backup EOF received Commission approval on l May 18,1983. Toledo Edison was advised of the Commission ection by letter dated June 28,1983 (letter received by Toledo Edison July 1,1983).

]

l Contrary to the above, on December 18,1996. it was determined that provisions

for a backup EOF had never been developed, and the licensee's Emergency Plan had j not been modified to include a backup EOF.

i j Please provide to the U.S. Nuclear Regulatory Commission, ATTN: Document Control

Desk, Washington, D.C. 20555, with a copy to the Regional Administrator, Region Ill, and a copy to the NRC Resident inspector at Davis Besse in writing within 30 days of the date 3 of this Notico, the reason (s) for the deviation, the corrective steps which have been taken i and the results achieved, the corrective steps which will be taken to avoid further
deviations, and the date when your corrective action will be completed. Where good i cause is shown, consideration will be given to extending the response time.

l i

Dated at Lisle, Illinois l this 6 day of January 1997 l 9701130089 970106 PDR ADOCK 05000346 0 PDR

._ _-.