ML20133P769

From kanterella
Revision as of 11:33, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Draft Bulletin, Motor-Operated Valve Failures During Plant Transient Due to Improper Switch Settings. Comments Requested Re Draft Bulletin & Anticipated Burden on Nuclear Utils Prior to 850823
ML20133P769
Person / Time
Issue date: 08/12/1985
From: Rossi C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Tucker H
BABCOCK & WILCOX OPERATING PLANTS OWNERS GROUP, DUKE POWER CO.
Shared Package
ML20133P757 List:
References
NUDOCS 8508140472
Download: ML20133P769 (1)


Text

_ _ _ _ _

AUG 111066 Mr. Hal Tucker Babcock & Wilcox Owners Group Duke Power Company Post Office Box 33189 Charlotte, North Carolina 28242

Dear Mr. Tucker:

SUBJECT:

IE DRAFT BULLETIN: MOTOR-OPERATED VALVE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS The enclosed draft bulletin is being considered for issuance to all nuclear power reactor facilities holding an operating license or construction permit.

We would appreciate your comments on the draft bulletin and any input on the anticipated burden the bulletin may impose on nuclear utilities. Any comments received prior to August 23, 1985 will be considered in the preparation of the final draft to be presented to the Committee to Review Generic Requirements, if you have any questions regarding this matter, please feel free to contact me or Mr. Henry Bailey of my staff. I can be reached at (301) 492-4193 and ilenry at (301) 492-9006.

Sincerely, Original signed by 5 vT Charles E. Rossi, Chief Events Analysis Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

Enclosure:

IE draft bulletin Distribution:

PD!1 v0CS DEPER R/F EAD R/F CRossi RBaer ELJordan HBailey RKlessel (A : 0LJ :lE p If [IE li ailey:mj /CE . s 1 0/[7/05 8///185 fg]Glg720D001p MIUC ppg

__ - _____ _ _ ______ _ _______ _ _ - .