Monthly Operating Rept for Jul 1985
ML20134D474
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/31/1985
From: Ronafalvy J, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8508190237
Download: ML20134D474 (11)


Text

(

l

.r -

OPERATING DATA REPORT Docket No.50-27 2 Date August 10, 1985 Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455 Operating Status

1. Unit Name Salem No. 1 Notes
2. Reporting Period July 1985
3. Licensed Thermal Power (MWt) 3338
4. Nameplate Rating (Gross MWe) 1170
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (Gross MWe)1124
7. Maximum Dependable Capacity (Net MWe) 1079
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period __/44 5087 70896
12. No. of Hrs. Reacter vlas Critical 744 5069.6 40893.1
13. Reactor Reserve Shutdown Hrs. 0 0 3088.4
14. Hours Generator On-Line 744 5066.7 39225.3
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MVm) 2489858 16856249 119624246
17. Gross Elec. Energy Generated (bHE) 833550 5740870 39656920
18. Net Elec. Energy Generated (MWH) 800369 5518268 37616250
19. Unit Service Factor 100 99.6 55.3
20. Unit Availability Factor 100 99.6 55.3
21. Unit Capacity Factor (using MDC Net) 99.7 100.5 49.2
22. Unit Capacity Factor (using DER Net) 98.7 99.5 48.7
23. Unit Forced Outage Rate 0 .4 30.2
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation) :

Forecast Achieved Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 6/30/77 8-1-7.R2 Page of 8500190237 850731 i' PDR ADOCK 05000272 \ f R PDR

~

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-272 Unit Name Salem # 1 Date August 10,1985 Completed by J. P. Ronafalvy Telephone 609-935-6000 Extension 4455 Month July 1985 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 1070 17 1078 2 1074 18 1066 3 1074 19 1084 4 1094 20 1072 5 1082 21 1069 6 1084 22 1069 7 1086 23 1066 8 1084 24 1082 9 1086 25 1071 10 1084 26 1057 11 1084 27 1051 12 1087 28 1069 13 1072 29 1069 14 1094 30 1067 15 1073 31 1073 16 1078 P. 8.1-7 R1 I

l l

l l

UNIT SHUTDOWN AND POWER REDUCTIONS Docket No.50-272 REPORT MONTH July 1985 Unit Name Salcm No.1 -

Date August 10,1985 Completed by J.P. Ronafalvy Telephone 609-935-6000 Extension 4455 -

Method of Duration Shutting License Cause and Corrective No. Date Type Hours Reason Down Event System Component Action to 1 2 Rea cto r Report Code 4 Code 5 Prevent Recurrence

  • There were no outages for the month of July resulting in a load reduction of greater than 20%.

1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)

MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-272 REPORT MONTH JULY 1985 UNIT NAME: Salem 1 DATE: August 10, 1985 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455

  • DC R N O . SAFETY EVALUATION 10 CFR 50.59 lEC-2148 This design change does not involve any field work. It provides a margin of safety for the RHR heat removal requirements during a LOCA. Details of the analysis is addressed in Engineering Safety Evaluation S-C-N210-MSE-0317. No unreviewed safety or environmental questions are involved.
  • DCR - Design Change Request

MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-272 REPORT MONTH July 1985 UNIT NAME: Salem 1 DATE: August 10, 1985 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455

  • DC R NO . PRINCIPLE SYSTEM SUBJECT 1EC-2148 Component Cooling Revise the component cooling flow rate to the RHR heat exchangers during cold leg recirculation from 2000 GPM to 4000 GPM per heat exchanger.
  • Design Change Request l

4

, . - _ , . _ . , _ . _ _ _ , , _ . , ._ - _ _ _ . _ . . . . _ . _ , - - _ _ - . . . . _ _ ~ - - - _ , , - - . . _ _ . _ . . _

PSE&G SALEM GENERATING STATION .

SAFETY RELATED WORK ORDER LOG

^

SALEM UNIT 1 -

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 8507240861 SMD 1 11SW126 FAILURE DESCRIPTION: VALVE BROKE OFF, LINE HAS BEEN TEMPORARILY PLUGGED WITH A WOOD DOWEL.

CORRECTIVE ACTION: WELDED CAP ON SPOOL PIECE.

8507210058 SMD 1 12 BAT PUMP FAILURE DESCRIPTION: PUMP HAS AN OIL LEAK COMING FROM PUMP BEARING UNDER SHEATHING.

CORRECTIVE ACTION: REPLACED GASKET ON PUMP HOUSING.

8507140068 SIC 1 1R41B INDICATION FAILURE DESCRIPTION: CHANNEL IS FAILED.

CORRECTIVE ACTION: REMOVED 862C REMOTE CONTROLLER AND CLEANED PINS WITH FLUX CLEANING SOLVENT. MODULE REINSTALLED AND REMOTE RETURNED TO SERVICE.

8507140190 SMD 1 12 BAT PUMP FAILURE DESCRIPTION: PUMP TRIPPED, SMELLS SMOKED. OIL IS BLACK.

CORRECTIVE ACTION: REBUILT PUMP AND REALIGNED AS PER PROCEDURE.

r ,

SALEM UNIT 1 .

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 8507070051 SIC 1 1CC19 6 FAILURE DESCRIPTION: AIR LINE DISLODGED OUT OF SWEDGLOCK FITTING ON TOP OF DIAPHRAGM OF VALVE.

CORRECTIVE ACTION: FOUND SWAGELOCK FITTING LOOSE AND MISSING REAR FERRELL. REPLACED WITH NEW NUT AND FERRELS AND REHOOKED TO DIAPHRAGM 8506250056 SMD 1 CFCU OUTLET HDR ISO.

FAILURE DESCRIPTION: THE REACH ROD IS JAMMED.

CORRECTIVE ACTION: REACH ROD FACE PLATE REMOVED. CLEANED BEARING HOUSING. REASSEMBLED REACH ROD. SATISFACTORY.

0099176645 SMD 1 11 SW PUMP FAILURE DESCRIPTION: 11 SW PUMP WILL NOT START FROM THE CONTROL ROOM.

CORRECTIVE ACTION: PLACED BREAKER IN TEST POSITION OP. CONTROL CIRCUIT FROM CONTROL ROOM WHILE MONITORING RELAYS IN CONTROL CIRCUIT FOUND TWO FAILED RELAYS, REPLACED RELAYS AND OP. CIRCUIT FROM CONTROL ROOM WITH BREAKER IN TEST CIRCUIT AND BREAKER OP. PROPERLY.

0099177901 SIC 1 11SW127 FAILURE DESCRIPTION: CAN'T CONTROL VALVE WITH PNEUMATIC CONTROLLER. VALVE IS ABOUT 1/4 OPEN AND WON'T MOVE.

CORRECTIVE ACTION: REPLACED VALVE POSITIONER, STROKED AT 3-15# INPUT TO POSITIONER. i

SALEM UNIT 1 -

WO NO DEPT UNIT EQUIPMENT IDENTIFICATION 0099178168 SIC 1 12 SI PUMP FAILURE DESCRIPTION: JUNCTION BOX FOR THERMOCOUPLE TA-4440 IS LEAKING OIL.

CORRECTIVE ACTION: EXISTING THERMOCOUPLE WOULD NOT HOLD OIL SEAL ON THRUST BEARING ALLOWING OIL TO LEAK THROUGH THERMOCOUPLE AND INTO CONDUIT. REMOVED DEFECTIVE THERMOCOUP LE. CALIBRATED AND INSTALLED NEW THERMOCOUPLE.

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 1 JULY 1985

-SALEM NO. 1 The Unit operated at full power for the entire period.

m .. .-

REFUELING INFORMATION DOCKET NO.: 50-272 COMPLETED BY: J. Ronafalvy UNIT NAME: Salem 1 DATE: August 10, 1985 TELEPHONE: 609/935-6000 EXTENSION: 4455 Month July 1985

1. Refueling information has changed from last month:

YES NO X

2. Scheduled date for next refueling: February 22, 1986
3. Scheduled date for restart following refueling: May 4,1986
4. A) Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMINED TO DATE B) Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X If no, when is it scheduled? January 1986

5. Scheduled date(s) for submitting proposed licensing action:

January 1986 if required

6. Important licensing considerations associated with refueling:

NONE

7. Number of Fuel Assemblies:

A) Incore 193 B) In Spent Fuel Storage 296

8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
9. Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity: September 2001 8-1-7.R4

~~

O PSIEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station August 10, 1985 ,

Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT S ALEM NO. 1 DOCKET NO. 50-272 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of July 1985 are being sent to you.

Average Daily Unit Power Level-Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours ,

b J. M. Zupko, Jr.

General Manager - Salem Operations JR:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission l Washington, DC 20555 Enclosures 8-1-7.R4 I