ML20134N086

From kanterella
Revision as of 12:53, 1 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2
ML20134N086
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/31/1996
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20134N048 List:
References
NUDOCS 9611260160
Download: ML20134N086 (1)


Text

. . . . . ~ - ..- - . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

i w I

- ************************** .i
  • BYRON
  • Report Period: August, 1996 UNIT SHUTDOWNS / REDUCTIONS  !

(UNIT 2) ************************** ,

No. Date Type Hours Reason Method LER Number System Component Cause & Corrective Action To Prevent Recurrence 2 8/08/96 F 253:20 A 1 MS Stm Generator Forced Outage B2F17 Due To Increased Leak Rate i In The 2A S/G i 3 8/19/96 S 312:00 C 4 Began Refueling Outage B2R06 -

i 1 .

h

  • Summary
  • i TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H ,

Instructions for i S-Sched B-Maint or Test ~G-Oper Error 2-Manual Scram C-Refueling H-Other 3-Auto Scram Preparation of  ;

D-Regulatory Restriction 4-Continued Data Entry Sheet  !

E-Operator Training 5-Reduced Load Licensee Event Report ,

& License Examination 9-Other (LER) File (NUREG-0161) i i

f 9611260160 961108 PDR ADOCK 05000454 R PDR c

gr\wbyritrsws9.wpf-16)

?

__ - . = _ _ _ _ _ _ _ . _ - _ - - - _ _ _ - _ _ _ _ . _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ - - _ _ - - - _ . - - _ _ _ _ _ _ _ _ -

- _ _ _ _ . _ . __ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ - - - _ _ - _ _ _ - _ -