MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20210T6011986-02-12012 February 1986 Submits Daily Staff Notes.Region Iii,Nrr & Cleveland Electric Illuminating Co Will Meet on 860211 Onsite to Discuss Reviews Re 860131 Earthquake Near Site & Readiness of Plant for Fuel Loading ML20126H2591981-04-0606 April 1981 Forwards Addl Copies of NRC 810403 Response to Intervenor Dellums Request for Production of Documents.W/O Encl ML20151B3451980-10-0606 October 1980 Forwards Overview of Geosciences Branch Workload,W/Priority Indicated.Requests Assistance W/Scheduling ACRS & Hearings ML20148B8491980-01-10010 January 1980 Notification of 800129 Meeting W/Ge & Consultants in Bethesda,Md to Discuss Presentation of Licensee Probability Analysis ML20147C5581978-12-13013 December 1978 Forwards Status Rept of Dse Review of Geology as It Relates to Potential for Surface Faulting of Getr Site.Data Is Incomplete & Does Not Allow Final Conclusions.Encl Request for Addl Info ML20147H7361978-12-0505 December 1978 Corrects Error in NRC Staff Answer to Intervenors' Request for Referral & Licensee'S Motion for Imposition of Sanctions, Dtd 781129.On p2 Denied Should Read Granted. Staff Supports Licensee'S Request to Impose Sanctions ML20147C4721978-11-27027 November 1978 Notice of 781205 Visit to Facil in Order to Inspect Trenches Completed in the Getr Site Fault Investigation ML20147C8621978-02-0303 February 1978 Forwards 780201 USGS Review of Potential Faulting at Subj Site.Feels Staff Should Not Take Firm Position Until After Its Review.W/Encl ANO:7809250067 ML20147C8701978-01-0909 January 1978 Identifies Sys Which Are Req to Assure Adequate Core Cooling, & Specifies Operability Conditions That Must Be Met by Each Sys ML20147C9411977-12-14014 December 1977 Summary of 771202 Meeting Re Geological & Seismological Matters Relating to Seismic re-evaluation of Getr. Requests That Facility Provide Info Re Surface Faulting in Support of 771024 Show Cause Order.W/List of Attendees ML20147D3651977-11-30030 November 1977 Discusses Status of Trench Closing at Vallecitos & Examination of Trenches by NRC & Other Agencies.Recommends That GE Be Allowed to Backfill Trenches 1,2 & 3 & the Large Boreholes Now Dug,W/Encl Comments for 771202 Getr Meeting ML20147D2141977-11-10010 November 1977 Requests Dor Provide Proposed Fed Register Notice Repting Shutdown of Getr as Abnormal Occurrence.W/Encl Copy of Previous FRN for Abnormal Occurrence for Info ML20147C5611977-10-28028 October 1977 Forwards Rept on Status of Assessment of Geology & Seismology at Getr Site, ML20147C7631977-10-27027 October 1977 Notice of Meeting W/Ge on 771029 to Provide Info to Justify Resuming Oper of Getr ML20147D2111977-10-26026 October 1977 Notification of 771028 Meeting in Bethesda W/Ge to Allow GE to Give NRC Its Assessment of All NRC-lic Activities at Vallecitos,As Req by 771024 Show Cause Order ML20147D3441977-10-25025 October 1977 Summarizes 771024 Conversation W/Ge & Consultants to Determine Ge'S Plans for Further Investigations of Faulting Near Vallecitos Facil & Status of Investigations ML20147C8061977-10-0404 October 1977 Discusses Rereview Re Ability to Cool Core Assuming Cooling Water Absence of Full Seismic Design Capability.Because of Various Assumptions,Staff Must Have Reasonable Assurance of Items Withstanding Seismic Forces ML20147E5761977-10-0404 October 1977 Requests That Geology & Seismology Branch Provide Tech Assistance to Div of Operating Reactors in the Geology & Seismology Review of the Subj Facil as Discussed in Enclosed TAC 7062.W/o Encl ML20147C6211977-09-15015 September 1977 Summarizes 770803 Meeting Re Discussion of Seismic Reeval of Subj Facil.Concluded That Addl Info Re Site Seismic & Geologic Info Is Needed from Gen Elec ML20147C8161977-09-15015 September 1977 Summarizes 770831 Briefing on Gen Elec'S Phase I Geological Investigation Which Presented a New Map of Livermore Valley & Interpreted the Geology & Seismology of Area Around Greenville & Las Positas Faults ML20147C6111977-09-12012 September 1977 Reports on Briefing by D Herd Re Detailed Field Mapping That Has Identified a Number of Faults W/Relatively Young Geological Movement Near Subj Facil ML20147C7821977-05-0606 May 1977 Forwards Form Reply Sent in Response to Pub Inquiries Re Pending Lic Renewal Appls.Forwards Mailing List for Notices to Be Issued on Renewal Appls ML20147C7981977-05-0606 May 1977 Forwards Draft Ltr Outlining NRC Review Process as Background Info for Getr Review.Requests Comments 1986-02-12
[Table view] |
Text
A
% UNITED STATES
,,, s 'k NUCLEAR REGULATORY COMMISSION 3 .3 )M j WASHINGTGN, D. C. 20$5L
'% . . . . . # NOV 3 0 1977 MEMORANDUM FOR: V. Stello, Jr., Director, Division of Operating !
Reactors FROM: H. R. Denton, Director, Division of Site Safety and Environmental Analysis
SUBJECT:
TRENCH CLOSING - VALLECITOS NUCLEAR CENTER (CETR)
PLANT NAME: General Elect.ric Test Reactor DOCKET NUMBER: 50-70 RESPONSIBLE BRANCHES: EEB, ORB-1 PROJECT MANAGER: A. Burger During a staff visit to the GETR site on November 16, 1977, General Electric Company personnel requested that they be allowed to backfill the trenches made for geologic investigations. We have also been notified by General Electric in the attached letter of G. D. Hoggatt of GE to A. Schwencer of NRC dated November 28, 1977, that the trenches will be filled on November 30, 1977 unless a valid reason is provided to leave them open. NRC and USGS personnel examined trench 1 on Octobot 13, 1977. Trenches 1 and 2 were examined by NRC, USGS and Calitornia Division of Mines and Geology (CDMG) personnel on October 22, 1977. NRC personnel inspected trenches 1, 2 and 3 on October 29, 1977 accompanied by two ACRS consultants. Representatives of the NRC, CDMG and the U. S. Corps of Engineers examined trenches 1, 2 and 3 again on November 16, 1977. It is our understanding that representatives of the USGS visited the site on November 28, 1977.
The licensee has mapped the trenches and we have preliminary copies available. In addition, we and the licensee have photographed features in the trenches. Although we consider it unlikely, these trenches could '
be re-excavated at a later date if necessary. We therefore recommend that General Electric Company be allowed to backfill trench 1, 2 and 3 ;
and the large diameter boreholes excavated to date. 1
/
/ w H. R. Denton, Director i Division of Site Safety and Environmental Analysis Office of Nuclear Reactor Regulation
Attachment:
As stated cc: w/ attachment K. Coller Burger L. Barrett D. Eisenhut R. Hofmann J. Donohem I
W. Gammill R. Jackson A. Schwencer gg1S1
COMMENTS FOR GETF. MEETING 12/2/77 .
Purpose:
Evaluate Potential for Surface faulting at theaGETR site Pass concerns on to UE Express Problems Express Investigations needed to aid in resolving problem Problems A. As expressed in show cause order
- 1. Mapped location of the Verona fault
, 2. Thrust offset observed in trenches
- 3. Structural relationship of the Verona to the Calaveran fault 4 Regional tectonic setting Entire response to show cause order in surface faulting area is based on the premise that the Verona fault as postulated does not exist.
Investigations to date have shed new light on our understanding of the site geology - but present evidence is not conclusive.
At this point in our review we are not in a position to support con-clusion that denies the existence of a Verona fault. Sufficient investigations have not been accomplished to date to rhow that such a fault does not exist.
LANDSLIDES
- 1. Evidence for the existence of large, old landslides includes:
- a. photointerpretation of landforms
- b. shear planes and low angle thrust f eatures observed in trenches and borings near base (toe?) of proposed slide
- c. jumbled nature of subsurface naterials and shears observed in trench 2.
, _ . ~ .
_2-
- 2. Evidence for landsliding is not conclusive because:
- a. headscarp boundaries have not been supported by trenching
- b. lateral shear zones have not been observed in trenches to define the limits of the slide l c. the primary slip surface has not been sufficiently located
- d. un1ts of stable bedrock have not been shown to be discontinuous across slide boundaries
- e. . units (beds) of stable bedrock have not been correlated with units in slide mass - sequences would be the same'
- f. rotation of beds has not been demonstrated
- g. the mechanism for mass movement has not been conclusively established, i.e. stream erosion of toe, more humid paleo-climate', breached resistant cap exposing materials susceptible to sliding
- h. observed shear zones have not been correlated with primary and secondary slide masses
- 1. the age of soils offset in trench one has not been established, ;
nor has the age of the landslide,
- j. other geomorphic explanations of arcuate escarpments have not been addressed or evaluated, i.e. stream meanders, terraces, faulting w/ secondary sliding, etc.
VERONA FAULT
, 1. Evidence for the existence of the Verona Fault includes:
- a. prominent south-facing scarp
- b. generally linear, sharp break in topography
- c. unexplained linear features in site area
- d. seeps and ponds along linear feature
, _ , - . . , _ , , . . . - . . _ . - . _ _ . _ . ~ , . . . . _ . . . . . - . _ . . _ _ , . _ - _ - . _ _ _ . _ . . _ . . _ . - _ - . _ _ _ . _ .. _ _ _ _
6
- e. thrust offset along shear planes exposed in trenches
- f. . difference in elevation @-* 450') between Livermore gravels on either side of sharp break in topography
- g. active local and regional tectonic setting and possible '
association of linears with Calaveras, Williams and/or Las Posit as Faults
- h. existing geologic maps and texts of Vickerey, Hall, Herd, Cal. Dept. Water Resources , GETR
- 1. stratigraphic relationships on either side of proposed fault (Texas Company's Foley No. 1 well)
- 2. At the present time we cannot conclude that the Verona fault as postulated does not exist because: 1
- a. thrust offsets observed in trenches may or may not be due to >
lands 11' ding. Trenches have not been dug along the proposed fault trace in areas where landsliding definitely does not exist (i.e. to the northwest under Qt alluvium)
- b. local geology has not been mapped in detail
- c. subsurface geology is complex and poorly understood at present
- d. structural and stratigraphic relationships of geologic units are poorly understood in site. area
- e. geomorphology of area is poorly understood - origin of anomalous landforms have not been evaluated
- f. photo-linears have not been trenched or explained
- g. origin of seeps and ponds have not been explained
- h. soils offset in trench 1 have not been dated
- 1. thrust of fset has not been dated
- j. resistant gravel unit east of the site has not been dated or I stratigraphically related to the Livermore gravels i
1 l
l i
1 -l
4 s .
. s .
- 4-9 Summary In our view, at the stage of our review, the situation is one of con-flicting hypotheses. One hypothesis proposes f aulting as the primary genetic cause of the features observed in the site area. This hypothesis -j has been forwarded by a number of geologists who have worked in the site region and the NRC staff. . Alternate hypotheses have been of fered which,'in essence, ascribe to erosion and mass wasting as the primary I genetic cause of the features observed in the site area. This hypo- ,