(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20064N8791983-02-0404 February 1983 Response to ASLB 830118 Memorandum & Order.Meteorological Tower Will Be Salvaged & Disposed Of.Exploratory Trench Will Be Left.State of or Requirements for Bank Sloping & Grass Seeding Will Be Met.Certificate of Svc Encl ML20066F8481982-11-12012 November 1982 Request for Withdrawal of Application for CP & for Order Terminating Proceedings.Utils Will Comply W/Public Util Commissioner of or Order to Terminate Util Interest in Project.Certificate of Svc Encl ML20052B4851982-04-26026 April 1982 Response Opposing Forelaws on Board 820415 Motion for Order Denying CP Application & for Terminating Proceeding.Motion Admits Util Intent to Relocate Site,Thereby Showing Proceeding Not Moot.W/Certificate of Svc ML20054D9861982-04-15015 April 1982 Motion to Terminate Further Hearings & to Deny License Application.State of or Denied Application So That Application Before NRC Rendered Moot.Relocating Plants Would Require New Application.Certificate of Svc Encl ML20054B9071982-04-0909 April 1982 Final Order Denying Util Application for Site Certificate. Proceedings Dismissed ML20054B9101982-04-0909 April 1982 Testimony of W Lindbald Before or Energy Facility Siting Council Withdrawing Application for Site Certificate ML20054B9151982-04-0808 April 1982 Supplemental Order Directing Util to Write Off Financial Investment in Plant or Show Cause Why Util Should Not Be Required to Do So ML20040D7621982-01-29029 January 1982 Request for Clarification of ASLB 811023 Order & Statement of Position on Dates for Completion of Const.Unclear How Seismic Issues Will Be Treated in Evidentiary Hearing on Alternate Site Issues.Certificate of Svc Encl ML20126M0741981-06-0101 June 1981 Argument Supporting Forelaws on Board Admission of Contentions AS-5 & AS-6.Requests That Issue on Whether to Proceed W/Hearings Be Submitted to Commission for Further Review.Certificate of Svc Encl ML20126K8301981-05-14014 May 1981 Responds to ASLB 810428 Order Re Util Future Plans for Facility.Const Was Deferred Until 1990 Since Work Would Not Be Completed in Time to Meet Expected Needs ML19341C5781981-02-13013 February 1981 Response to NRC & Applicant Findings of Fact & Conclusions of Law Re Environ & Site Suitability.Intervenor Agrees W/Nrc Findings D-3,6 & 9,opposes NRC Findings 37-45 & Applicant Findings 21-27,118 & 121-125.W/Certificate of Svc ML19339C8471981-02-0606 February 1981 Answer Opposing Intervenor Forelaws on Board 810122 Motion for Suspension of Further Hearings & Findings of Fact & Conclusions of Law.Request That Prehearing Conference Be Scheduled Should Be Renewed.Certificate of Svc Encl ML19345E8421981-01-22022 January 1981 Petition That ASLB Suspend Hearings & Proposed Findings of Fact & Conclusions of Law.Util Precluded from Const & Licensing Due to Passage of 801104 Ballot Measure 7. Certificate of Svc & Supportive Documentation Encl ML19338G4521980-10-22022 October 1980 Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision Re Environ & Site Suitability. Argues Adequacy of Location from Radiological Effects Standpoint.Certificate of Svc Encl ML19344B5891980-10-15015 October 1980 Requests Order Extending Time to File Proposed Findings of Fact from 801015 to 801022.Certificate of Svc Encl ML19323H0511980-05-27027 May 1980 Response to ASLB 800327 & 0403 Orders & to Fes,Suppl 1.Urges More Rigorous Site Alternative Analyses Prior to Further Hearings.Recommends That Subpart II of EPA Be Treated as Contention in Proceeding ML19211C4491979-10-12012 October 1979 Alleges,Before Energy Facility Siting Council of or, Insufficiency of Stds Regarding Support or Opposition to Site Certification Application,Re 790912 Proposed Order, Vol 1,need for Power.Questions Financial Ability ML19256E4061979-09-20020 September 1979 Motion for Order Fixing Time & Place of Prehearing Conference to Discuss Schedule & Status of Remaining Issues, Per ASLB 790511 Order.Nrc & State of or Do Not Object to Granting of Motion.Certificate of Svc Encl ML19256E4101979-09-12012 September 1979 Proposed Findings of Fact,Opinion,Conclusions & Order Re Site Certificate for Const & Operation of Facility. Requirements of Specific Stds Are Met ML19225B2541979-06-18018 June 1979 Notifies of Change of Counsel Effective 790618.JW Durham Replaces Hh Phillips ML20147J3271978-12-15015 December 1978 Memorandum Concerning Bd Questions.Puts Parties on Notice That Bd Will Have Questions Concerning Oper of Dirty Radwaste Sys.Resolution of Discrepancies to Be Sought at Next Meeting ML20204C6091978-11-13013 November 1978 Notice of W/Drawal by J Lawrence as Counsel Representing NRC in Proc Re Subj Facils,Effective Immediately.Cert of Svc Encl ML20148P8111978-11-0303 November 1978 Testimony of R Weller on Revs to NRC Staff Eval of Liquid Radwaste Sys W/Respect to 10CFR50App.I & Effect on Overall Cost-Benefit Balance. Supporting Documentation Encl 1983-02-04
[Table view] Category:NOTICES
MONTHYEARML19225B2541979-06-18018 June 1979 Notifies of Change of Counsel Effective 790618.JW Durham Replaces Hh Phillips ML20147J3271978-12-15015 December 1978 Memorandum Concerning Bd Questions.Puts Parties on Notice That Bd Will Have Questions Concerning Oper of Dirty Radwaste Sys.Resolution of Discrepancies to Be Sought at Next Meeting ML20204C6091978-11-13013 November 1978 Notice of W/Drawal by J Lawrence as Counsel Representing NRC in Proc Re Subj Facils,Effective Immediately.Cert of Svc Encl 1979-06-18
[Table view] Category:OTHER LEGAL DOCUMENT
MONTHYEARML20064N8791983-02-0404 February 1983 Response to ASLB 830118 Memorandum & Order.Meteorological Tower Will Be Salvaged & Disposed Of.Exploratory Trench Will Be Left.State of or Requirements for Bank Sloping & Grass Seeding Will Be Met.Certificate of Svc Encl ML19225B2541979-06-18018 June 1979 Notifies of Change of Counsel Effective 790618.JW Durham Replaces Hh Phillips ML20147J3271978-12-15015 December 1978 Memorandum Concerning Bd Questions.Puts Parties on Notice That Bd Will Have Questions Concerning Oper of Dirty Radwaste Sys.Resolution of Discrepancies to Be Sought at Next Meeting ML20204C6091978-11-13013 November 1978 Notice of W/Drawal by J Lawrence as Counsel Representing NRC in Proc Re Subj Facils,Effective Immediately.Cert of Svc Encl 1983-02-04
[Table view] |
Text
NRC PUBLIC DOCUMENT ROOM 96 4
'. *5!2 UNITED STATES OF AMERICA w NUCLEAR REGULATORY COMMISSION l5 DECl 51970 > d k T*f.,7 7%
BEFORE THE ATOMIC SAFETY AND LICENEING BOARRg waa 8 In the Matter of "
)
)
PORTLAND GENERAL ELECTRIC COMPANY, ) Docket Nos. 50-514 ET AL. ) 50-515
)
(Pebble Springs Nuclear Plant, )
Units 1 and 2) )
MEMORANDUM CONCERNING BOARD QUESTIONS The purpose of this memorandum is to put the Parties on notice that the Board will have questions concerning the operation of the " dirty radwaste system" (DRS).
We note that Applicants' Amendment 12 (July 1978) has modified the proposed operation of the DRS; there is no longer a requirement to process the secondary system wastes
, when the concentration of radioactive nuclides exceeds 10-6 M Ci/cc. We note that the Applicant " assumes that the entire annual volume of secondary wastes are discharged at an annual average concentration of approximately 10-6 microcurie /cc (excluding tritium)". We further note that under that assumption "the estimated annual discharge of activity from the secondary system amounts to approximately 0.01 Ci/yr,"
I and that the estimated whole-body dose to a nearby resident is 0.49 mrem /yr (Table 11.2-2). We inquire as to the basis for that assumption and the proposed operational procedures that will assure compliance with Appendix I to 10 CFR 50.
18122800 %
[(
We have also received the Revisions ;o NRC Staff Evaluation of Liquid Radwaste System dated November 3, 1978.
We note that "the Staff assumed that 50% of the regenerant solutions will be discharged to the coolant reservoir wit aut treatment." Under that assumption the Staff has estimated a rele~ase of 3.8 Ci/yr, over 100 times greater than estimated by the Applicant. However, the Staff's estimate of whole-body dose to a nearby resident is only 0.033 mrem /yr, much less than estimated by the Applicant. We would like further information from the Staff concerning the basis for the estimated release rates and the calculation of dose.
We will seek a resolution.of the discrepancies between the estimates of the Staff and Applicant concerhing the releases and doses at the next session of the evidentiary hearing.
FOR THE ATOMIC SAFETY AND LICENSING BOARD d_ m 7 Mw -
Ja h R. Yore [hairman Dated at Bethesda, Maryland this 15th day of December 1978.