Corrected Monthly Operating Rept for Jul 1985
ML20134Q204
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/31/1985
From: Ronafalvy J
Public Service Enterprise Group
To:
Shared Package
ML20134Q202 List:
References
NUDOCS 8509090216
Download: ML20134Q204 (1)


Text

. _ _ . ______- __ - - - . __ . _ __ _ . _

OPERRTING DRTA REPORT J Docket No. 50-311 Date August 10,1985 '

. Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455

- Operating Status Corrected copy

1. Unit Name Salem No. 2 Notes
2. Reporting Period July 1985
3. Licensed Thernal Power (MWt) 3411
4. Nameplate Rati:q (Gross MWe) TIT 6 4
5. Design Electrical Rating (Net MWe) 1115
6. Maximum Dependable Capacity (Gross MWe)1149
7. Maximum Dependable Capacity (Net MWe) 1106
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative

, 11. Hours in Reporting Period 744 5087 33312

12. No. of Hrs. Reactor was Critical 501.7 2221.4 17316 4 13. Reactor Reserve Shutdown Hrs. 0 0 3533.6 I
14. Hours Generator On-Line 468 1959.2 16571.3 i 15. Unit Reserve Shutdown Hours- 0 0 0 j 16. Gross Thermal Energy Generated
DOGI) 1485823 5971880 49698916

! 17. Gross Elec. Energy Generated 00GI) 497780 1967980 16245630 j 18. Net Elec. Energy Generated (MWH) 469089 1833560 15351396

19. Unit Service Factor 62.9 38.5 49.7
20. Unit Availability Factor 62.9 38.5 49.7
21. Unit Capacity Factor i (using MDC Net) 57.0 32.6 41.7 ,!
22. Unit Capacity Factor l (using DER Net) 56.5 32.3 41.3
23. Unit Forced Outage Rate 37.2 58.7 40.8
24. Shutdowns scheduled over next 6 months (type, date and duration of each) j N/A i

! 25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation) :

, Forecast Achieved

{ Initial Criticality. 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81