ML20090B188

From kanterella
Revision as of 07:07, 13 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Draft Rev 0 to Advanced BWR Ssar Main Steam, Feedwater & Srvdl Piping Sys Design Criteria & Analysis Methods & Draft Rev 0 to Advanced BWR Feedwater Loop a Piping & Equipment Loads, Per Ge/Nrc 911209-10 Meeting
ML20090B188
Person / Time
Site: 05000605
Issue date: 02/24/1992
From: Marriott P
GENERAL ELECTRIC CO.
To: Pierson R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20090B190 List:
References
EEN-9227, MFN-043-92, MFN-43-92, NUDOCS 9203030235
Download: ML20090B188 (1)


Text

l ih) GE NucIcar Ettergy m , , ,

+

t 4 f.m February 24,1992 MFN No. 043-92 Docket No. STN 50-605 EEN 9227 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Robert C. Pierson, Director Standardization and Non Power Reactor Project Directorate

Subject:

Piping Analyses issue - December 910,1991 GE/NRC Meeting Enclosed are thirty four (34) copies of the following draft reports:

1. ABWR SSAR Main Steam, Feedwater and SRVDL Piping Systems Design Criteria and Analysis Methods.
2. ABWR Feedwater Loop A Piping and Equipment Loads These are the first two of the committed documents on this issue. The main steam and SRVDL stress reports and the pipe break report will be prov0'ed in March,1992.

Sincerely, ihl Wji %s P.W. Marriott, Manager Regulatory and Analysis Services M/C 38.", (408) 925-6948 cc: F. A. Ross (DOE)  !

N. D. Fletcher (DOE)

C. Poslusny, Jr. (NRC)

D. Terao (NRC)

R. C. Berglund (GE)

J. F. Quirk (GE) 9203030235 920224

! PDR ADOCK 05000605 ,

A. PDR OW

( 'V