ML20094G720

From kanterella
Revision as of 03:42, 3 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Proprietary Revised App 18E, Advanced BWR Man-Machine Interface Sys Design & Implementation Process, of Advanced BWR Ssar.App Withheld
ML20094G720
Person / Time
Site: 05000605
Issue date: 02/17/1992
From: Oneil T
GENERAL ELECTRIC CO.
To: Poslusny C
Office of Nuclear Reactor Regulation
Shared Package
ML20034D273 List:
References
NUDOCS 9203030270
Download: ML20094G720 (1)


Text

-

- GE Nuclear Energy khencedMeector prenrams

'3APIFAX TRANSMITTAL r?bruary 17,1992 cc: J.N. Fox K.E. Gregoire J.F. Oukk M.A. Ross To: C. Posiusny NRR/PDST yM3 U.S. NRC

Subject:

ASWR MMIS Ossicn and Implementation Process

'!R (,ontrol Room R.ference: MFN No.131-91: Docket No. STN 50 805; EEN 9178,";

Design implementation Process," October 24,1991.

Please find attached the revised MMIS design and Implemertation procesa clagram and descdption for Appendix 18E of the ABW".3SAR. Please distrbute this matenalto Dick Eckenrode, Clare Goodman and Greg Galletti of the NRC and John O'Hara of BNL The attached malertal contains InfomW" n that is designated as General Electric Company proprietaryInformatbn.

We believe that this material addresses the NRC and BNt.o)mments on the draft Appendix 18E provided in the referencre d transmittal. Pnsese note that Section 18E.2 is not included ir the attached rmertal. Section 18E.2 wm include the Tier 2 requirements associated wRh the Design Acceptance Crtterla for the NRC Conformance Reviews. The first two tabMs of Section 18E.2 were transmitted to th* NRC tast week.

reviewed within GE, and willoe Our responses to the Chapter 18 DSER (SECY 91320) are bo.

Sent to you by reweek.

Ptease call Jack Fox or me W you have any questions or comments.

Bast Regards, AoM T.J. O'Neil ElectricalSystems &

Equipment Design (408) 925 1801 1

9203030270 920225 PDR ADOCK030006]5

%