ML20100N167

From kanterella
Revision as of 11:26, 29 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
1995 Annual Rept - Part 1, for Vogtle Electric Generating Plant
ML20100N167
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1995
From:
GEORGIA POWER CO.
To:
Shared Package
ML20100N130 List:
References
NUDOCS 9603060201
Download: ML20100N167 (6)


Text

. -

VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 NRC DOCKETS 50-424/425 OPERATING LICENSE NPF-68/81 1995 ANNUAL REPORT- PART 1 TABLE OF CONTENTS PAGE I

1. INTRODUCTION 1 i

II. TECHNICAL SPECIFICATION 6.8.1.2 ANNUAL REPORTS A. TECHNICAL SPECIFICATION 6.8.1.2a - REPORT OF 2 l PERSONNEL EXPOSURE GREATER THAN 100 MREM /YR.

l B. TECHNICAL SPECIFICATION 6.8.1.2b - REPORT OF 4 PRIMARY COOLANT'S EXCESSIVE SPECIFIC ACTIVITY l C. TECHNICAL SPECIFICATION 6.8.1.2c - REPORT OF 5 LEAKAGES GREATER THAN OR EQUAL TO 0.005 MICROCURIES l

l l

9603060201 960228 PDR ADOCK 05000424 R PDft

1 1

VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 1995 ANNUAL REPORT- PART 1 INTRODUCTION  ;

The Vogtle Electric Generating Plant Units 1 and 2 are powered by pressurized water reactors, each rated at 3565 megawatts thermal. It is located on the Savannah River in Burke County Georgia, at a site 34 miles coutheast of Augusta. The Unit 1 operating license was initially received on January 16,1987 and Commercial Operation started on May 31,1987. Unit 1 is in its sixth fuel cycle. Unit 2 received its initial operating license on February 9,1989, and began commercial operation on May 19,1989. Unit 2 is currently in its finh fuel cycle.

i a

I l

-_ , i

II A VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 1995 ANNUAL REPORT - PART 1 TECilNICAL SPECIFICATION 6.8.1.2a REPORT OF PERSONNEL EXPOSURE GREATER TIIAN 100 MREM /YR

  1. PERSONNEL (>100 MREM) TOTAL MAN-REM WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT Reactor Operations & Sun'.

Maint. & Construction 9 0 3 2.960 0.085 1. d4 Operations 21 0 0 6.303 0.000 0.038 Health Physics & Lab 4 0 1 6.760 0.000 0.244 Supervisory & Office Staff 1 0 0 0.248 0.069 0.181 Engineering Staff 0 0 0 0.132 0.000 0.018 Routine Plant Maintenance Maint. & Construction 20 0 29 7.954 0.086 9.148 Operations 6 0 0 3.130 0.062 0.126 Health Physics & Lab 60 1 9 12.710 0.202 2.748 Supervisory & OfTice StafT 1 O O 0.295 0.000 0.511 Engineering Staff 1 0 0 0.569 0.000 0.097 Inservice Inspection Maint. & Construction 1 0 23 0.536 0.043 9.646 Operations 0 0 0 0.184 0.017 0.000 Health Physics & Lab 0 0 0 0.003 0.000 0.057 Supervisory & OfTice Staff 0 0 6 0.053 0.258 2.067 Engineering StalT 2 0 2 0.440 0.009 0.408 Special Plant Maintenance

  • Maint, & Construction 84 1 77 40 236 0.618 31.045 Operations i1 0 0 6.500 0.060 0 089 Health Physics & Lab 18 4 36 4.477 0.718 8.639 Supervisory & Office Stafi 6 5 6 1.918 1.009 2.134 Engineering StafT 1 0 8 1.165 0.043 3.285
  • - Refers to special nuintenance not usually performed during normal operations. Most major maintenance is associated with outages. Examples of special maintenance performed in 1995 include: reactor coolant pump seal and motor work, steam generator tube testing and plugging, replacement ofimore detectors, and major outage related maintenance.

l l

2 l

1 1 -

II A (CONTINUED)

VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2 1995 ANNUAL REPORT- PART 1 TECIINICAL SPECIFICATION 6.8.1.2a REPORT OF PERSONNEL EXPOSURE GREATER TIIAN 100 MREM /YR

  1. PERSONNEL P100 MREM) TOTAL MAN-REM l WORK & JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT l Waste Processing l

Maint.& Construction 0 0 0 0.165 0.019 0.000 Operations 3 0 0 1.326 0.000 0.020 J

Health Physics & Lab 12 0 27 4.929 0.038 8.636 Supervisory & Office Staff I O 1 0.253 0.000 0.301 Engineering StalT 0 0 0 0.000 0.000 0.000 Refueling Maint. & Construction 4 0 17 1.582 0.000 7.263 Operations 4 0 0 1.305 0.000 0.000 11calth Physics & Lab 1 0 7 1.058 0.037 2.266 Supervisory & Office Staff 2 0 3 0.277 0.000 0.922 Engineering StalT I O 6 0.496 0.000 2.149 Totals Maint. & Construction 118 1 149 53.433 0.851 58.756 Operations 45 0 0 18.748 0.139 0.273 Health Physics & Lab 95 5 80 23.937 0.995 22.590 Supervisory & Office Staff 11 5 16 3.044 1.336 6.116 Engineering Staff 5 0 16 2.802 0.052 5.957 Grand Totals 274 11 261 101.964 3.373 93.692 Total radiation exposure is 199.029 Rem (99.515 Rem per unit) which constitutes 100% of the site exposure for the year.

3

4 II B VOGTLE ELECTRIC GENERATING PLANT- UNITS I & 2 1995 ANNUAL REPORT- PART 1 TECIINICAL SPECIFICATION 6.8.1.2b REPORT OF PRIMARY COOLANT'S EXCESSIVE SPECIFIC ACTIVITY There were no instances of Units 1 or 2 exceeding the dose equivalent iodine limits or the total specific activity limits, as specified in Technical Specifications, Section 3.4.8, during 1995.

l 4

! 1 i l II C VOGTLE ELECTRIC GENERATING PLANT- UNITS 1 & 2 1995 ANNUAL, REPORT- PART 1 TECIINICAL SPECIFICATION 6.8.1.2c REPORT OF LEAKAGES GREATER TIIAN OR EQUAL TO 0.005 MICROCURIES As required by Technical Specifications Section 3.7.9, leak tests were performed on sealed sources with activity greater than 100 microcuries of beta and/or gamma, or 5 microcuries of alpha radiation. The test results revealed less than 0.005 microcuries of removable contamination or leakage.

l l

(

I $

,