ML20083R509

From kanterella
Jump to navigation Jump to search
Revised Pages for Part 2 of Vogtle 1994 Annual Rept
ML20083R509
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/31/1994
From:
GEORGIA POWER CO.
To:
Shared Package
ML20083R504 List:
References
NUDOCS 9505300059
Download: ML20083R509 (2)


Text

F e

GEORGIA POWER COMPANY VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 NRC DOCKET NOS. 50-424 AND 50-425 FACILITY OPERATING LICENSE NOS. NPF-68 AND NPF-81 1994 ANNUAL REPORT - PART 2 IABLE OF CONTENTS I.

INTRODUCTION 11.

ANNUAL ENVIRONMENTAL OPERATING REPORT III.

ANNUAL RADIOLOGICAL ENVIRONMENTAL SURVEILLANCE REPORT IV.

ANNUAL RADIOLOGICAL EFFLUENT RELEASE REPORT 9503300059 950522

~

PDR ADOCK 05000424 R

PDR

.m._

i

~

ti I

GEORGIA POWER COMPANY VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 NRC DOCKET NOS. 50-424 AND 50-425 FACILITY OPERATING LICENSE NOS. NPF-68 AND NPF-81 INTRODUCTION The Vogtle Electric Generating Plant Units 1 and 2 are powered by pressurized water reactors, each rated at 3565 megawatts thermal. It is located on the Savannah River in Burke County Georgia,34 miles southeast of Augusta. The Unit 1 operating license was received on January 16,1987 and commercial operation started on May 31,1987. Unit 1 is operating in its sixth fuel cycle. Unit 2 received its operating license on February 9, 1989, began commercial operation on May 20,1989. Unit 2 is operating in its fifth fuel cycle.

I 1

4 9

-,-..--.,,,7

,_,.....r...

..m m.

..,m.

- i..,,

,..,-