MONTHYEARML20217G4341999-10-14014 October 1999 Rev C to Proposed TS Change Re Conversion to Improved Standard TSs ML20217G5121999-10-14014 October 1999 Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1 ML20216J3871999-09-29029 September 1999 Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F6071999-06-22022 June 1999 Proposed Tech Specs Re pressure-temp Limits ML20195B8831999-06-0101 June 1999 Proposed Tech Specs,Converting to Improved Std TS ML20206U1421999-05-19019 May 1999 Proposed Tech Specs Revising AOTs for Single Inoperable EDG ML20205K1091999-04-0505 April 1999 Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20199H3611999-01-15015 January 1999 Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr ML20198M8321998-12-30030 December 1998 Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program ML20197G6181998-12-0303 December 1998 Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into Amend ML20154M7181998-10-16016 October 1998 Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant Chemistry ML20236X8041998-08-0303 August 1998 Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6231998-07-10010 July 1998 Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20249B1631998-06-16016 June 1998 Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit Requirements ML20236L2931998-06-0707 June 1998 Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20217K0391998-03-30030 March 1998 Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433 ML20247F7981998-02-26026 February 1998 Proposed Tech Specs Re Allowed Containment Leakage Rate ML20202G8841998-02-0606 February 1998 Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions ML20202D4021998-02-0606 February 1998 Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5621998-02-0606 February 1998 Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20203J6971997-12-12012 December 1997 Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217J0021997-10-14014 October 1997 Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel Storage ML20217G3071997-10-0808 October 1997 Proposed Tech Specs Re Distribution of Inoperable Control Rods ML20211H0801997-09-26026 September 1997 Revised Proposed TS Changes to ASME Section XI, Surveillance Testing ML20236N7061997-09-0909 September 1997 Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20140D8131997-04-14014 April 1997 Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change ML20135B1921996-11-26026 November 1996 Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20134M1751996-11-20020 November 1996 Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on Pp ML20149L7191996-11-0808 November 1996 Proposed Tech Specs Re Min Critical Power Ratio Safety Limit ML20129G0091996-10-23023 October 1996 Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain Deleted ML20128Q7441996-10-11011 October 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month Cycles ML20115G0641996-07-12012 July 1996 Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit ML20113B6511996-06-20020 June 1996 Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing Program ML20112D1531996-05-30030 May 1996 Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5711996-05-30030 May 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements ML20112D2721996-05-30030 May 1996 Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B1996-05-16016 May 1996 Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1171996-04-24024 April 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4511996-04-24024 April 1996 Proposed Tech Specs 3.11.B/4.11.B Re Crescent Area Ventilation ML20101H6741996-03-27027 March 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101H3821996-03-22022 March 1996 Proposed TS Table 3.2-2 Re Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20101F8411996-03-22022 March 1996 Proposed Tech Specs,Implementing BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20097A2271996-02-0101 February 1996 Proposed Tech Specs,Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2991996-01-25025 January 1996 Proposed Tech Specs Re EDGs Surveillance Testing ML20097J6691996-01-25025 January 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellaneous Surveillance Test Intervals to Accommodate 24- Month Operating Cycles ML20095F7091995-12-14014 December 1995 Proposed Tech Specs,Incorporating IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code ML20094R6981995-11-30030 November 1995 Proposed Tech Specs,Extending Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6641995-10-25025 October 1995 Proposed Tech Specs Extending Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5401995-09-15015 September 1995 Proposed Tech Specs Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6561995-07-21021 July 1995 Proposed Tech Specs Re Replacement of title-specific List of PORC Members W/More General Statement of Membership Requirements 1999-09-29
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217G5121999-10-14014 October 1999 Revised Page 285 to TS Re Allowed Containment Leakage Rate, Changing Rev 0 to Rev 1 ML20217G4341999-10-14014 October 1999 Rev C to Proposed TS Change Re Conversion to Improved Standard TSs ML20217D9961999-10-13013 October 1999 Risk-Informed ISI Program Plan for Ja Fitzpatrick ML20216J3871999-09-29029 September 1999 Proposed Tech Specs Pages,Extending LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F6071999-06-22022 June 1999 Proposed Tech Specs Re pressure-temp Limits ML20195B8831999-06-0101 June 1999 Proposed Tech Specs,Converting to Improved Std TS ML20206U1421999-05-19019 May 1999 Proposed Tech Specs Revising AOTs for Single Inoperable EDG ML20205K1091999-04-0505 April 1999 Proposed Tech Specs,Removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20204B6321999-03-21021 March 1999 Plant Referenced Simulation Facility Four Year Performance Testing Rept ML20199H3611999-01-15015 January 1999 Proposed Tech Specs Table 4.1-2 Re Local Power Range Monitor (LPRM) Signal Calibr ML20206P0541998-12-31031 December 1998 Rev 3.2 to EDAMS/RADDOSE-V ML20198M8321998-12-30030 December 1998 Proposed Tech Specs Page 258f Re Configuration Risk Mgt Program ML20197G6181998-12-0303 December 1998 Proposed Tech Specs Reducing Size of Spent Fuel Rack Assembly N3 from 8x13 Cells to 8x12 Cells & Deleting Proposed Inclusion of Fuel Pool Water Level Inadvertent Drainage Into Amend ML20154M7181998-10-16016 October 1998 Proposed Corrected Tech Specs Section 3/4.6.C,relocating Portions of Reactor Coolant Sys - Coolant Chemistry ML20155E7831998-09-15015 September 1998 Rev 2 to Ja FitzPatrick NPP IST Program for Pumps & Valves Third Interval Plan ML20236X8041998-08-0303 August 1998 Proposed Tech Specs Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6231998-07-10010 July 1998 Proposed Tech Specs Pages Re Amend to Relocate TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20249B1631998-06-16016 June 1998 Proposed Tech Specs Re Relocation of Safety Review Committee Review & Audit Requirements ML20236L2931998-06-0707 June 1998 Proposed Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20217K0391998-03-30030 March 1998 Proposed Tech Specs Changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition for LSFT to Be Consistent w/NUREG-1433 B110073, Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy1998-02-28028 February 1998 Rev 1 to GE-NE-B1100732-01, FitzPatrick Reactor Pressure Vessel Surveillance Matls Testing & Analysis Rept of 120 Degree Capsule at 13.4 Efpy ML20247F7981998-02-26026 February 1998 Proposed Tech Specs Re Allowed Containment Leakage Rate ML20202G8841998-02-0606 February 1998 Revised Proposed TS Pages,Revising Allowed Outage Times for 4kV Emergency Bus Trip Functions & Replace Generic Actions for Inoperable Instrument Channels w/function-specific Actions ML20202D4021998-02-0606 February 1998 Proposed Tech Specs Revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5621998-02-0606 February 1998 Proposed Tech Specs Allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20199G5921998-01-0707 January 1998 Rev 0 to JAF-ISI-0003, Third ISI Interval,Ten-Yr ISI Plan ML20199G5661998-01-0606 January 1998 Rev 0 to JAF-ISI-0002, Third ISI Interval,Isi Program. W/28 Oversize Drawings ML20203J6971997-12-12012 December 1997 Proposed Tech Specs,Revising Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217J0021997-10-14014 October 1997 Proposed TS Pages Re Changes to Design Features Section, Including Revised Limits for Fuel Storage ML20217G3071997-10-0808 October 1997 Proposed Tech Specs Re Distribution of Inoperable Control Rods ML20217K5841997-09-30030 September 1997 Rev 1 to Ja FitzPatrick Nuclear Power Plant IST Program for Pumps & Valves,Third Interval ML20211H0801997-09-26026 September 1997 Revised Proposed TS Changes to ASME Section XI, Surveillance Testing ML20236N7061997-09-0909 September 1997 Proposed Tech Specs,Describing Licensee'S Configuration Risk Mgt Program Which Supports Rev of Allowed out-of-svc Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20149G2571997-07-14014 July 1997 JAFNPP ISI Program Relief Requests for 2nd Ten-Yr Interval Closeout ML20140D8131997-04-14014 April 1997 Proposed Tech Specs Re SRC Audit Requirements & Mgt Title Change ML20198G7211997-04-0303 April 1997 Hot Rolled XM-19 Stainless Steel Core Shroud Tie-Rod Matl - Crevice Corrosion Investigation ML20136H3771997-03-11011 March 1997 Rev 0 to Power Uprate Startup Test Rept for Cycle 13 ML20135B1921996-11-26026 November 1996 Proposed Tech Specs,Requesting That Snubber Operability, Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20134M1751996-11-20020 November 1996 Proposed Tech Specs Reflecting Interposed Amend That Was Issued,Updating References to Repts on TS Pp & Changing Rev Bars on Previously Submitted Update Pp Which Were Erroneously Positioned on Pp ML20149L7191996-11-0808 November 1996 Proposed Tech Specs Re Min Critical Power Ratio Safety Limit ML20129G0091996-10-23023 October 1996 Proposed Tech Specs Re Page 134 Deleted Under Amend 236 & Remain Deleted ML20128Q7441996-10-11011 October 1996 Proposed Tech Specs Re Extension of Instrumentation & Miscellanous Surveillance Test to Accommodate 24 Month Cycles ML20135D0311996-07-31031 July 1996 Rev 4 to Radiological Effluent Controls & Offsite Dose Calculation Manual ML20115G0641996-07-12012 July 1996 Proposed Tech Specs Re Cycle 12 Min Critical Power Ratio Safety Limit ML20113B6511996-06-20020 June 1996 Proposed Tech Specs Re Option B to 10CFR50,App J for Primary Containment Leakage Rate Testing Program ML20112D1531996-05-30030 May 1996 Proposed Tech Specs,Revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2721996-05-30030 May 1996 Proposed Tech Specs Re ATWS Recirculation Pump Trip Instrumentation Requirements ML20112D5711996-05-30030 May 1996 Proposed Tech Specs,Eliminating Selected Response Time Testing Requirements JPN-96-023, Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B1996-05-16016 May 1996 Proposed Tech Specs Re Deletion of Requirement for PORC to Review Fire Protection Program & Implementing Procedures. Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1171996-04-24024 April 1996 Proposed Tech Specs,Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day 1999-09-29
[Table view] |
Text
_ _ . - .. .. .
ATTACHMENT I e
Proposed Technical Specification Changes Related to the Inservice Inspection Program New York Power Authority James A. Fitzpatrick Nuclear Power Plant Docket No. 50-333 January 28, 1985 8502050437 850128 PDR ADOCK 05000333
, P. _
PDR
- 1 JAFNPP.
~ '
3.6f(cont'd)' .
4.6-(cont'd)
F. Structural Intearity F. Structural Intearity
-The structural integrity of the 1. . Nondestructive inspections shall Reactor Coolant System shall be be performedLon the ASME Boiler maintained:at<the level' required and Pressure Vessel Code Class 1,
.by the original acceptance stan-- 2 and 3 components and supports dards'throughout the life of the in accordance with the requirements Plant. of the weld and support inservice in-spection program. This inservice inspection program is. based on an NRC approved edition of, and addenda to Section XI of the ASME Boiler and Pressure Vessel Code which is in effect 12 months.or less prior to the beginning of the inspection interval.
- 2. An augmented inservice inspection program is required for those high stressed circumferential piping joints in the main steam and feedwater lines larger-than 4 inches in diameter, where no restraint against pipe whip is provided. The augmented inservice inspection program shall consist of 100 percent inspection of'these welds per inspection interval.
G. Jet Pumps G. Jet Pumps Whenever the reactor is in the Whenever there is recirculation flow l startup/ hot standby or run modes. . with the reactor in the startup/ hot all jet pumps shall be operable. standby or run modes, jet pump oper-If it is determined that a jet pump ability shall be checked daily by is operable,-the reactor shall be verifying that the following conditions placed in a cold condition within do not occur simultaneously:
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Amendment No.
144
JAFNPP
~
3.6 and 4.6 BA888-(cont'd).
not' required to be operable (reactor. Several locations on the main steam coolant temperature 212*F.and the. lines and feedwater. lines are not reactor vessel vented or the reactor' restrained to prevent pipe whip in vessel head removed). ' Permitting. the event of pipe failure at these physics testing and operator locations.,'The physical layout training-under these conditions within-the drywell precludes re-would not. place the plant in an straints at these points. Unre-Unsafe condition. strained high stress areas have been identified in these lines where F. Structural Inteority breaks.could result in pipe whip such that the pipe could impact the A pre-service inspection of the primary containment wall. Augmented ASME Code Class 1 components was inservice inspection of these weld performed after site erection to locations shall be performed during assure the system was free of gross each inspection period.
defects. An initial inspection program as detailed in Appendix F In addition, visual inspection in ac-of the FSAR was developed and cordance with the approved ASME code will based on an approved edition of the be made during periodic pressure and ASME Code. hydrostatic tests of critical systems.
The inspection program specified en-compasses the major areas of the The program has been expanded to in- vessel and piping system within clude the requirements of later, the drywell. The inspection period is' approved ASME Code editions and based on the observed rate of defect addenda as far as practicable. The growth from fatigue studies sponsored importance of these inspections is by the AEC.
recognized, and efforts to develop practical new alternative methods These studies show that thousands of assuring plant inservice integrity of stress cycles, at stresses be-will continue. This inspection pro- yond any expected to occur in a gram should assure the detection of Reactor Coolant System, were required
. problem areas well before they re- to propagate a crack. The test present a significant impact on safety.
Amendment No.
153
JAFNPP PAGES 157 THROUGH AND INCLUDING 162 HAVE BEEN INTENTIONALLY LEFT BLANK f
?
f
' l i
4 1
l i
l
- [
Atendment No.
157-162
-h + ~ ,
y ATTACHMENT II Proposed Technical Specification Changes Related to the Inservice Inspection Program New York Power Authority James A.-FitzPatrick Nuclear Power Plant Docket No. 50-333 f
January 28, 1985-1 6
l I
I. Description of the Proposed Chances
~The proposed changes to the FitzPatrick Technical Specifications relate to the Inservice Inspection (ISI) program for pressure retaining components and their supports.
Specifically, the following changes are being proposed:
On page 144, Section 4.6.F.1 is completely rewritten to read, "1. Nondestructive inspections shall be performed on the ASME Boiler and Pressure Vessel Code Class 1,2'and 3 components and supports in accordance with the requirements of the weld and support inservice inspection program. This inservice '
inspection program is based on an NRC approved edition'of and addenda to Section XI of the ASME ,
Boiler and Pressure Vessel Code which is in '
effect'12 months or less prior to the beginning of the inspection interval."
On page 144, modify Section 4.6.F.2 to read, "An' augmented inservice inspection program is required for those high stressed circumferential piping joints in the main steam and feedwater lines larger than 4 inches in diameter, where no restraint against pipe whip is provided. The augmented inservice inspection program shall consist of 100-percent inspection of these welds per inspection interval."
On page 153 modify Section F to' read, "Aspre-serviceJinspection of the ASME Code Class I. components was performed after site erection to assure-the-system was free:of gross defects. ' An initial inspection program as detailed in
'Apppendix F ofethe FSAR was developed and based on an_ approved-edition of'Section XI of the ASKE Code.
e -, --.,e w- , , - . = -m -- -.--vem-,-, ,,,+m-e- -.mer---,
=e-
~
The program has been. expanded to include the requirements of later, approved ASME Code editions and addenda as far as practicable. The importance of these inspections is. recognized, and efforts to develop practical new alternative methods of assuring plant inservice integrity will continue. This inspection program should assure the detection of problem areas well before-they represent a significant impact on safety.
Several locations on the main steam lines and feedwater lines are not restrained to prevent pipe whip in the event of pipe failure at these locations. The physical
-layout within the drywell precludes restraints at these points. ' Unrestrained high stress areas have been-identified in these lines where breaks could result in pipe whip such that the pipe could impact the primary containment wall. Augmented inservice inspection of these weld locations shall be performed during each inspection period.
In addition, visual inspection in accordance'with the approved ASME Code will'be made during pressure and hydrostatic. tests of critical. systems.
The inspection program specified encompasses the major areas'of the-vessel and piping systems within-the'drywell.
The inspection period is based on observed rate of defect ~ growth from fatigue studies sponsored by the AEC.
These studies show that thousands of stress cycles, at stresses.beyond any expected to occur in a Reactor Coolant System, were required to propagate a crack. The test"...
Delete ~ Table 4/6-l'on pages 157 through 162.
IIi> Purpose of the' Proposed Chances
'The proposed changes are.necessary to allow the revision of the.FitzPatrick weld and support ISI program to comply with the requirements of the later editions of the ASME Boiler'and Pressure-Vessel' Code,Section XI.
m
The revision-of theLISI Program and this amendment are required by 10 CFR 50.55 a (g)
(4) (ii) and.(5)(i).- This revision of the
. inspection program is to allow the incorporation of~ improved examination techniques and sampling plans that may have been develop 6d during the previous 120 month interval.
-III. Impact of the Proposed Chances The ISI program provides continued assurance of structural integrity of the pressure-retaining components of critical systems that contain radioactive and/or high pressure fluids, or that provide for safe shutdown of the plant in either normal or accident conditions. The proposed changes will allow the program to reflect industry experience and increased understanding of service induced failure mechanisms, and detection. This experience and-knowledge is reflected in the require-ments of newer editions of Section XI of the ASME Code approved for use by the.NRC. The revised inspection pro-
~
gram represents an expanded and more clearly defined sampling plan of ox-amination of pressure retaining comp-
- onents'and their supports. For these reasons, operation of the FitzPatrick Plant in accordance1with the proposed amendments would not:
(1) involve a significant increase in-the L probability or consequences of an acci-(f ~ .. dent previously evaluated;1or create the possibility of a new or (2) ' different kind of accident from any l -
t
< accidentipreviously evaluated; or L (3) involve a significant reduction in a margin L ,
.of safety..
t-4IV. Implementation'of the' Chances 9 Implementation of the changes,Jas proposed, s< will'not; impact the fire protection. pro--
p .g ram at FitzPatrick, nor-will the changes impact the environment.
{'
(
- .n V. Conclusion The incorporation of these changes
a) will not increase the probability or the consequences of an accident or malfunction of equipment important to safety as evaluated previously in the Safety Analysis Report (SAR):
b) will not increase the possibility of an accident or malfunction of a type other that that evaluated previously in the SAR:
c) will not reduce the margin of safety as defined in the basis for any Technical Specification;
.d) does not constitute'an unreviewed safety
- question; and e) involves no significant hazards considerations, as defined in 10 CPR 50.92.
VI.
References:
- 1. James A..FitzPa' trick Nuclear Power Plant Safety Evaluation Report (SER).
2.- ' James 1A. FitzPatrick Nuclear Power' Plant Final. Safety Analysis Report (FSAR), Rev.
1, July 1983.
- 3. ASME Boiler and Pressure Vessel Code Section XI.
J L 4. 10CFR50.55. '