ML20078L456

From kanterella
Revision as of 17:29, 24 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev to 940805 Application for Amend to License NPF-57,re EDG Surveillance Changes
ML20078L456
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/21/1994
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078L464 List:
References
NLR-N94201, NUDOCS 9411300125
Download: ML20078L456 (3)


Text

- -- . . ~ . ~ -

4 4

=

Pubhc Service Electne at Gas Company Stanley LaBruna Public Service Electnc and Gas Cornpany P.o. Box 236. Hancocks Bridge, NJ 08038 609-339 1700

u. . - - % . ""

NoV 211994 NLR-N94201 LCR 94-10 LCR 94-13 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

REVISION TO REQUEST FOR AMENDMENT EMERGENCY DIESEL GENERATOR BURVEILLANCE CHANGES FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 ,

The purpose of this letter is to modify Public Service Electric and Gas Company's (PSE&G's) request for license amendment for the Hope Creek Generating Station, dated August 5, 1994 (NLR-N94127).

The original amendment request would have, in part, permitted the diesel generator hot restart test to be performed within 5 minutes of a minimum of one hour of operation at full load. The present Technical Specifications require the hot restart test to be performed within five minutes of the diesel generator 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> endurance run. PSE&G hereby amends the proposed change to require a minimum two hour run at full load prior to performing the diesel generator hot restart test.

PSE&G is also making editorial modifications of the proposed changes to Technical Specifications 3.8.1.1, ACTION statements (b.) and (c.), and to Surveillance Requirement 4.8.1.1.2.h.8 in order to clarify the new requirements. These changes were discussed with Dave Moran and Om Chopra during teleconferences held on November 1 and 2, 1994.

The above changes do not change nor modify any of the conclusions-stated in the Significant Hazards Consideration Evaluations previously submitted for License Change Requests (LCRs) 94-10 and 94-13. However, the above modifications did result in changes to the marked-up Technical Specification pages previously transmitted via the August 5, 1994, submittal. Attachment 1 of this letter contains the revised marked-up Technical Specification pages which provide the above changes.

Finally, PSE&G is revising Attachment 3 of the August 5, 1994, submittal to reflect the above changes. The revised page is contained in Attachment 2 of this letter.

anon 1c 9411300125 941121 0 fDR ADOCK 05000354 PDR 1 g

NOV 211994 Document Control Desk NLR-N94201 Pursuant to the requirements of 10CFR50.91(b) (1) , a copy of this submittal has been sent to the state of New Jersey.

Should you have any questions or comments on this submittal, please do not hesitate to contact us.

Sincerely,

~

f/ J/ww Affidavit Attachment C Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. D. Moran, Licensing Project Manager - Hope Creek U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. R. Summers (SO9)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 i

l I

.s...>> !

l 1

REF: NLR-N94201 '

LCR 94-10 LCR 94-13 STATE OF NEW JERSEY )

) SS.

COUNTY OF SALEM )

S. LaBruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated , concerning the Hope Creek Generating Station, are true to the best of my knowledge, information and belief.

/

Subscribed and Sworn to before me this at , day of 67aAn 261, 1994

) /

W 3lUAAW bl6ULn1.

IfotaryPublfcbfNewJersey KlMBERlY JO BROWN NOTARY PUBLIC Of NEW JERSEY My Commission expires on My commission r,p;,,,3ng ,, ,ggg i

I