ML20065F725
From kanterella
ML20065F725 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 09/28/1982 |
From: | Herrick R, Vosbury F FRANKLIN INSTITUTE |
To: | Peter Hearn NRC |
Shared Package | |
ML15238A677 | List: |
References | |
CON-NRC-03-81-130, CON-NRC-3-81-130 IEB-80-04, IEB-80-4, TAC-46847, TAC-46848, TAC-46849, TER-C5506-134, NUDOCS 8210010400 | |
Download: ML20065F725 (23) | |
Similar Documents at Oconee | |
---|---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20062J2741993-08-31031 August 1993
[Table view]Technical Evaulation Rept, Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11 ML20091J0951991-12-20020 December 1991 Final Technical Evaluation Rept - Oconee Nuclear Station, Station Blackout Evaluation ML20072P6711990-04-24024 April 1990 Second Interval Inservice Insp Program Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20245E9271988-08-31031 August 1988 Technical Evaluation Rept,Tmi Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Oconee Units 1,2 & 3 ML20236E2251987-10-31031 October 1987 PRA Application Program for Inspection at Oconee Unit 3 ML20235X5301987-08-31031 August 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface Oconee 1,2 & 3 ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20215G2851987-03-31031 March 1987 Technical Evaluation Rept for Oconee Nuclear Station Units 1,2 & 3 Response to Us Nrc,Nrr Generic Ltr 83-37, Informal Rept ML20195G2521987-03-31031 March 1987 Conformance to Reg Guide 1.97,Oconee Nuclear Station,Units 1,2 & 3, Final Informal Rept ML20199J2041986-06-30030 June 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment Containment Performance,Radiological Source Terms and Risk Estimates ML20154R3891986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. Internal Events,Core Damage Frequency ML20155K5791986-03-31031 March 1986 an Assessment of the Safety Implications of Control at the Oconee 1 Nuclear Plant Final Report ML20154R3921986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. External Events,Core Damage Frequency ML20211G9431985-12-30030 December 1985 Preliminary Development of an Integrated Approach to the Evaluation of Pressurized Thermal Shock as Applied to the Oconee Unit 1 Nuclear Power Plant ML20210K6451985-11-30030 November 1985 PRA Insights ML20138Q6901985-10-31031 October 1985 Failure Modes and Effects Analysis (FMEA) of the Ics/Nni Electric Power Distribution Circuitry at the OCONEE-1 Nuclear Plant ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20135D3441985-08-31031 August 1985 Trac Analyses of Severe Overcooling Transients for the OCONEE-1 PWR ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20128G4881985-05-31031 May 1985 Conformance to Reg Guide 1.97,Oconee Nuclear Station, Units 1,2 & 3 ML20116P1191985-04-30030 April 1985 Assessment of Selected Trac and RELAP5 Calculations for OCONEE-1 Pressurized Thermal Shock Study ML20209E5171985-04-30030 April 1985 Dominant Accident Sequences in OCONEE-1 Pressurized Water Reactor ML20127C4291985-01-11011 January 1985 Evaluation of Supplemental Info for Detailed Control Room Review,Summary Rept for Oconee Nuclear Station Units 1,2 & 3, Suppl to Final Technical Evaluation Rept ML20108B4011984-09-30030 September 1984 Draft Final Rept,Vol 1, Assessment of Safety Implications of Control at Oconee-1 Nuclear Plant ML20097F3331984-07-31031 July 1984 Possible Modes of Steam Generator Overfill Resulting from Control System Malfunctions at OCONEE-1 Nuclear Plant ML20093J6861984-07-20020 July 1984 Evaluation of Detailed Control Room Design Review Summary Rept for Oconee Nuclear Station,Units 1,2 & 3, Final Technical Evaluation Rept ML20151K2191984-04-24024 April 1984 Preliminary Draft Evaluation of Control Sys Failures Leading to RCS Overcooling in Oconee 1 Power Plant. NUREG/CR-3692, Possible Modes of Steam Generator Overfill Resulting from Control Sys Malfunctions... Encl ML20080F2931984-02-0404 February 1984 Trac Analyses of Severe Overcooling Transients for Oconee-1 Pwr ML20105C7611984-02-0202 February 1984 Masonry Wall Design,Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20080C2531983-07-31031 July 1983 RELAP5 Thermal-Hydraulic Analysis of Pressurized Thermal Shock Sequences for Oconee-1 Pwr ML20077K8341983-04-0606 April 1983 Selected Operating Reactor Issues Program Ii,Rcs Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J7481983-03-31031 March 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Interim Rept ML20072S6701983-03-31031 March 1983 Control of Heavy Loads (C-10), Oconee Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20073E2841983-03-14014 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 3, Technical Evaluation Rept ML20073E2721983-03-11011 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 2, Technical Evaluation Rept ML20073E2681983-03-0808 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 1, Technical Evaluation Rept ML20065B2281983-01-31031 January 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Informal Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20065F7251982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20062B0781982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations: Oconee Case Study.Docket Nos. 50-269 and 50-270.(Duke Power Company) ML20054F6381982-06-0404 June 1982 Audit of Oconee Procedures & Training for Pressurized Thermal Shock ML20244B5611981-08-0606 August 1981 Containment Leakage Rate Testing,Oconee Units 1,2 & 3, Technical Evaluation Rept ML20039F0341981-05-31031 May 1981 Reactor Safety Study Methodology Applications Program: Oconee #3 PWR Power Plant ML20080J3091981-04-17017 April 1981 Metallurgical,Stress & Fracture Mechanics Analyses of Cracked Steam Generator Manway Studs from Oconee Unit 3 of Duke Power Co ML20080J3211981-04-17017 April 1981 Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co ML19309C4711980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station, Informal Rept ML19296C9781979-11-30030 November 1979 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station,Units 1,2 & 3, Informal Rept 1993-08-31 Category:QUICK LOOK MONTHYEARML20062J2741993-08-31031 August 1993
[Table view]Technical Evaulation Rept, Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11 ML20091J0951991-12-20020 December 1991 Final Technical Evaluation Rept - Oconee Nuclear Station, Station Blackout Evaluation ML20072P6711990-04-24024 April 1990 Second Interval Inservice Insp Program Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20245E9271988-08-31031 August 1988 Technical Evaluation Rept,Tmi Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Oconee Units 1,2 & 3 ML20236E2251987-10-31031 October 1987 PRA Application Program for Inspection at Oconee Unit 3 ML20235X5301987-08-31031 August 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface Oconee 1,2 & 3 ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20215G2851987-03-31031 March 1987 Technical Evaluation Rept for Oconee Nuclear Station Units 1,2 & 3 Response to Us Nrc,Nrr Generic Ltr 83-37, Informal Rept ML20195G2521987-03-31031 March 1987 Conformance to Reg Guide 1.97,Oconee Nuclear Station,Units 1,2 & 3, Final Informal Rept ML20199J2041986-06-30030 June 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment Containment Performance,Radiological Source Terms and Risk Estimates ML20154R3891986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. Internal Events,Core Damage Frequency ML20155K5791986-03-31031 March 1986 an Assessment of the Safety Implications of Control at the Oconee 1 Nuclear Plant Final Report ML20154R3921986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. External Events,Core Damage Frequency ML20211G9431985-12-30030 December 1985 Preliminary Development of an Integrated Approach to the Evaluation of Pressurized Thermal Shock as Applied to the Oconee Unit 1 Nuclear Power Plant ML20210K6451985-11-30030 November 1985 PRA Insights ML20138Q6901985-10-31031 October 1985 Failure Modes and Effects Analysis (FMEA) of the Ics/Nni Electric Power Distribution Circuitry at the OCONEE-1 Nuclear Plant ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20135D3441985-08-31031 August 1985 Trac Analyses of Severe Overcooling Transients for the OCONEE-1 PWR ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20128G4881985-05-31031 May 1985 Conformance to Reg Guide 1.97,Oconee Nuclear Station, Units 1,2 & 3 ML20116P1191985-04-30030 April 1985 Assessment of Selected Trac and RELAP5 Calculations for OCONEE-1 Pressurized Thermal Shock Study ML20209E5171985-04-30030 April 1985 Dominant Accident Sequences in OCONEE-1 Pressurized Water Reactor ML20127C4291985-01-11011 January 1985 Evaluation of Supplemental Info for Detailed Control Room Review,Summary Rept for Oconee Nuclear Station Units 1,2 & 3, Suppl to Final Technical Evaluation Rept ML20108B4011984-09-30030 September 1984 Draft Final Rept,Vol 1, Assessment of Safety Implications of Control at Oconee-1 Nuclear Plant ML20097F3331984-07-31031 July 1984 Possible Modes of Steam Generator Overfill Resulting from Control System Malfunctions at OCONEE-1 Nuclear Plant ML20093J6861984-07-20020 July 1984 Evaluation of Detailed Control Room Design Review Summary Rept for Oconee Nuclear Station,Units 1,2 & 3, Final Technical Evaluation Rept ML20151K2191984-04-24024 April 1984 Preliminary Draft Evaluation of Control Sys Failures Leading to RCS Overcooling in Oconee 1 Power Plant. NUREG/CR-3692, Possible Modes of Steam Generator Overfill Resulting from Control Sys Malfunctions... Encl ML20080F2931984-02-0404 February 1984 Trac Analyses of Severe Overcooling Transients for Oconee-1 Pwr ML20105C7611984-02-0202 February 1984 Masonry Wall Design,Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20080C2531983-07-31031 July 1983 RELAP5 Thermal-Hydraulic Analysis of Pressurized Thermal Shock Sequences for Oconee-1 Pwr ML20077K8341983-04-0606 April 1983 Selected Operating Reactor Issues Program Ii,Rcs Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J7481983-03-31031 March 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Interim Rept ML20072S6701983-03-31031 March 1983 Control of Heavy Loads (C-10), Oconee Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20073E2841983-03-14014 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 3, Technical Evaluation Rept ML20073E2721983-03-11011 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 2, Technical Evaluation Rept ML20073E2681983-03-0808 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 1, Technical Evaluation Rept ML20065B2281983-01-31031 January 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Informal Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20065F7251982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20062B0781982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations: Oconee Case Study.Docket Nos. 50-269 and 50-270.(Duke Power Company) ML20054F6381982-06-0404 June 1982 Audit of Oconee Procedures & Training for Pressurized Thermal Shock ML20244B5611981-08-0606 August 1981 Containment Leakage Rate Testing,Oconee Units 1,2 & 3, Technical Evaluation Rept ML20039F0341981-05-31031 May 1981 Reactor Safety Study Methodology Applications Program: Oconee #3 PWR Power Plant ML20080J3091981-04-17017 April 1981 Metallurgical,Stress & Fracture Mechanics Analyses of Cracked Steam Generator Manway Studs from Oconee Unit 3 of Duke Power Co ML20080J3211981-04-17017 April 1981 Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co ML19309C4711980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station, Informal Rept ML19296C9781979-11-30030 November 1979 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station,Units 1,2 & 3, Informal Rept 1993-08-31 Category:ETC. (PERIODIC MONTHYEARML20062J2741993-08-31031 August 1993
[Table view]Technical Evaulation Rept, Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11 ML20091J0951991-12-20020 December 1991 Final Technical Evaluation Rept - Oconee Nuclear Station, Station Blackout Evaluation ML20072P6711990-04-24024 April 1990 Second Interval Inservice Insp Program Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20245E9271988-08-31031 August 1988 Technical Evaluation Rept,Tmi Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Oconee Units 1,2 & 3 ML20236E2251987-10-31031 October 1987 PRA Application Program for Inspection at Oconee Unit 3 ML20235X5301987-08-31031 August 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface Oconee 1,2 & 3 ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20215G2851987-03-31031 March 1987 Technical Evaluation Rept for Oconee Nuclear Station Units 1,2 & 3 Response to Us Nrc,Nrr Generic Ltr 83-37, Informal Rept ML20195G2521987-03-31031 March 1987 Conformance to Reg Guide 1.97,Oconee Nuclear Station,Units 1,2 & 3, Final Informal Rept ML20199J2041986-06-30030 June 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment Containment Performance,Radiological Source Terms and Risk Estimates ML20154R3891986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. Internal Events,Core Damage Frequency ML20155K5791986-03-31031 March 1986 an Assessment of the Safety Implications of Control at the Oconee 1 Nuclear Plant Final Report ML20154R3921986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. External Events,Core Damage Frequency ML20211G9431985-12-30030 December 1985 Preliminary Development of an Integrated Approach to the Evaluation of Pressurized Thermal Shock as Applied to the Oconee Unit 1 Nuclear Power Plant ML20210K6451985-11-30030 November 1985 PRA Insights ML20138Q6901985-10-31031 October 1985 Failure Modes and Effects Analysis (FMEA) of the Ics/Nni Electric Power Distribution Circuitry at the OCONEE-1 Nuclear Plant ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20135D3441985-08-31031 August 1985 Trac Analyses of Severe Overcooling Transients for the OCONEE-1 PWR ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20128G4881985-05-31031 May 1985 Conformance to Reg Guide 1.97,Oconee Nuclear Station, Units 1,2 & 3 ML20116P1191985-04-30030 April 1985 Assessment of Selected Trac and RELAP5 Calculations for OCONEE-1 Pressurized Thermal Shock Study ML20209E5171985-04-30030 April 1985 Dominant Accident Sequences in OCONEE-1 Pressurized Water Reactor ML20127C4291985-01-11011 January 1985 Evaluation of Supplemental Info for Detailed Control Room Review,Summary Rept for Oconee Nuclear Station Units 1,2 & 3, Suppl to Final Technical Evaluation Rept ML20108B4011984-09-30030 September 1984 Draft Final Rept,Vol 1, Assessment of Safety Implications of Control at Oconee-1 Nuclear Plant ML20097F3331984-07-31031 July 1984 Possible Modes of Steam Generator Overfill Resulting from Control System Malfunctions at OCONEE-1 Nuclear Plant ML20093J6861984-07-20020 July 1984 Evaluation of Detailed Control Room Design Review Summary Rept for Oconee Nuclear Station,Units 1,2 & 3, Final Technical Evaluation Rept ML20151K2191984-04-24024 April 1984 Preliminary Draft Evaluation of Control Sys Failures Leading to RCS Overcooling in Oconee 1 Power Plant. NUREG/CR-3692, Possible Modes of Steam Generator Overfill Resulting from Control Sys Malfunctions... Encl ML20080F2931984-02-0404 February 1984 Trac Analyses of Severe Overcooling Transients for Oconee-1 Pwr ML20105C7611984-02-0202 February 1984 Masonry Wall Design,Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20080C2531983-07-31031 July 1983 RELAP5 Thermal-Hydraulic Analysis of Pressurized Thermal Shock Sequences for Oconee-1 Pwr ML20077K8341983-04-0606 April 1983 Selected Operating Reactor Issues Program Ii,Rcs Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J7481983-03-31031 March 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Interim Rept ML20072S6701983-03-31031 March 1983 Control of Heavy Loads (C-10), Oconee Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20073E2841983-03-14014 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 3, Technical Evaluation Rept ML20073E2721983-03-11011 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 2, Technical Evaluation Rept ML20073E2681983-03-0808 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 1, Technical Evaluation Rept ML20065B2281983-01-31031 January 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Informal Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20065F7251982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20062B0781982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations: Oconee Case Study.Docket Nos. 50-269 and 50-270.(Duke Power Company) ML20054F6381982-06-0404 June 1982 Audit of Oconee Procedures & Training for Pressurized Thermal Shock ML20244B5611981-08-0606 August 1981 Containment Leakage Rate Testing,Oconee Units 1,2 & 3, Technical Evaluation Rept ML20039F0341981-05-31031 May 1981 Reactor Safety Study Methodology Applications Program: Oconee #3 PWR Power Plant ML20080J3091981-04-17017 April 1981 Metallurgical,Stress & Fracture Mechanics Analyses of Cracked Steam Generator Manway Studs from Oconee Unit 3 of Duke Power Co ML20080J3211981-04-17017 April 1981 Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co ML19309C4711980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station, Informal Rept ML19296C9781979-11-30030 November 1979 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station,Units 1,2 & 3, Informal Rept 1993-08-31 Category:TEXT-PROCUREMENT & CONTRACTS MONTHYEARML20062J2741993-08-31031 August 1993
[Table view]Technical Evaulation Rept, Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11 ML20091J0951991-12-20020 December 1991 Final Technical Evaluation Rept - Oconee Nuclear Station, Station Blackout Evaluation ML20072P6711990-04-24024 April 1990 Second Interval Inservice Insp Program Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20236B8051989-03-13013 March 1989 Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files ML20245E9271988-08-31031 August 1988 Technical Evaluation Rept,Tmi Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Oconee Units 1,2 & 3 ML20236E2251987-10-31031 October 1987 PRA Application Program for Inspection at Oconee Unit 3 ML20235X5301987-08-31031 August 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface Oconee 1,2 & 3 ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20215G2851987-03-31031 March 1987 Technical Evaluation Rept for Oconee Nuclear Station Units 1,2 & 3 Response to Us Nrc,Nrr Generic Ltr 83-37, Informal Rept ML20195G2521987-03-31031 March 1987 Conformance to Reg Guide 1.97,Oconee Nuclear Station,Units 1,2 & 3, Final Informal Rept ML20199J2041986-06-30030 June 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment Containment Performance,Radiological Source Terms and Risk Estimates ML20154R3891986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. Internal Events,Core Damage Frequency ML20155K5791986-03-31031 March 1986 an Assessment of the Safety Implications of Control at the Oconee 1 Nuclear Plant Final Report ML20154R3921986-03-31031 March 1986 a Review of the OCONEE-3 Probabilistic Risk Assessment. External Events,Core Damage Frequency ML20211G9431985-12-30030 December 1985 Preliminary Development of an Integrated Approach to the Evaluation of Pressurized Thermal Shock as Applied to the Oconee Unit 1 Nuclear Power Plant ML20210K6451985-11-30030 November 1985 PRA Insights ML20138Q6901985-10-31031 October 1985 Failure Modes and Effects Analysis (FMEA) of the Ics/Nni Electric Power Distribution Circuitry at the OCONEE-1 Nuclear Plant ML20151U3481985-10-15015 October 1985 Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept ML20135D3441985-08-31031 August 1985 Trac Analyses of Severe Overcooling Transients for the OCONEE-1 PWR ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20128G4881985-05-31031 May 1985 Conformance to Reg Guide 1.97,Oconee Nuclear Station, Units 1,2 & 3 ML20116P1191985-04-30030 April 1985 Assessment of Selected Trac and RELAP5 Calculations for OCONEE-1 Pressurized Thermal Shock Study ML20209E5171985-04-30030 April 1985 Dominant Accident Sequences in OCONEE-1 Pressurized Water Reactor ML20127C4291985-01-11011 January 1985 Evaluation of Supplemental Info for Detailed Control Room Review,Summary Rept for Oconee Nuclear Station Units 1,2 & 3, Suppl to Final Technical Evaluation Rept ML20108B4011984-09-30030 September 1984 Draft Final Rept,Vol 1, Assessment of Safety Implications of Control at Oconee-1 Nuclear Plant ML20097F3331984-07-31031 July 1984 Possible Modes of Steam Generator Overfill Resulting from Control System Malfunctions at OCONEE-1 Nuclear Plant ML20093J6861984-07-20020 July 1984 Evaluation of Detailed Control Room Design Review Summary Rept for Oconee Nuclear Station,Units 1,2 & 3, Final Technical Evaluation Rept ML20151K2191984-04-24024 April 1984 Preliminary Draft Evaluation of Control Sys Failures Leading to RCS Overcooling in Oconee 1 Power Plant. NUREG/CR-3692, Possible Modes of Steam Generator Overfill Resulting from Control Sys Malfunctions... Encl ML20080F2931984-02-0404 February 1984 Trac Analyses of Severe Overcooling Transients for Oconee-1 Pwr ML20105C7611984-02-0202 February 1984 Masonry Wall Design,Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20080C2531983-07-31031 July 1983 RELAP5 Thermal-Hydraulic Analysis of Pressurized Thermal Shock Sequences for Oconee-1 Pwr ML20077K8341983-04-0606 April 1983 Selected Operating Reactor Issues Program Ii,Rcs Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20072J7481983-03-31031 March 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Interim Rept ML20072S6701983-03-31031 March 1983 Control of Heavy Loads (C-10), Oconee Nuclear Power Station Units 1,2 & 3, Technical Evaluation Rept ML20073E2841983-03-14014 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 3, Technical Evaluation Rept ML20073E2721983-03-11011 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 2, Technical Evaluation Rept ML20073E2681983-03-0808 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 1, Technical Evaluation Rept ML20065B2281983-01-31031 January 1983 Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Informal Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20065F7251982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation Rept ML20062B0781982-07-31031 July 1982 Socioeconomic Impacts of Nuclear Generating Stations: Oconee Case Study.Docket Nos. 50-269 and 50-270.(Duke Power Company) ML20054F6381982-06-0404 June 1982 Audit of Oconee Procedures & Training for Pressurized Thermal Shock ML20244B5611981-08-0606 August 1981 Containment Leakage Rate Testing,Oconee Units 1,2 & 3, Technical Evaluation Rept ML20039F0341981-05-31031 May 1981 Reactor Safety Study Methodology Applications Program: Oconee #3 PWR Power Plant ML20080J3091981-04-17017 April 1981 Metallurgical,Stress & Fracture Mechanics Analyses of Cracked Steam Generator Manway Studs from Oconee Unit 3 of Duke Power Co ML20080J3211981-04-17017 April 1981 Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co ML19309C4711980-02-29029 February 1980 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station, Informal Rept ML19296C9781979-11-30030 November 1979 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station,Units 1,2 & 3, Informal Rept 1993-08-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20065F725&oldid=2725514"