Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 06/04/1993 |
From: | EQE, INC. |
To: | |
Shared Package | |
ML20065L779 | List: |
References | |
42103-C-001, 42103-C-001-R00, 42103-C-1, 42103-C-1-R, NUDOCS 9404210294 | |
Download: ML20065L794 (100) | |
Similar Documents at Pilgrim | |
---|---|
Category:ARCHIVE RECORDS
MONTHYEARML20202B5081999-01-0808 January 1999
[Table view]Rev 2 to Calculation M-734, RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20217H3291998-02-23023 February 1998 Rev 0 to Calculation M-778, Evaluation of RPV Flange to Adjacent Shell 145 Deg F Differential Temp Limit ML20202B4981997-12-22022 December 1997 Rev E3 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20203A1231997-12-18018 December 1997 Rev 3 to M500, Range of Salt Svc Water Sys Header Pressures & Pump Flows ML20203A1111997-11-21021 November 1997 Rev 0 to M-771, RBCCW Heatup Immediately Following DBA- Loca ML20148T5101997-04-11011 April 1997 Rev E2 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20137W2901997-04-11011 April 1997 Rev 0 to RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20133N6071996-03-20020 March 1996 Rev E1 to RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20141D2521996-01-19019 January 1996 Rev 4 to PS-79, EDG Loading ML20249B4451996-01-0404 January 1996 Rev 0 to Calculation C15.0.3270, Fuel Pool Cooling He E206A & E206B GIP Evaluation ML20249B4461996-01-0404 January 1996 Rev 0 to Calculation C15.0.3273, RHR Heat Exchanger E207A & E207B GIP Evaluation ML20092G9381995-06-29029 June 1995 Scram Times for Tech Spec 3.3.C.1 ML20117K8601994-01-31031 January 1994 Rev 0, Fragility Analysis of SBO Dg,Pilgrim Nuclear Power Station ML20249B4731994-01-0808 January 1994 Rev 0 to Calculation C15.0.3216, LAR 016 Location:Reactor Bldg Ei 23'-0 ML20249B4661993-11-0808 November 1993 Rev 0 to Calculation C15.0.3216, LAR 017 Location:Reactor Bldg El 37'-0 ML20249B4811993-11-0606 November 1993 Rev 0 to Calculation C15.0.3216 for LAR 024 Location:Aux Bay Bldg Ei 3'-0 ML20249B4541993-10-25025 October 1993 Rev 0 to Calculation C15.0.3216, LAR 005 Location:Turbine Bldg Ei 37'-0 ML20058P2211993-07-29029 July 1993 Package Consisting of Attachment to Employee Concerns Programs ML20117K8511993-06-30030 June 1993 Ipeee,Building Structures Fragility Analysis. Rev 1 ML20065L7941993-06-0404 June 1993 Reactor Building Seismic Model ML20064K8411993-01-26026 January 1993 Soil Properties for SSI Analysis for Pilgrim Site ML20099B5521992-05-0505 May 1992 Audit 92050S, Scientific Ecology Group Supplier Implementation & Qualification, Conducted on 920324-27 ML20118A3561992-03-24024 March 1992 Scientific Ecology Group,Supplier Implementation & Qualification Audit 92050S ML20086T2241991-12-19019 December 1991 Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment ML20079M9561991-11-11011 November 1991 Response to NUMARC Auquatic Resource Questions,Socioeconomic Questions for All Utils & Waste Mgt Questions ML20011F4471990-01-19019 January 1990 Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop. ML20011F4721990-01-19019 January 1990 Operability Evaluation of Salt Svc Water Pump Columns. ML20079M9811989-12-31031 December 1989 Response to NUMARC Survey Re Approximate Number & Cause for Most Notable Fish Mortalities at Pilgrim Nuclear Station for Period of 1973-1989 ML20106A6371989-03-0303 March 1989 Spec C-114-ER-Q-EO, Pilgrim Unit 1 Spec for Seismic Response Spectra ML20151W1811988-08-16016 August 1988 Attachment I to Ltr,Consisting of Response to Allegation a Re Deliberate Reduction of Radiation Survey Results to Avoid Further Surveys ML20238E6921987-12-30030 December 1987 Packages Consisting of marked-up Rev 0 to Safety Evaluation 2144 & Slides of Facility Safety Enhancement Mods ML20236R0801987-11-18018 November 1987 Package Consisting of Viewgraphs Re Util Simulator Status, Requalification Plans for Reactor Operators/Senior Reactor Operators Prior to Startup,Training Schedule & Control of Reactor Operator/Senior Reactor Operator Overtime ML20236N8471987-11-12012 November 1987 Package of Documents Re Util Actions Concerning ATWS, Including Purchase Orders,Correspondence W/Ge,Work Instructions,Field Rev Notices & Maint Requests ML20236Y6151987-11-0505 November 1987 News Article Re Shutdown of Facility for Six More Wks to Deal W/Mgt Troubles ML20237A1151987-11-0505 November 1987 FSAR Section 5, Containment ML20236K8561987-07-22022 July 1987 Calculation M-300 Re Cable Fire Heating of Torus Compartment Ceiling Beams ML20236Y6171987-07-0909 July 1987 Newsarticle Entitled, Judges Asked to Limit Pilgrim Picketing ML20237A0171986-06-28028 June 1986 Newsarticle Entitled, Two Towns Want Out of Pilgrim Evacuation Plan ML20237A0551986-06-27027 June 1986 Newsarticle Entitled, Dept of Public Utils Blasts Edison, Cites 'Paralysis' at Top ML20237A0461986-06-24024 June 1986 News Article Entitled, Edison Says Pilgrim Missed Another Deadline for Safety Tests ML20237A1661986-06-21021 June 1986 Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer Notes ML20237A0211986-06-0909 June 1986 Portions of Vol 8,Number 12 to Inside NRC Re Denton Urging Industry to Settle Doubts About Mark I Containments ML20237A0441986-05-26026 May 1986 News Article Re Chernobyl Accident & Difference Between Us & Soviet Plants ML20237A1961986-05-23023 May 1986 Newsarticle Entitled, Pilgrim on List of Worst-Run Nuclear Units ML20237A0511986-05-21021 May 1986 News Article Discussing NRC Announcement That Facility Will Remain Closed Until Util Corrects Safety Problems ML20236N0881986-05-19019 May 1986 Viewgraphs from 860519 Meeting Re Util Response to Confirmatory Action Ltr CAL-86-10,860612 Program for Excellence Task Force Rept & Facility Operation ML20235S1511986-04-25025 April 1986 Preliminary Critical Path Projection for RF07 ML20207G2661986-04-19019 April 1986 Package of Documents,Including Aii Exit Notes,Rhr Containment Isolation Leakage Notes,Comments on Util Response to Confirmatory Action Ltr 86-10 & Partially Deleted Inspector Notes for Rept 50-293/86-17 ML20236K2221986-04-12012 April 1986 Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198 ML20237A1981985-06-18018 June 1985 Newsarticle Entitled, NRC Says Pilgrim Skipped Routine Tests 1999-01-08 Category:OPERATIONS SUPPORT-CALCULATIONS MONTHYEARML20202B5081999-01-0808 January 1999
[Table view]Rev 2 to Calculation M-734, RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20217H3291998-02-23023 February 1998 Rev 0 to Calculation M-778, Evaluation of RPV Flange to Adjacent Shell 145 Deg F Differential Temp Limit ML20202B4981997-12-22022 December 1997 Rev E3 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20203A1231997-12-18018 December 1997 Rev 3 to M500, Range of Salt Svc Water Sys Header Pressures & Pump Flows ML20203A1111997-11-21021 November 1997 Rev 0 to M-771, RBCCW Heatup Immediately Following DBA- Loca ML20148T5101997-04-11011 April 1997 Rev E2 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20137W2901997-04-11011 April 1997 Rev 0 to RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20133N6071996-03-20020 March 1996 Rev E1 to RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20141D2521996-01-19019 January 1996 Rev 4 to PS-79, EDG Loading ML20249B4451996-01-0404 January 1996 Rev 0 to Calculation C15.0.3270, Fuel Pool Cooling He E206A & E206B GIP Evaluation ML20249B4461996-01-0404 January 1996 Rev 0 to Calculation C15.0.3273, RHR Heat Exchanger E207A & E207B GIP Evaluation ML20092G9381995-06-29029 June 1995 Scram Times for Tech Spec 3.3.C.1 ML20117K8601994-01-31031 January 1994 Rev 0, Fragility Analysis of SBO Dg,Pilgrim Nuclear Power Station ML20249B4731994-01-0808 January 1994 Rev 0 to Calculation C15.0.3216, LAR 016 Location:Reactor Bldg Ei 23'-0 ML20249B4661993-11-0808 November 1993 Rev 0 to Calculation C15.0.3216, LAR 017 Location:Reactor Bldg El 37'-0 ML20249B4811993-11-0606 November 1993 Rev 0 to Calculation C15.0.3216 for LAR 024 Location:Aux Bay Bldg Ei 3'-0 ML20249B4541993-10-25025 October 1993 Rev 0 to Calculation C15.0.3216, LAR 005 Location:Turbine Bldg Ei 37'-0 ML20117K8511993-06-30030 June 1993 Ipeee,Building Structures Fragility Analysis. Rev 1 ML20065L7941993-06-0404 June 1993 Reactor Building Seismic Model ML20064K8411993-01-26026 January 1993 Soil Properties for SSI Analysis for Pilgrim Site ML20086T2241991-12-19019 December 1991 Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment ML20011F4721990-01-19019 January 1990 Operability Evaluation of Salt Svc Water Pump Columns. ML20011F4471990-01-19019 January 1990 Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop. ML20106A6371989-03-0303 March 1989 Spec C-114-ER-Q-EO, Pilgrim Unit 1 Spec for Seismic Response Spectra ML20236K8561987-07-22022 July 1987 Calculation M-300 Re Cable Fire Heating of Torus Compartment Ceiling Beams 1999-01-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20065L794&oldid=2724766"