Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20202B508 | 8 January 1999 | Rev 2 to Calculation M-734, RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation | Ultimate heat sink Coatings |
ML20217H329 | 23 February 1998 | Rev 0 to Calculation M-778, Evaluation of RPV Flange to Adjacent Shell 145 Deg F Differential Temp Limit | |
ML20202B498 | 22 December 1997 | Rev E3 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop | |
ML20203A123 | 18 December 1997 | Rev 3 to M500, Range of Salt Svc Water Sys Header Pressures & Pump Flows | |
ML20203A111 | 21 November 1997 | Rev 0 to M-771, RBCCW Heatup Immediately Following DBA- Loca | Ultimate heat sink Fire Protection Program |
ML20148T510 | 11 April 1997 | Rev E2 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop | Ultimate heat sink |
ML20137W290 | 11 April 1997 | Rev 0 to RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation | |
ML20133N607 | 20 March 1996 | Rev E1 to RHR & Core Spray Pump NPSH & Suction Pressure Drop | |
ML20141D252 | 19 January 1996 | Rev 4 to PS-79, EDG Loading | |
ML20249B445 | 4 January 1996 | Rev 0 to Calculation C15.0.3270, Fuel Pool Cooling He E206A & E206B GIP Evaluation | |
ML20249B446 | 4 January 1996 | Rev 0 to Calculation C15.0.3273, RHR Heat Exchanger E207A & E207B GIP Evaluation | |
ML20092G938 | 29 June 1995 | Scram Times for Tech Spec 3.3.C.1 | Safe Shutdown Fire Protection Program |
ML20117K860 | 31 January 1994 | Rev 0, Fragility Analysis of SBO Dg,Pilgrim Nuclear Power Station | Earthquake |
ML20249B473 | 8 January 1994 | Rev 0 to Calculation C15.0.3216, LAR 016 Location:Reactor Bldg Ei 23'-0 | |
ML20249B466 | 8 November 1993 | Rev 0 to Calculation C15.0.3216, LAR 017 Location:Reactor Bldg El 37'-0 | |
ML20249B481 | 6 November 1993 | Rev 0 to Calculation C15.0.3216 for LAR 024 Location:Aux Bay Bldg Ei 3'-0 | |
ML20249B454 | 25 October 1993 | Rev 0 to Calculation C15.0.3216, LAR 005 Location:Turbine Bldg Ei 37'-0 | |
ML20058P221 | 29 July 1993 | Package Consisting of Attachment to Employee Concerns Programs | |
ML20117K851 | 30 June 1993 | Ipeee,Building Structures Fragility Analysis. Rev 1 | |
ML20065L794 | 4 June 1993 | Reactor Building Seismic Model | |
ML20064K841 | 26 January 1993 | Soil Properties for SSI Analysis for Pilgrim Site | |
ML20099B552 | 5 May 1992 | Audit 92050S, Scientific Ecology Group Supplier Implementation & Qualification, Conducted on 920324-27 | Commercial Grade Dedication |
ML20118A356 | 24 March 1992 | Scientific Ecology Group,Supplier Implementation & Qualification Audit 92050S | |
ML20086T224 | 19 December 1991 | Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment | |
ML20079M956 | 11 November 1991 | Response to NUMARC Auquatic Resource Questions,Socioeconomic Questions for All Utils & Waste Mgt Questions | License Renewal Biofouling |
ML20011F447 | 19 January 1990 | Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop. | |
ML20011F472 | 19 January 1990 | Operability Evaluation of Salt Svc Water Pump Columns. | |
ML20079M981 | 31 December 1989 | Response to NUMARC Survey Re Approximate Number & Cause for Most Notable Fish Mortalities at Pilgrim Nuclear Station for Period of 1973-1989 | |
ML20106A637 | 3 March 1989 | Spec C-114-ER-Q-EO, Pilgrim Unit 1 Spec for Seismic Response Spectra | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML20151W181 | 16 August 1988 | Attachment I to Ltr,Consisting of Response to Allegation a Re Deliberate Reduction of Radiation Survey Results to Avoid Further Surveys | |
ML20238E692 | 30 December 1987 | Packages Consisting of marked-up Rev 0 to Safety Evaluation 2144 & Slides of Facility Safety Enhancement Mods | Reactor Vessel Water Level Earthquake Fuel cladding |
ML20236R080 | 18 November 1987 | Package Consisting of Viewgraphs Re Util Simulator Status, Requalification Plans for Reactor Operators/Senior Reactor Operators Prior to Startup,Training Schedule & Control of Reactor Operator/Senior Reactor Operator Overtime | |
ML20236N847 | 12 November 1987 | Package of Documents Re Util Actions Concerning ATWS, Including Purchase Orders,Correspondence W/Ge,Work Instructions,Field Rev Notices & Maint Requests | |
ML20236Y615 | 5 November 1987 | News Article Re Shutdown of Facility for Six More Wks to Deal W/Mgt Troubles | |
ML20237A115 | 5 November 1987 | FSAR Section 5, Containment | |
ML20236K856 | 22 July 1987 | Calculation M-300 Re Cable Fire Heating of Torus Compartment Ceiling Beams | Fire Barrier Exemption Request Earthquake |
ML20236Y617 | 9 July 1987 | Newsarticle Entitled, Judges Asked to Limit Pilgrim Picketing | |
ML20237A017 | 28 June 1986 | Newsarticle Entitled, Two Towns Want Out of Pilgrim Evacuation Plan | |
ML20237A055 | 27 June 1986 | Newsarticle Entitled, Dept of Public Utils Blasts Edison, Cites 'Paralysis' at Top | |
ML20237A046 | 24 June 1986 | News Article Entitled, Edison Says Pilgrim Missed Another Deadline for Safety Tests | |
ML20237A166 | 21 June 1986 | Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer Notes | Chernobyl |
ML20237A021 | 9 June 1986 | Portions of Vol 8,Number 12 to Inside NRC Re Denton Urging Industry to Settle Doubts About Mark I Containments | Probabilistic Risk Assessment Chernobyl Backfit |
ML20237A044 | 26 May 1986 | News Article Re Chernobyl Accident & Difference Between Us & Soviet Plants | Chernobyl |
ML20237A196 | 23 May 1986 | Newsarticle Entitled, Pilgrim on List of Worst-Run Nuclear Units | Chernobyl |
ML20237A051 | 21 May 1986 | News Article Discussing NRC Announcement That Facility Will Remain Closed Until Util Corrects Safety Problems | |
ML20236N088 | 19 May 1986 | Viewgraphs from 860519 Meeting Re Util Response to Confirmatory Action Ltr CAL-86-10,860612 Program for Excellence Task Force Rept & Facility Operation | Fire Watch |
ML20235S151 | 25 April 1986 | Preliminary Critical Path Projection for RF07 | Hydrostatic |
ML20207G266 | 19 April 1986 | Package of Documents,Including Aii Exit Notes,Rhr Containment Isolation Leakage Notes,Comments on Util Response to Confirmatory Action Ltr 86-10 & Partially Deleted Inspector Notes for Rept 50-293/86-17 | |
ML20236K222 | 12 April 1986 | Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198 | |
ML20237A198 | 18 June 1985 | Newsarticle Entitled, NRC Says Pilgrim Skipped Routine Tests |