Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20202B5088 January 1999Rev 2 to Calculation M-734, RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH EvaluationUltimate heat sink
Coatings
ML20217H32923 February 1998Rev 0 to Calculation M-778, Evaluation of RPV Flange to Adjacent Shell 145 Deg F Differential Temp Limit
ML20202B49822 December 1997Rev E3 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop
ML20203A12318 December 1997Rev 3 to M500, Range of Salt Svc Water Sys Header Pressures & Pump Flows
ML20203A11121 November 1997Rev 0 to M-771, RBCCW Heatup Immediately Following DBA- LocaUltimate heat sink
Fire Protection Program
ML20148T51011 April 1997Rev E2 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure DropUltimate heat sink
ML20137W29011 April 1997Rev 0 to RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation
ML20133N60720 March 1996Rev E1 to RHR & Core Spray Pump NPSH & Suction Pressure Drop
ML20141D25219 January 1996Rev 4 to PS-79, EDG Loading
ML20249B4454 January 1996Rev 0 to Calculation C15.0.3270, Fuel Pool Cooling He E206A & E206B GIP Evaluation
ML20249B4464 January 1996Rev 0 to Calculation C15.0.3273, RHR Heat Exchanger E207A & E207B GIP Evaluation
ML20092G93829 June 1995Scram Times for Tech Spec 3.3.C.1Safe Shutdown
Fire Protection Program
ML20117K86031 January 1994Rev 0, Fragility Analysis of SBO Dg,Pilgrim Nuclear Power StationEarthquake
ML20249B4738 January 1994Rev 0 to Calculation C15.0.3216, LAR 016 Location:Reactor Bldg Ei 23'-0
ML20249B4668 November 1993Rev 0 to Calculation C15.0.3216, LAR 017 Location:Reactor Bldg El 37'-0
ML20249B4816 November 1993Rev 0 to Calculation C15.0.3216 for LAR 024 Location:Aux Bay Bldg Ei 3'-0
ML20249B45425 October 1993Rev 0 to Calculation C15.0.3216, LAR 005 Location:Turbine Bldg Ei 37'-0
ML20058P22129 July 1993Package Consisting of Attachment to Employee Concerns Programs
ML20117K85130 June 1993Ipeee,Building Structures Fragility Analysis. Rev 1
ML20065L7944 June 1993Reactor Building Seismic Model
ML20064K84126 January 1993Soil Properties for SSI Analysis for Pilgrim Site
ML20099B5525 May 1992Audit 92050S, Scientific Ecology Group Supplier Implementation & Qualification, Conducted on 920324-27Commercial Grade Dedication
ML20118A35624 March 1992Scientific Ecology Group,Supplier Implementation & Qualification Audit 92050S
ML20086T22419 December 1991Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment
ML20079M95611 November 1991Response to NUMARC Auquatic Resource Questions,Socioeconomic Questions for All Utils & Waste Mgt QuestionsLicense Renewal
Biofouling
ML20011F44719 January 1990Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop.
ML20011F47219 January 1990Operability Evaluation of Salt Svc Water Pump Columns.
ML20079M98131 December 1989Response to NUMARC Survey Re Approximate Number & Cause for Most Notable Fish Mortalities at Pilgrim Nuclear Station for Period of 1973-1989
ML20106A6373 March 1989Spec C-114-ER-Q-EO, Pilgrim Unit 1 Spec for Seismic Response SpectraSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML20151W18116 August 1988Attachment I to Ltr,Consisting of Response to Allegation a Re Deliberate Reduction of Radiation Survey Results to Avoid Further Surveys
ML20238E69230 December 1987Packages Consisting of marked-up Rev 0 to Safety Evaluation 2144 & Slides of Facility Safety Enhancement ModsReactor Vessel Water Level
Earthquake
Fuel cladding
ML20236R08018 November 1987Package Consisting of Viewgraphs Re Util Simulator Status, Requalification Plans for Reactor Operators/Senior Reactor Operators Prior to Startup,Training Schedule & Control of Reactor Operator/Senior Reactor Operator Overtime
ML20236N84712 November 1987Package of Documents Re Util Actions Concerning ATWS, Including Purchase Orders,Correspondence W/Ge,Work Instructions,Field Rev Notices & Maint Requests
ML20236Y6155 November 1987News Article Re Shutdown of Facility for Six More Wks to Deal W/Mgt Troubles
ML20237A1155 November 1987FSAR Section 5, Containment
ML20236K85622 July 1987Calculation M-300 Re Cable Fire Heating of Torus Compartment Ceiling BeamsFire Barrier
Exemption Request
Earthquake
ML20236Y6179 July 1987Newsarticle Entitled, Judges Asked to Limit Pilgrim Picketing
ML20237A01728 June 1986Newsarticle Entitled, Two Towns Want Out of Pilgrim Evacuation Plan
ML20237A05527 June 1986Newsarticle Entitled, Dept of Public Utils Blasts Edison, Cites 'Paralysis' at Top
ML20237A04624 June 1986News Article Entitled, Edison Says Pilgrim Missed Another Deadline for Safety Tests
ML20237A16621 June 1986Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer NotesChernobyl
ML20237A0219 June 1986Portions of Vol 8,Number 12 to Inside NRC Re Denton Urging Industry to Settle Doubts About Mark I ContainmentsProbabilistic Risk Assessment
Chernobyl
Backfit
ML20237A04426 May 1986News Article Re Chernobyl Accident & Difference Between Us & Soviet PlantsChernobyl
ML20237A19623 May 1986Newsarticle Entitled, Pilgrim on List of Worst-Run Nuclear UnitsChernobyl
ML20237A05121 May 1986News Article Discussing NRC Announcement That Facility Will Remain Closed Until Util Corrects Safety Problems
ML20236N08819 May 1986Viewgraphs from 860519 Meeting Re Util Response to Confirmatory Action Ltr CAL-86-10,860612 Program for Excellence Task Force Rept & Facility OperationFire Watch
ML20235S15125 April 1986Preliminary Critical Path Projection for RF07Hydrostatic
ML20207G26619 April 1986Package of Documents,Including Aii Exit Notes,Rhr Containment Isolation Leakage Notes,Comments on Util Response to Confirmatory Action Ltr 86-10 & Partially Deleted Inspector Notes for Rept 50-293/86-17
ML20236K22212 April 1986Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198
ML20237A19818 June 1985Newsarticle Entitled, NRC Says Pilgrim Skipped Routine Tests