Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198ML20236K222 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
04/12/1986 |
---|
From: |
NRC |
---|
To: |
|
---|
Shared Package |
---|
ML20236J993 |
List: |
---|
References |
---|
FOIA-87-645 NUDOCS 8711090149 |
Download: ML20236K222 (5) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20202B5081999-01-0808 January 1999 Rev 2 to Calculation M-734, RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20217H3291998-02-23023 February 1998 Rev 0 to Calculation M-778, Evaluation of RPV Flange to Adjacent Shell 145 Deg F Differential Temp Limit ML20202B4981997-12-22022 December 1997 Rev E3 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20203A1231997-12-18018 December 1997 Rev 3 to M500, Range of Salt Svc Water Sys Header Pressures & Pump Flows ML20203A1111997-11-21021 November 1997 Rev 0 to M-771, RBCCW Heatup Immediately Following DBA- Loca ML20148T5101997-04-11011 April 1997 Rev E2 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20137W2901997-04-11011 April 1997 Rev 0 to RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation ML20133N6071996-03-20020 March 1996 Rev E1 to RHR & Core Spray Pump NPSH & Suction Pressure Drop ML20141D2521996-01-19019 January 1996 Rev 4 to PS-79, EDG Loading ML20249B4451996-01-0404 January 1996 Rev 0 to Calculation C15.0.3270, Fuel Pool Cooling He E206A & E206B GIP Evaluation ML20249B4461996-01-0404 January 1996 Rev 0 to Calculation C15.0.3273, RHR Heat Exchanger E207A & E207B GIP Evaluation ML20092G9381995-06-29029 June 1995 Scram Times for Tech Spec 3.3.C.1 ML20117K8601994-01-31031 January 1994 Rev 0, Fragility Analysis of SBO Dg,Pilgrim Nuclear Power Station ML20249B4731994-01-0808 January 1994 Rev 0 to Calculation C15.0.3216, LAR 016 Location:Reactor Bldg Ei 23'-0 ML20249B4661993-11-0808 November 1993 Rev 0 to Calculation C15.0.3216, LAR 017 Location:Reactor Bldg El 37'-0 ML20249B4811993-11-0606 November 1993 Rev 0 to Calculation C15.0.3216 for LAR 024 Location:Aux Bay Bldg Ei 3'-0 ML20249B4541993-10-25025 October 1993 Rev 0 to Calculation C15.0.3216, LAR 005 Location:Turbine Bldg Ei 37'-0 ML20058P2211993-07-29029 July 1993 Package Consisting of Attachment to Employee Concerns Programs ML20117K8511993-06-30030 June 1993 Ipeee,Building Structures Fragility Analysis. Rev 1 ML20065L7941993-06-0404 June 1993 Reactor Building Seismic Model ML20064K8411993-01-26026 January 1993 Soil Properties for SSI Analysis for Pilgrim Site ML20099B5521992-05-0505 May 1992 Audit 92050S, Scientific Ecology Group Supplier Implementation & Qualification, Conducted on 920324-27 ML20118A3561992-03-24024 March 1992 Scientific Ecology Group,Supplier Implementation & Qualification Audit 92050S ML20086T2241991-12-19019 December 1991 Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment ML20079M9561991-11-11011 November 1991 Response to NUMARC Auquatic Resource Questions,Socioeconomic Questions for All Utils & Waste Mgt Questions ML20011F4471990-01-19019 January 1990 Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop. ML20011F4721990-01-19019 January 1990 Operability Evaluation of Salt Svc Water Pump Columns. ML20079M9811989-12-31031 December 1989 Response to NUMARC Survey Re Approximate Number & Cause for Most Notable Fish Mortalities at Pilgrim Nuclear Station for Period of 1973-1989 ML20106A6371989-03-0303 March 1989 Spec C-114-ER-Q-EO, Pilgrim Unit 1 Spec for Seismic Response Spectra ML20151W1811988-08-16016 August 1988 Attachment I to Ltr,Consisting of Response to Allegation a Re Deliberate Reduction of Radiation Survey Results to Avoid Further Surveys ML20238E6921987-12-30030 December 1987 Packages Consisting of marked-up Rev 0 to Safety Evaluation 2144 & Slides of Facility Safety Enhancement Mods ML20236R0801987-11-18018 November 1987 Package Consisting of Viewgraphs Re Util Simulator Status, Requalification Plans for Reactor Operators/Senior Reactor Operators Prior to Startup,Training Schedule & Control of Reactor Operator/Senior Reactor Operator Overtime ML20236N8471987-11-12012 November 1987 Package of Documents Re Util Actions Concerning ATWS, Including Purchase Orders,Correspondence W/Ge,Work Instructions,Field Rev Notices & Maint Requests ML20236Y6151987-11-0505 November 1987 News Article Re Shutdown of Facility for Six More Wks to Deal W/Mgt Troubles ML20237A1151987-11-0505 November 1987 FSAR Section 5, Containment ML20236K8561987-07-22022 July 1987 Calculation M-300 Re Cable Fire Heating of Torus Compartment Ceiling Beams ML20236Y6171987-07-0909 July 1987 Newsarticle Entitled, Judges Asked to Limit Pilgrim Picketing ML20237A0171986-06-28028 June 1986 Newsarticle Entitled, Two Towns Want Out of Pilgrim Evacuation Plan ML20237A0551986-06-27027 June 1986 Newsarticle Entitled, Dept of Public Utils Blasts Edison, Cites 'Paralysis' at Top ML20237A0461986-06-24024 June 1986 News Article Entitled, Edison Says Pilgrim Missed Another Deadline for Safety Tests ML20237A1661986-06-21021 June 1986 Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer Notes ML20237A0211986-06-0909 June 1986 Portions of Vol 8,Number 12 to Inside NRC Re Denton Urging Industry to Settle Doubts About Mark I Containments ML20237A0441986-05-26026 May 1986 News Article Re Chernobyl Accident & Difference Between Us & Soviet Plants ML20237A1961986-05-23023 May 1986 Newsarticle Entitled, Pilgrim on List of Worst-Run Nuclear Units ML20237A0511986-05-21021 May 1986 News Article Discussing NRC Announcement That Facility Will Remain Closed Until Util Corrects Safety Problems ML20236N0881986-05-19019 May 1986 Viewgraphs from 860519 Meeting Re Util Response to Confirmatory Action Ltr CAL-86-10,860612 Program for Excellence Task Force Rept & Facility Operation ML20235S1511986-04-25025 April 1986 Preliminary Critical Path Projection for RF07 ML20207G2661986-04-19019 April 1986 Package of Documents,Including Aii Exit Notes,Rhr Containment Isolation Leakage Notes,Comments on Util Response to Confirmatory Action Ltr 86-10 & Partially Deleted Inspector Notes for Rept 50-293/86-17 ML20236K2221986-04-12012 April 1986 Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198 ML20237A1981985-06-18018 June 1985 Newsarticle Entitled, NRC Says Pilgrim Skipped Routine Tests 1999-01-08
[Table view] Category:PACKAGE OF NONCODED MATERIAL
MONTHYEARML20058P2211993-07-29029 July 1993 Package Consisting of Attachment to Employee Concerns Programs ML20079M9561991-11-11011 November 1991 Response to NUMARC Auquatic Resource Questions,Socioeconomic Questions for All Utils & Waste Mgt Questions ML20079M9811989-12-31031 December 1989 Response to NUMARC Survey Re Approximate Number & Cause for Most Notable Fish Mortalities at Pilgrim Nuclear Station for Period of 1973-1989 ML20151W1811988-08-16016 August 1988 Attachment I to Ltr,Consisting of Response to Allegation a Re Deliberate Reduction of Radiation Survey Results to Avoid Further Surveys ML20238E6921987-12-30030 December 1987 Packages Consisting of marked-up Rev 0 to Safety Evaluation 2144 & Slides of Facility Safety Enhancement Mods ML20236R0801987-11-18018 November 1987 Package Consisting of Viewgraphs Re Util Simulator Status, Requalification Plans for Reactor Operators/Senior Reactor Operators Prior to Startup,Training Schedule & Control of Reactor Operator/Senior Reactor Operator Overtime ML20236N8471987-11-12012 November 1987 Package of Documents Re Util Actions Concerning ATWS, Including Purchase Orders,Correspondence W/Ge,Work Instructions,Field Rev Notices & Maint Requests ML20237A1151987-11-0505 November 1987 FSAR Section 5, Containment ML20237A1661986-06-21021 June 1986 Jm Hendrie Ltr to Editor of Ny Times Re D Ford & R Pollard 870519 Advertisement Trying to Draw Similarities Between GE Reactors & Chernobyl Nuclear Reactor & Warning of Safety Problems,Based on Hendrie & Hanauer Notes ML20235S1511986-04-25025 April 1986 Preliminary Critical Path Projection for RF07 ML20207G2661986-04-19019 April 1986 Package of Documents,Including Aii Exit Notes,Rhr Containment Isolation Leakage Notes,Comments on Util Response to Confirmatory Action Ltr 86-10 & Partially Deleted Inspector Notes for Rept 50-293/86-17 ML20236K2221986-04-12012 April 1986 Package of Handwritten Excerpts from NRC Headquarters Operations Officer Log Re Leakage Past Two Isolation Valves Reportable Event Numbers 04196 & 04198 ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams ML20245C8261985-03-29029 March 1985 Package Consisting of Rev 0 to Safety Evaluation SE-1806 Re Analog Trip Sys for Reactor Protection Sys & ECCS at Plant, App C,Rev 0 to PDC-84-70, Analog Trip Sys for Reactor Protection Sys & ECCS at Pilgrim Station & 870917 Ofc Memo 1993-07-29
[Table view] |
Text
_ - _ _ _ _ _ _
. Excerpts from NRC Headquarters Operations Officer Log - 4/11-4/12/86 Page 1 of 3
]\f \ \ c< r c m v
0Ien' Yvond 16S3 al_ ome..J, ,
~ Doctua note clue 4c, leday ges -
u>o . .s e e , s e,
{
on 'P! Lpic lnleci,6 Ico gt n00( Kelm,c, YEolC,1,cned is (&aLah FemL 1 diWE Cc1m. CJ T9'10 W c rc,en
'. . RDO ( Reimid, E O(G/,,ngd iE (dorcic. \, El [ Cene ) RIl%Mo a -
l Shi,on rn n.w F Sh.0 S o .
2015 P,)ccern OUDATe Con 4ence cul -I RI C sLesW.4 hcI 4c, increese s/n b lO*h ce.- hove c. aci '2 C I A r s I v ,- '
Oc,ne.Ihee o<ess c;lc r en co rnes n'n ik d 'T3*4 . 9 84*
- R1 :Shosnicler odd beensee lo inbm HOOoOIbo
.. (c,ilow,no cckJives_>
[ . Dki hi pess cdce m
. Dicnl necebs ccIcl S/p Picn\ sesk0 s _
- L wensee w.llin9eim boa Res losMr Or '
. Lesta. ws& ,
. hcoskie uc6 re oc,'c db.-bdedesesvi )
. Resk. 4. _.
- NRC enanacemen cencer ncd wM heensee us\c,4:=s d'h.- ledic.4e cesdIs inched e )eck e w . L n T. S. 1. m .' s .#
- combel dock shesn.h ) cn A. Ag,ds(2s-es d !
- IE me.nc~en? mowds n'ool c beet:e Ab et.J b s\ckos [Ptess Sower c.n, =Ic wD -3, hou rs .
2.2 13 - b c;re, m [ Lges bc.h Is[OPOAYE bcNoed Hk_pess edc.,m . Bleci ch line . L cd_nla m 6 '/t his cy. Rt c3 2 l*A _ .s/n rcle I Ac ec) y re c[ ._._.. i inut1;oc.. i ROOllleimis\ EC/Gricnesh R]I $4rosniled
- Moh9s Ace le M4tosnidec [2IS - 688 -55T3,Yeh nee >
c hr b c e.n, (iiwo . Ce, i1 Kc'mi, r G ,mI3 ) si,,[.h,l l
- eenhs eni, Foz n-87-6W gg Sod 1foij9e722o4 SORGIB7-645 CF-
y OW~? 0ff/+ h I b R g.u J + <r/f / i ,1; g 4r &Z45D,o & ,v,g I' ,~
-~
bS/O // K [ f y rsc) ] 6Aii ,N ?
2fTJ+ masnd o s ,a 2sr/ e,.
W&A ? h &-l Wt J f l f p ,ps , ,A
' ^
E6(B Com): 1s(p og),{ft (y " -=
h h l,V ? ?~#! l / S M AA1 tw t- Ld d/*~Crd 1 AW gQno' L j d'd f ). , ,
Ef%zum):'R//fgegg,o,,Q),,;_g,ff?>
' z l rrGuonn,! -
-c, u m-a y2 ~i Es w u w co G u (2. M
.- 1 Gm pu j_ l
- # 3'A ' W j . AC, 'M & /kAJg-) ~
1i s' /, To D&, y Pii,/rg,; ;- - - -
i vm Y i
~ VO3.34- d'o 3431'asm GADsrcr s //15/ds &P M
.f P M Ar u t M tJr s a n v< r A .>
b S/DG # L Anw <> c J3 j O$5/ Wo } fsh TAesaae.. AtM &dW A.
&g ,f .A n% 'Arshr-Pasa6 O.VW
$ ff
_ esss_ .L L ex ca11. n dm f' csim. .
M r & D S #. a r m d f M L ) -- 1 l
I i i
I 1
4
~ _ _ _ _ _ _ _ - . _ _ _ _ . - - - . _
Sb$*/ g. Adds SN 11 awJYA Eubt L. A lpe ,23 .
/ /9?nW Nc.$%/e .ff' )
w !a s " ~
l l M i d '_ brop efi/a zf/as/s .M fi A' t w
~
\
i c A f' "
66s/ dsW Md1-D
.. m._ .- r /2L. 7,uM/' M. .
4 o 6/9'&/0(/r//ds)/ w' A ?%4e i t'f>lK \
t%A sa Ljde L f & Ar:s- 70 l nt Ke:Lis ei %n
~
s,mo ,o l K+ 1; M / 4 % fold n ~z) s/ l hsw MUumi
, , y DNI,r - f C f/S f/t4/m froA/A40 ) 9tMT Asku/o a '
f) s i' c /o f Yn aseso 6t' f l 5 A 9oi. ? X&?rks ~/* fin -)' ] rsis )
(l/ane ) ] 6,&bA/x4+E) i h/f hW$/WGD h AEst 15Em Ju&saw)? ifd p2S l ef&a~m 4/dff;e WM 2'f ? 37 f/22'
%n. ,
sw&2r -as
. . . - . @xW j -
p ,TD ,7A72 / ,RM f/? O l 4/J.J. A L h e f I % A N .C '
8A & & --
AQ4dsn ,bc Cr' E Ausen. ) 1
- nna Ausr/ . /h u n w m rsJ. ,ad
. $ f,M/' //4 & N l
I
3:
Y; ' -2n. .f , x ,
,8 ; y 4 f $y is.,. , ,-
'!U ;y,
. , . .,.3 . . . . . . . . '. .j.
39 ". *;.+ s Reportable EventiNumber104196' N ;;f : ,
- J ' ;Y ,
a X. , . .-[* > .
w Faci l i ty' ~s : : PILGRIM. , 4 Date: Notified : 04/11'/86
) lUn i t.E: '1'l , eT1me. Notified :D17:11- .
,- m. ,
M Reglong: D l'
' Date.of Event : 04/11/86-
. [jVendorf t 1GE.. 5 ,
7l 1ime.of"EventL: 16:53 r
i
. Cl assi f i ca t i on ' : . Unusua l. Even t-N f0peration5LOfficern: . = Don'Marksberry.
' fNRC,NotifledlBy'l1 BRENT,LYONS C a t e g o r y '..1 : LCO Action Statement Rad'Releaseli bNo; . .
Cate97ry 2 :. , a Cautse 1: ' ' Mechan ica l : Fa i l ure Catego.'y 3 : .
a".;; Componen t .':l : ISOLATION ' VALVES -
Category'4 : 3
'y ENTEREO?INTO A'LCOLS/D:A/SJOUE TO TWO-INLI'NE'CONTAItJMENT. ISOLATION'VALVESJTh, c
?THE?B" LPIC1. INJECTION 1.INE. MOVc1001-289,298. LEAKAGEiRESULTED IN A'400# Hi- )f ;
hPRESS/ ALARM'IN':THE LPIC LINE. CURRENTLY BLEEDING 'OFF THE LINE: TO 'THE' NORMAL ~
~ 1251 PRESS. : PRESS > INCREASING TO THE : 400# ALARM IN- 2 : HOURS. REACTOR AT/94%,- >
EXPECT TO BE-.IN COLD S/O WITHIN~iTHE 24HR REQUIREMENT.-NO' ESTIMATE-ON THE ' ';
! AMOUNT'OF THE LEAKAGE. RESIDENT? INFORMED. NOTIFIED. RDO (KEIMTG) . EO (GR~IMES ) :.
V'..I E ( J OR DAN ) FEMA.
a f### UPDATE < 1840 ) *** { CONFERENCE . CALL ) ' RECEIVED FIRST HI PRESS LALARM l AT ;'141~5l PAST ;
i THE MOV: 1001-290 cISOLATION NALVE. CLOSED THE MOV- 1001-28B AND BLEED-OFF THE
LLINE(RESULTINGTIN THE:INOP: CONDITION OF THE LPIC "B". RECEIVED ANOTHER-ALARM
' AT'1653' INDICATING LEAKAGE'THRU BOTH ISOLATION VALVES,THUS, REQUIRING ~LCO S/O J.A/S,TO COLD S/O"WITHIN 24 HRS.:'LINE BLED 0FF.JNO OTHER ALARMS.SINCE THIS TIME, ,
- " INDICATING SMALL
- LEAKAGE, i RDO(KEIMIG F EO (GRIMES) IE (JORDAN ) ,RI (CANE V R1 (STROSNIDER ) S(ATION MANAGER.- 3 600 UPDATE (2015)***(CONFERENCE CALL) ' LICENSEE' INCREASED'S/D RATE FRON 5 TO:10% ;!
'PER ; HOUR t ANO . TO 20%' WHEN THE. NEXT ALARM COMES FIN. POWER A.T 73%, 986#.
l l
.I t . !
l
_j i
I l
1 1
.)
ft,x ij - 2 7 -6 W Sh l i
)
I
y - -- - -- -
Reportable Event Number 04190,
- Focilit 7
- PILGRIM Cate Notified : 04/12/81
< Un i t ' t 1..' *ime Notified : 03:10
' Region : 1 Oate of Event : 04/13/86
, . Vendor : GE Time of Event : 01:56 Operations Officer 1 G111.JoDes' Classification i 10 CFR 50.72 NRC Notified By : N. SIMPSON Category 1 : SCRAM Red Release : No .
Category 2 :
Cause : .Methanical Failure Catwgory 3 : ESF Actuation Component : MODE CWITCH Cetegory 4.:
IN RANGE 4 OR 5 DN IRMs (LESS l THAN 1% PWR ), WENT LESS THAN 880 PSI AND ONE OR MORE CONTACTS ON THE MODE SWITCH WAS STILL IN RUN MODE. MODE SWITCH
'HAD BEEN PLACED IN STARTUP. (SECOND OCCUSRANCE RECENTLY.) THUS, PART OF RPS WAS STILL IN RUN. THIS CAUSEO MSIVs TO CLOSE WHICH IN TURN CAUSED SC9 AM.
DUTBOAPD MS1Vs ARE NOT ABLE TO BE OPENED FOR UNK REASOli AT THIS TIME.
PROGLEM MAY BE AIR SYSTEM. HPCI WAS STARTED TO CONTROL PRESSURE. THE HPCI
-TURBINE IS ffHE HEA T SINK. HPCI IS NOT INJECTING BUT 15 IN FULL FLOW TEST 60D5. BAFETY/dELIEF VLVS DID NOT OPEN ON THE SCRAM. N'JRMAL COOLOOWN RATE IS BEING MAINTAINED. . PLAN IS TO SWITCH TD RCIC TO CNTL COOLDOWN. RX
. PRESSURE IS 30SPSI. NORMAL FEEDWATER SYSTEM IS IN SERVICE FOR FEED. TROUBLE
' SHOOTING IN -PROGRESS ON MSIV PROBLEMS. THERE HAVE BEEN NO ALARMS ON LPCI SINCE 2215EST, 4/11. ** UPDATES AT 0334 & 0343:
, MSIVs OPEN AT 0332. PRO 3LEM APPARENTLY WAS .THAT TifE 1N-BOARDS WERE LEAKING TO THE EXTENT THAT PRESSURE ' '
-ACROSS THE OUT-DOARDS COULD NOT BE EQUILIZED TO OPEN THEM. PLAN IS N3W TO RE ESTABLISH VACUUM AND CONTINUE COOLDOWN ON BYPASS VLVS. ** NOTIFIED RES 1
- (MEIMIG ) ; EO(GRIMES); (IE ( JORDAN ); REG 1(STROSNIDER).
OQUPDATE AT 0918(C. LEGNARD); PLANT EX1TED UE (SEE EVENT 04196 / AT 0938 UPON REACHING COLD S/D. NOTIFIED REG 1(KIEMIG); FEMA (CRUMP ) ; EO (GR I MES ) . REG 1 BRIEFED COMM A9STS; SECY, PAO, CAO, DEDROGR ON THIS AND EVENT 4196.
4 l
4 i
1 l
l
)
i i
)QoTO ~ 3 7- W u l 5/3 l
___ 1