Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20202B508 | 8 January 1999 | Rev 2 to Calculation M-734, RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation | Ultimate heat sink Coatings |
ML20217H329 | 23 February 1998 | Rev 0 to Calculation M-778, Evaluation of RPV Flange to Adjacent Shell 145 Deg F Differential Temp Limit | |
ML20202B498 | 22 December 1997 | Rev E3 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop | |
ML20203A123 | 18 December 1997 | Rev 3 to M500, Range of Salt Svc Water Sys Header Pressures & Pump Flows | |
ML20203A111 | 21 November 1997 | Rev 0 to M-771, RBCCW Heatup Immediately Following DBA- Loca | Ultimate heat sink Fire Protection Program |
ML20148T510 | 11 April 1997 | Rev E2 to Calculation M-662, RHR & Core Spray Pump NPSH & Suction Pressure Drop | Ultimate heat sink |
ML20137W290 | 11 April 1997 | Rev 0 to RHR & Core Spray Pump Suction Strainer Debris Head Loss NPSH Evaluation | |
ML20133N607 | 20 March 1996 | Rev E1 to RHR & Core Spray Pump NPSH & Suction Pressure Drop | |
ML20141D252 | 19 January 1996 | Rev 4 to PS-79, EDG Loading | |
ML20249B445 | 4 January 1996 | Rev 0 to Calculation C15.0.3270, Fuel Pool Cooling He E206A & E206B GIP Evaluation | |
ML20249B446 | 4 January 1996 | Rev 0 to Calculation C15.0.3273, RHR Heat Exchanger E207A & E207B GIP Evaluation | |
ML20092G938 | 29 June 1995 | Scram Times for Tech Spec 3.3.C.1 | Safe Shutdown Fire Protection Program |
ML20117K860 | 31 January 1994 | Rev 0, Fragility Analysis of SBO Dg,Pilgrim Nuclear Power Station | Earthquake |
ML20249B473 | 8 January 1994 | Rev 0 to Calculation C15.0.3216, LAR 016 Location:Reactor Bldg Ei 23'-0 | |
ML20249B466 | 8 November 1993 | Rev 0 to Calculation C15.0.3216, LAR 017 Location:Reactor Bldg El 37'-0 | |
ML20249B481 | 6 November 1993 | Rev 0 to Calculation C15.0.3216 for LAR 024 Location:Aux Bay Bldg Ei 3'-0 | |
ML20249B454 | 25 October 1993 | Rev 0 to Calculation C15.0.3216, LAR 005 Location:Turbine Bldg Ei 37'-0 | |
ML20117K851 | 30 June 1993 | Ipeee,Building Structures Fragility Analysis. Rev 1 | |
ML20065L794 | 4 June 1993 | Reactor Building Seismic Model | |
ML20064K841 | 26 January 1993 | Soil Properties for SSI Analysis for Pilgrim Site | |
ML20086T224 | 19 December 1991 | Boston Edison Pilgrim BWR Plan RWCU Sys Evaluation of Crack Growth & Stability for 4-Inch Pipe to Elbow Weldment | |
ML20011F472 | 19 January 1990 | Operability Evaluation of Salt Svc Water Pump Columns. | |
ML20011F447 | 19 January 1990 | Salt Svc Water Pump P208A,Casing Stresses Due to Accidental Drop. | |
ML20106A637 | 3 March 1989 | Spec C-114-ER-Q-EO, Pilgrim Unit 1 Spec for Seismic Response Spectra | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML20236K856 | 22 July 1987 | Calculation M-300 Re Cable Fire Heating of Torus Compartment Ceiling Beams | Fire Barrier Exemption Request Earthquake |