ML20069M145
Jump to navigation
Jump to search
| ML20069M145 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 04/30/1994 |
| From: | Kaplan R SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML20069M109 | List: |
| References | |
| NUDOCS 9406210183 | |
| Download: ML20069M145 (1) | |
Text
.
Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _50:161 UNIT NAMF.: _SDNGS - 2 DATE:
REVISION COMPLETED BY: R. L. Kaplan TELEPHONE: (714) 368-6834 QPJRATING STAIUS
- 1. Unit Name: _ San Onofre Nuclear Generating St_ation. Unit 2
- 2. Reporting Period: April 1994
- 3. Licensed Thermal Power (MWt): 3390
- 4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rat-ing (Net MWe): 1Q70
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7. Maximum Dependable Capacity (Net MWe): 1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: NA
- 9. Power Level To Which Restricted, If Any (Net MWe): NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 71R10Q 2,8791QQ 93.816 10Q_
- 12. Number Of Hours Reactor Was Critical 719100 2.879.00 70.333139_
- 13. Reactor Reserve Shutdown Hours 0_100 Q10D 0.00 14 Hours Generator On-Line 719.00 2.879100 69.7501 34_
- 15. Unit Reserve Shutdown Hours Q100 0100 0.00
- 16. Gross Thermal Energy Generated (MWH) 2144DJ83100 9.5_19E320 22SJ14.090.14
- 17. Gross Electrical Energy Generated (MWH) S16J33JQ _3J3Z195HJQ _77J45.746.5Q_
- 18. Net Electrical Energy Generated (MWH) 777.113 Q0_ 3.1051051.00 _l32359.749188_
- 19. Unit Service Factor 1DQ100% 100 QD% 74.31%
- 20. Unit Availability Factor 10Q10Q% 1QQ100% 74.33%
- 21. Unit Capacity Factor (Using MDC Net) 101.01% 1Q0180% 73.Q3%
- 22. Unit Capacity Factor (Using DER Net) 1Q1tQ1% 10018Q% 7310R%
- 23. Unit Forced Outage Rate Q.00% 0.00% 5.94%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 1