Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _l0-361 UNIT NAME:
SONGS - 2 DATE:
REVISION COMPLETED BY:
fL L. Kaplan J
TELEPHONE: ~T714) 368-6834 ORBAIING_STAIUS 1.
Unit Name:
San Onof re Nuclear Generating _St_alion. Unit 2 2.
Reporting Period:
March 1914 3.
Licensed Thermal Power (MWt):
3320 4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rating (Net MWe):
1010 6.
Maximum Dependable Capacity (Gross MWe):._1127 7.
Maximum Dependable Capacity (Net MWe):
1070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Dat-Cumulative 11.
Hours In Reporting Period 744.00 2J10J0 93J17 00_
2 12.
Number Of Hours Reactor Was Critical 744 QQ 2.J60.00 70.174.59 2
13.
Reactor Reserve Shutdown Hours 0 Q0 0 QQ 0.00 2
2 14.
Hours Generator On-Line 744.00 2.160.0Q 69.031.34 15.
Unit Reserve Shutdown Hours 0.00 0.0D 0.00 16.
Gross Thermal Energy Generated (MWH) 2.404136B226 Z 01818.50.70 221'513JD7 4_.
17.
Gross Electrical Energy Generated (MWH) B3_4 h11J0 _2.441J2L10 _26J2L91 a
18.
Net Electrical Energy Generated (MWH)
. 795. 200100_ 2J23_,338J0 72.582.635 E _.
19.
Unit Service Factor 100.00%
1Q0.003 74.:.5%
20.
Unit Availability Factor 10Dt00%
10D 003 74.: 5%
21.
Unit Capacity Factor (Using MDC Net) 991891 1Q02 23 _.
72.063 22.
Unit Capacity Factor (Using DER Net) 99189%
100.723 7A 85%
23.
Unit Forced Outage Rate QJQ%
0,093 6.00%
24.
Shutdowns Scheduled Over Next 6 Morths (Type, Date, and Duration ot x a):
None 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA 26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA J
2 9406210176 940615 PDR ADOCK 05000361 R
Document Control Desk AVERAGE DAILY UNIT POWER LEVEL A
2 DATE:
(714T.,_ Kap]an REVISION COMPLETED BY:
R1 1
36 M Bl4 TELEPHONE:
MONTH:
Margh__1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1082 J3 16 10ZHJ3.
2 10BZ.,13 17 10ZB250 3
1981tB3 18 10ZBJZ_
4 10$0188 19 1Q77.17 5
19Z1dQ 20 1026J3 6
10ZB d4 21 1026A0 7
102Z12_5 22 1025.121 8
10lzJ3 23 1076 29 1
9 1Q21,.29_
24 1QZfL2 5 10
_10ZHJO 25 1031.00 11 1QBQJ3 26 BD.9183 12 10ZZ7 33 27 1031 33 2
13 10HL2L 28 1031 13 14 10MJS 29 1031J3 15 1082103 30 10BL96 31 1033J3 1
l 3