ML20069M133

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Repts for March 1994 for San Onofre Nuclear Generating Station,Unit 2
ML20069M133
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/31/1994
From: Kaplan R
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20069M109 List:
References
NUDOCS 9406210176
Download: ML20069M133 (2)


Text

..

.~

Document Control Desk NRC MONTHLY OPERATING REPORT DOCKET NO: _l0-361 UNIT NAME:

SONGS - 2 DATE:

REVISION COMPLETED BY:

fL L. Kaplan J

TELEPHONE: ~T714) 368-6834 ORBAIING_STAIUS 1.

Unit Name:

San Onof re Nuclear Generating _St_alion. Unit 2 2.

Reporting Period:

March 1914 3.

Licensed Thermal Power (MWt):

3320 4.

Nameplate Rating (Gross MWe):

1127 5.

Design Electrical Rating (Net MWe):

1010 6.

Maximum Dependable Capacity (Gross MWe):._1127 7.

Maximum Dependable Capacity (Net MWe):

1070 8.

If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA 9.

Power Level To Which Restricted, If Any (Net MWe):

NA 10.

Reasons For Restrictions, If Any:

NA This Month Yr.-to-Dat-Cumulative 11.

Hours In Reporting Period 744.00 2J10J0 93J17 00_

2 12.

Number Of Hours Reactor Was Critical 744 QQ 2.J60.00 70.174.59 2

13.

Reactor Reserve Shutdown Hours 0 Q0 0 QQ 0.00 2

2 14.

Hours Generator On-Line 744.00 2.160.0Q 69.031.34 15.

Unit Reserve Shutdown Hours 0.00 0.0D 0.00 16.

Gross Thermal Energy Generated (MWH) 2.404136B226 Z 01818.50.70 221'513JD7 4_.

17.

Gross Electrical Energy Generated (MWH) B3_4 h11J0 _2.441J2L10 _26J2L91 a

18.

Net Electrical Energy Generated (MWH)

. 795. 200100_ 2J23_,338J0 72.582.635 E _.

19.

Unit Service Factor 100.00%

1Q0.003 74.:.5%

20.

Unit Availability Factor 10Dt00%

10D 003 74.: 5%

21.

Unit Capacity Factor (Using MDC Net) 991891 1Q02 23 _.

72.063 22.

Unit Capacity Factor (Using DER Net) 99189%

100.723 7A 85%

23.

Unit Forced Outage Rate QJQ%

0,093 6.00%

24.

Shutdowns Scheduled Over Next 6 Morths (Type, Date, and Duration ot x a):

None 25.

If Shutdown At End Of Report Period, Estimated Date of Startup:

NA 26.

Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA J

2 9406210176 940615 PDR ADOCK 05000361 R

PDR

Document Control Desk AVERAGE DAILY UNIT POWER LEVEL A

2 DATE:

(714T.,_ Kap]an REVISION COMPLETED BY:

R1 1

36 M Bl4 TELEPHONE:

MONTH:

Margh__1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1082 J3 16 10ZHJ3.

2 10BZ.,13 17 10ZB250 3

1981tB3 18 10ZBJZ_

4 10$0188 19 1Q77.17 5

19Z1dQ 20 1026J3 6

10ZB d4 21 1026A0 7

102Z12_5 22 1025.121 8

10lzJ3 23 1076 29 1

9 1Q21,.29_

24 1QZfL2 5 10

_10ZHJO 25 1031.00 11 1QBQJ3 26 BD.9183 12 10ZZ7 33 27 1031 33 2

13 10HL2L 28 1031 13 14 10MJS 29 1031J3 15 1082103 30 10BL96 31 1033J3 1

l 3