Proposed Tech Specs Re post-accident Monitoring Instrumentation
ML20070S809
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/03/1983
From:
GEORGIA POWER CO.
To:
Shared Package
ML20070S802 List:
References
NUDOCS 8302080025
Download: ML20070S809 (2)


Text

. .

INSTRUMENTATION POST-ACCIDENT MONITORING INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.6.4 The post-accident monitoring instrumentation channels shown in Table 3.3.6.4-1 shall be OPERABLE.

APPLICABILITY _: CONDITIONS 1 and 2.

. ACTION:

a. With fewer than the Minimum Channels Operable (as required by Table 3.3.6.4-1), either restore the inoperable channel (s) to OPERABLE status such that the Minimum Channels Operable criteria in Table 3.3.6.4-1 is met within 30 days or be in at least HOT SHUTD0k'N within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b. The provisions of specification 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS _

4.3.6.4 Each of the above required post-accident monitoring instrumen-tation channels shall be demonstrated OPERABLE by perfomance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3.6.4-1.

HATCH - UNIT 2 3/4 3-53 8302080025 830203 PDR ADOCK 05000366 P PDR

i TABLE 3.3.6.4-1 POST-ACCIDENT MONITORING INSTRlRIENTATION ,

F MINIMUM d CIIANNELS .

INSTRlRIENT OPERABLE h

O' 2

1. Reactor Vessel Pressure (2C32-R605 A, B, C)

U 2. Reactor Vessel Water Level (2B21-R610, 2B21-R615) 2 l N

3. Suppression Chamber Water Level (2T48-R622 A, B, 2T48-R607A,B) ** 2
4. Suppression Chamber Water Temperature (2T47-R626, 2147-R627) 2
5. Suppression Chamber Pressure (2T48-R608,2T48-R609, 2T'e8-R632 A,B) ** 2
6. Drywell Pressure (2T48-R608, 2T48-R609, 2T48-R631 A,B) ** 2
7. Drywell Temperature (2T47-R626, 2T47-R627) 2 y 8. Post-LOCA Gamma Radiation (2D11-K622 A, B, C, D) 2 U
9. Drywell 11 2 -0 2 Analyzer (2P33-R601 A, B) 2
10. a) Safety / Relief Valve Position Primary Indicator (2B21-N301 A-H and K-M) b) Safety / Relief Valve Position Secondary Indicator (2B21-N004 A-H and K-M)
  • If either the primary or secondary indication is inoperable, the torus temperature will be monitored at least once per shift to observe any unexplained temperature increases which might be indicative of an open SRV. With both the primary and secondary monitoring channels of two or more SRVs inoperable either restore sufficient inoperable channels such that no more than one SRV has both primary and secondary channels inoperable within 7 days or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
    • Each instrument constitutes an independent operable channel.

_ _ _ _ _ _ _ - _______-