(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML19162A1752019-06-0606 June 2019 10 CFR 50.54(q)(5) Procedure Change Summary Analysis ML18065A2042018-03-0606 March 2018 Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. ML16190A3852016-07-0808 July 2016 EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure RA-15-112, Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390)2015-12-15015 December 2015 Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390) RS-15-327, Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form.2015-12-15015 December 2015 Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form. ML14311A6432013-07-18018 July 2013 Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions. (Version ML13200A124) ML14311A5752013-07-18018 July 2013 Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions RS-12-213, Submittal of 10 CFR 50 Appendix E Evacuation Time Estimate Analysis2012-12-12012 December 2012 Submittal of 10 CFR 50 Appendix E Evacuation Time Estimate Analysis RS-08-105, Revision I to Standardized Radiological Emergency Plan Implementing Procedure EP-AA-112-100-F-06, Midwest ERO Notification or Augmentation2008-08-19019 August 2008 Revision I to Standardized Radiological Emergency Plan Implementing Procedure EP-AA-112-100-F-06, Midwest ERO Notification or Augmentation RS-03-208, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure2003-11-0505 November 2003 Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure RS-03-207, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures2003-10-30030 October 2003 Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures RS-03-197, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures2003-10-14014 October 2003 Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedures ML0327601462003-09-19019 September 2003 Rev. 1 to Emergency Plan Implementing Procedure EP-AA-110-301, Core Damage Assessment (Bwr). RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery.2003-09-19019 September 2003 Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. RS-03-159, Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure2003-08-0707 August 2003 Revisions to the Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure RS-03-124, Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure2003-06-19019 June 2003 Revisions to Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure ML0309302202003-03-24024 March 2003 Revision to Exelon Nuclear Standardized Emergency Plan Procedures, Attachment D RS-02-078, Response to Request for Additional Information on Review of Proposed Emergency Action Level Classification Schemes, Clinton Power Station Unit 12002-04-0909 April 2002 Response to Request for Additional Information on Review of Proposed Emergency Action Level Classification Schemes, Clinton Power Station Unit 1 ML0209802972002-03-25025 March 2002 CPS Records Management Controlled Document Transmittal ML0204202502002-01-14014 January 2002 Emergency Plan Implementing Procedure ML0204403112002-01-0808 January 2002 Revision to Emergency Plan Implementing Procedures ML0200700712001-10-23023 October 2001 Emergency Plan Implementing Procedure for Clinton Power Station Nuclear Station Engineering Dept ML0036919842000-03-0606 March 2000 Revised Epips, Including Revision 3 to EC-01, Revision 5 to EC-01, Revision 7 to EC-12, Attachment 1 and 2 Revision 6 to RA-05, Attachments 1-5 and Status Report ML0036840452000-02-17017 February 2000 Emergency Plan Implementing Procedures (EPIPS) ML0036753892000-01-12012 January 2000 Revised Epips, Including Revised EPIP Status Report, Rev. 6 to AP-01, Rev. 5 to AP-06, Rev. 6 to EC-01, Rev. 6 to EC-02, Rev. 3 to EC-14, Rev. 4 to MS-03, Rev. 6 to PR-01, Rev. 8 to PR-03, Rev. 6 to PR-05, Rev. 6 to RA-01, and Rev. 6 to RA- 2019-06-06
[Table view] Category:Records Retention and Disposal Authorization
MONTHYEARML0209802972002-03-25025 March 2002 CPS Records Management Controlled Document Transmittal 2002-03-25
[Table view] |
Text
CLINTON POWER STATION CPS RECORDS MANAGEMENT CONTROLLED DOCUMENT TRANSMITTAL Transmittal No. 02PS092A Transmittal Date March 25, 2002 Page 1 of 2 Letter No. E-03-22-02-01&02 Document Type: PLANT STAFF PROCEDURES The attached documents are being transmitted for your use:
76 D.V. PICKETT OS 147 H. DAVIS (DR. JOHN WARNER HOSP OS 152 P. DANISON (AMBULANCE SERVICE) OS 222 C. SANGSTER 0S 222A(679)C. SANGSTER OS 223 U.S. NRC - DOC CONTROL DESK OS 225 IDNS (M. SINCLAIR) 0S 225A(680) IDNS (M. SINCLAIR) OS 226 DEWITT CO. SHERIFF DEPT OS 228 T. HARPER (IL DEPT CONSERVATION) OS 229 C.A. VANHORN (DEPT OF ENERGY) OS 231 J. MORRIS (CITY CLINTON COMM. OF PUBLIC HEALTH & SAFETY OS 233 KENNETH HALL - DEPT OF STATE POLICE OS 234 STATE EOC (M. STRAIN)
DEWITT CO. ESDA OS 235 M. STRAIN/D. SHULL OS 237C A. PEPPER OS 238 IDNS)M. STRAIN, D.POWELL, OS 353 TECH ADVISOR/DEWITT CO. EOC OS 354 TECH ADVISOR/STATE REAC OS 354A(725)TECH ADVISOR/STATE REAC OS 355 TECH ADVISOR/STATE EOC OS 567 J. FAIROW (RADIOLOGICAL EP MGR. OS Your signature below acknowledges receipt of documents and actions completed as per transmittal instructions.
You are required to complete above per TRM RM-CL-102-1007 and return signed transmittal to Records Management ATTN: K. UNDERWOOD by (4-8-2002).
Signature/Date R. Servev/WM (Transmittal Only), V-130C (re: CR-2-00-03-0121)
Note: Transmittal No. 02PS092A Column "A"-Remove/Destroy DATE3/25/2002 Column "B"-Insert PAGE 2 No. of copies will be noted D1IS T R I B U T ION PO INTS Documents Being Transmitted A B THE FOLLOWING HAVE BEEN SUPERCEEDED OR DOWNGRADED.
PLEASE REMOVE AND DESTROY:
CPS EMERGENCv PLAN IMPLEMENTING PROCEDURES (EPIPS) X CPS EMERGENCY PLAN X CPS NUCLEAR RESPONSE MANUAL (NERM)_X CPS FIELD TEAM HANBOOK X
- - --- -- -- -- . .. * - +. .. . .T * . . . . .. .. . .