MONTHYEARIR 05000272/20244032024-09-25025 September 2024 and Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 LR-N24-0038, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities 2024-09-25
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 11/14/02 EDO CONTROL: G20020577 DOC DT: 10/08/02 FINAL REPLY:
Norman Cohen UNPLUG Salem Campaign TO:
Chairman Meserve FOR SIGNATURE OF : ** GRN ** CRC NO: 02-0646 Collins, NRR DESC: ROUTING:
2.206 - Salem Travers Paperiello Kane Norry Craig Burns DATE: 10/10/02 Miller, RI Cyr, OGC ASSIGNED TO: CONTACT: Skay, NRR Goldberg, OGC NRR Collins SPECIAL INSTRUCTIONS OR REMARKS:
-rew-p e- eibN-s: s c-t+o
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Oct 08, 2002 15:5 7 PAPER NUMBER: LTR-02-0646 LOGGING DATE: - 10/08/2002 ACTION OFFICE: EDO AUTHOR: Norman Cohen AFFILIATION: NJ ADDRESSEE: Richard Meserve
SUBJECT:
Urges the closing of Salem unit 2 ACTION: Appropriate DISTRIBUTION:
LETTER DATE: 10/08/2002 ACKNOWLEDGED No SPECIAL HANDLING:
NOTES: 2.206 Petition FILE LOCATION: Adams DATE DUE: DATE SIGNED:
EDO -- G20020577
SAA
-02 CCT-0a-2002 06:56 AM CLOSE THE SALEM NUKES NOW The UNPLUG SALEM Campaign 321 Barr Ave., Linwood NJ 08221 609.601-85831601.8537; ncohenl2@comcast.net http:/lwww.unplugsalem.org Date: 1018102 To: Richard Meserve, Chair, Nuclear Regulatory Commission,
Dear Mr. Meserve,
Please consider this letter as a prospective 2.206 petition.
The Close the Salem Nukes Now - UNPLUG Salem Campaign has learned that PSEG plans to replace the defective steam generators in Salem Unit 2 during the year 2006 refueling outage. The New Jersey Bureau of Nuclear Engineering conveyed this Information to us.
We applaud PSEG's decision to finally replace Unit 2's defective steam generators.
This decision confirms that the UNPLUG Salem Campaign was correct during the last two years as we have urged NRC and PSEG to Indeed take this vital step to ensure the safety of the citizens of South Jersey, Delaware and Eastern Pennsylvania. This decision confirms that NRC and PSEG were wrong In saying that the steam generators at Unit 2 were safe. They were not, and are not, safe.
While we applaud the decision to finally replace Unit 2's defective steam generators, we have some major concerns about this decision. NRC Inaction led to the accidents at Indian Point (steam tube rupture) and Davis Besse (almost a LOCA). NRC allowed both nuclear plants to operate too long In an unsafe condition. We are concerned that allowing PSEG to put profits before safety by waiting until 2006 to replace Unit 2's steam generator is an unnecessary safety risk, especially coupled with the risk of a multiple steam tuba rupture which NRC's own ACRS committee agrees is possible.
generator In Therefore, our first request is that NRC require PSEG to replace the steam consider agreeing Unit 2 NOW, and not wait until 2006. Ifthat request is rejected, we would while PSEG to having PSEG replace the steam generator during the 2004 refueling outage
-- A--
OCT-09-2002 06 :57 AM P. 03 is replacing their turbines, if NRC can guarantee, in writing, that the steam generator tubes in Unit 2 will not rupture between now and 2004.
IfNRC provides the UNPLUG Salem Campaign with this written guarantee, we hope that itwill explain how that guarantee Is possible given that the NRC still has not completed Its Steam Generator Action Plan originally issued In November 2000 after the Indian Point accident. According to the latest quarterly update publicly available (March 29, 2002), many essential tasks have not been completed.
For example, Item 3.4(l) Is to "Develop data and analyses for predicting leak rates for degraded tubes in restricted areas under design basis and severe accident conditions," a task not scheduled to be completed until the end of 2003. Another example is Item 3.10(b)
"Using the extensive experience on stress corrosion cracking in operating SGs [steam generators], and results from laboratory testing under prototypic conditions, develop models for predicting the cracking behavior of SG tubing in the operating environment," a task not scheduled to be completed until December 31, 2006. The Steam Generator Action Plans lists a large number of things that the NRC does not know and will not know for years. We wonder how the NRC can possibly know today that It is safe to operate the Salem reactor with degraded tubes in its steam generators until 2006.
We find Ittroubling that PSEG scheduled the turbine replacement first, in 2004, Instead of the steam generator replacement. Of course, turbine replacement means additional power production and thus additional revenue to PSEG.
Our second concern Is with what type of alloy is used In the replacement steam generator. Experts, including a former PSEG steam generator specialist, recommend alloy 690, Instead of alloy 600, for any new steam generator. We request that NRC require the use of alloy 690.
After the debacles of Indian Point and Davis Bessie, NRC should be completely committed, in both words and practice, to totally support public safety over corporate profits. By agreeing to these two requests of the UNPLUG Salem Campaign, NRC would go a long way to reestablishing its claim that it supports safety first.