MONTHYEARAEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-30, Core Operating Limits Report2022-10-0606 October 2022 Core Operating Limits Report AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2022-08-18018 August 2022 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2022-29, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 AEP-NRC-2022-15, CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations2022-05-0404 May 2022 CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations AEP-NRC-2022-28, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report AEP-NRC-2022-27, Annual Report of Individual Monitoring2022-04-27027 April 2022 Annual Report of Individual Monitoring AEP-NRC-2022-05, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-04-0707 April 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements AEP-NRC-2022-18, Annual Report of Property Insurance2022-03-28028 March 2022 Annual Report of Property Insurance AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source AEP-NRC-2022-02, Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-02-0101 February 2022 Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2022-01, Quality Assurance Program Change Request for Internal Audit Frequency2022-02-0101 February 2022 Quality Assurance Program Change Request for Internal Audit Frequency AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2021-12-0909 December 2021 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation AEP-NRC-2021-66, 2020 Annual Radioactive Effluent Release Report Correction2021-11-17017 November 2021 2020 Annual Radioactive Effluent Release Report Correction AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2021-11-0808 November 2021 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2021-11-0808 November 2021 Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask2021-10-12012 October 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2021-09-20020 September 2021 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-48, Cycle 26 Core Operating Limits Report, Revision 02021-09-14014 September 2021 Cycle 26 Core Operating Limits Report, Revision 0 AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask2021-08-26026 August 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-50, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2021-08-25025 August 2021 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report 2024-01-08
[Table view] |
Text
INDIANA MICHIGAN Indiana Michigan Power One Cook Place PoWERi Bridgman, MI 49106 A unit of American Electric Power IndianaMichiganPower.com June 7,2011 AEP-NRC-2011-34 10 CFR 50.75(f)(1)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 Response to Request for Information Regarding the Decommissioning Funding Status Report (TAC Nos ME5473 and ME5474)
Dear Sir or Madam:
By letter dated March 30, 2011, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant'(CNP), submitted the Decommissioning Funding Status Report. By e-mail dated May 9, 2011, the Nuclear Regulatory Commission (NRC) communicated to CNP a request for.additional information (RAI). This RAI required a response to two issues which involve a clarification on the' basis 'used for the 2 percent real rate of return and the after tax value of the decommissioning funds collected.
The enclosure to this letter provides I&M's response to the NRC RAI.
This letter contains no new commitments. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.
Sincerely, Joel P. Gebbie Site Vice President DMB/jmr Enclosure c: J. T. King, MPSC S. M. Krawec, AEP Ft. Wayne, w/o enclosure MDEQ - WHMD/RPS NRC Resident Inspector M: A. Satorius, NRC Regionlll P. S. Tam, NRC Washington DC . (
I-)
Alk
Enclosure to AEP-NRC-2011-34 Response to NRC Request for Additional Information By letter dated March 30, 2011, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP), submitted the Decommissioning Funding Status (DFS)
Report. By e-mail dated May 9, 2011, the Nuclear Regulatory Commission (NRC) communicated to CNP a request for additional information (RAI). This RAI required a response to two issues which involve a clarification on the basis used for the 2 percent real rate of return and the after tax value of the decommissioning funds collected. Each RAI item is restated below followed by the corresponding I&M response.
NRC RAI Question 1:
Citation for realrate of returns:
Provide the citation (e.g., an Order by the rate-regulatoryauthority) by the regulatory entity that allows for the assumptions used regardingrates of escalation in decommissioning costs, rate of earning on decommissioning funds and rates of other factors assumed in your DFS report.
Your March 30, 2011, report used the following for Cook 1 and 2: a 2 percent real rate of return was applied to the annualbalance for future funding projections.
As stated in 10 CFR 50.75(0(1),
The information in [the DFS] report must include [..] the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections...
I&M Response As stated in 50.75 Reporting and Recordkeeping for Decommissioning Planning, Section (e)(ii),
a licensee that has collected funds based on the formulas in 50.75(c) of this section may take credit for collected earnings on the decommissioning funds using up to a 2 percent annual real rate of return up to the time of permanent termination of operations. This method of projecting future earnings was included in our March 30, 2011, report. Although the rate, regulatory authority for CNP may include rates of escalation, these are not used as the basis for our DFS Report. The citations for the Orders that address decommissioning funding are the State of Michigan Case Number U-10347 and the State of Indiana Cause Number 43306.
NRC RAI Question 2:
Provide the after-tax amount of funds accumulated through December 31, 2010. Your March 30, 2011, report did not provide the after-tax amount of funds accumulated through December 31, 2010. The provisions of 10 CFR 50.75(0(1) and (2) require the licensee to report the amount of funds accumulatedto the end of the calendaryearpreceding the report.
I&M Response The amount of $761,279,714 reported in CNP's DFS Report reflects the market value of the funds accumulated through December 31, 2010, net of all taxes currently due.