ML040220791
ML040220791 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 01/15/2004 |
From: | Robert Davis Neal R. Gross & Co. |
To: | Office of Nuclear Reactor Regulation |
Byrdsong A T | |
References | |
50-413-OLA, 50-414-OLA, ASLBP 03-815-03-OLA, RAS 7257 | |
Download: ML040220791 (214) | |
Text
AS 7c?51 Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION
Title:
Duke Energy Corporation Catawba Nuclear Station Docket Number: 50-413/414-OLA; ASLBP No.: 03-815-03-OLA Location: Charlotte, North Carolina DOCKETED USNRC January 21, 2004 (10:30AM)
Date: Thursday, January 15, 2004 OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF Work Order No.: NRC-1 266 Pages 615-826 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005 i (202) 234-4433 iel mpIcdte- 9 E=
< -O3 4 SEC_-
_5ECy- oa -
615 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD ORAL ARGUMENT I
In the Matter of:
ii1I DUKE ENERGY CORPORATION IlDocket Nos. 50-413-OLA, I! 50-414-OLA IIASLBP No. 03-815-03-OLA Catawba Nuclear Station, II Units 1 and 2
.~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
ii I
Thursday, January 15, 2004 Courtroom 2 Charles R. Jonas Federal Building and U.S. Courthouse 401 W. Trade Street Charlotte, North Carolina The above-entitled matter came on for hearing, pursuant to notice, at 9:00 a.m.
BEFORE:
ANN MARSHALL YOUNG Chair ANTHONY J. BARATTA Administrative Judge THOMAS S. ELLEMAN Administrative Judge NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross .com
616 APPEARANCES:
On Behalf of the Licensee:
DAVID A. REPKA, ESQ.
ANNE W. COTTINGHAM, ESQ.
of: Winston & Strawn, LLP 1400 L. Street, NW Washington, DC 20005-3502 (202) 371-5726 (DR)
(202) 371-5724 (AC)
(202) 371-5950 fax and TIMIKA SHAFEEK-HORTON, ESQ.
of: Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 (704) 382-8134 (704) 382-4504 fax:
On Behalf of the Intervenors, Blue Ridge Environmental Defense League and Nuclear Information and Resource Services:
DIANE CURRAN, ESQ.
of: Harmon, Curran, Spielberg & Eisenberg, L.L.P.
Suite 600 1726 M Street, NW Washington, DC 20036 (202) 328-3500 On Behalf of the Nuclear Regulatory Commission:
ANTONIO FERNANDEZ, ESQ.
SUSAN L. UTTAL, ESQ.
Office of the General Counsel Mail Stop 15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (301) 415-8339 AF (301) 415-3725 SU (301) 415-3725 fax NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
617 Also Present:
Frank Akstulewicz, NRC Bert Dunn, Framatome Robert Harvey, Duke Energy Edwin S. Lyman, Ph.D.
Robert Martin, NRC Stephen Nesbit, Duke energy Greg Swindlehurst, Duke Energy James Wilson, Duke Energy Janet Zeller, BREDL Louis Zeller, BREDL NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
618 I-N-D-E-X AGENDA PAGE Preliminary Matters 619 Arguments on Good Cause Intervenors -- Diane Curran 645 Duke Energy -- David Repka 671 NRC Staff -- Susan Uttal 683 Response to Good Cause Arguments Intervenors -- Diane Curran 694 Duke Energy -- David Repka 699 Argument 702 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
619 1 P-R-O-C-E-E-D-I-N-G-S 2 9:45 a.m.
3 CHAIR YOUNG: All right. Let's go on the 4 record. I'm Ann Marshall Young, Chair of this 5 Licensing Board. Judge Elleman and Judge Baratta, 6 would you introduce yourselves for the record?
7 JUDGE ELLEMAN: My name is Thomas Elleman.
8 I'm a former educator and participant in nuclear 9 energy programs through a variety of means.
10 JUDGE BARATTA: Like Judge Elleman my name 11 is Anthony Baratta, I'm a former educator and a 12 participant in various nuclear energy programs.
13 CHAIR YOUNG: Why don't we start over here 14 on the right. Mr. Repka, you want to introduce 15 yourself and whoever's with you and then move across 16 the room?
17 MR. REPKA: Yes. I'm David Repka with the 18 law firm of Winston & Strawn representing Duke Energy, 19 and on my left today you'll remember from last month, 20 Mr. Stephen Nesbit who's the Duke Energy MOX Fuel 21 Project Manager. And I wanted to introduce a few of 22 the other individuals that are behind me. First, 23 there's Ms. Cottingham, my colleague at Winston &
24 Strawn. And then immediately behind me is Mr. Bert 25 Dunn who's with Framatome, and he's an Accident NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
620 1 Analysis Manager. And the next row behind is Mr. Greg 2 Swindlehurst with Duke Energy. He's the Safety 3 Analysis Manager for Duke Energy in the Fuels area.
4 And sitting next to him is Mr. Robert Harvey, a senior 5 engineer safety analyst for Duke Energy. And then one 6 more row behind them, I believe, is Ms. Timika 7 Shafeek-Horton, and I can spell that: T-I-M-I-K-A, 8 Shafeek is S-H-A-F-E-E-K, dash, H-O-R-T-O-N. And 9 she's an attorney with Duke Energy.
10 CHAIR YOUNG: Thank you. Mr. Fernandez?
11 MR. FERNANDEZ: Antonio Fernandez for the 12 staff.
13 MS. UTTAL: Susan Uttal for the staff.
14 CHAIR YOUNG: Do you want to introduce any 15 of the people with you?
16 MS. UTTAL: With us today is the Project 17 Manager for this project, Robert Martin from NRR; the 18 Environmental Project Manager, James Wilson; and way 19 in the back is Frank Akstulewicz who is the supervisor 20 in NRR.
21 CHAIR YOUNG: What was the last name?
22 MS. UTTAL: Akstulewicz. Don't ask me to 23 spell it.
24 CHAIR YOUNG: It would probably be better 25 -- Mr. Akstulewicz, could you spell your name for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
621 1 court reporter?
2 MR. AKSTULEWICZ: Sure. It's A-K-S-T-U-L-3 E-W-I-C-Z.
4 CHAIR YOUNG: Thank you. Anyone else for 5 the staff?
6 CHAIR YOUNG: No.
7 MR. FERNANDEZ: No, Your Honor.
8 CHAIR YOUNG: All right. Ms. Curran?
9 MS. CURRAN: Good morning. I'm Diane 10 Curran here representing Blue Ridge Environmental 11 Defense League. Sitting next to me is our expert, Dr.
12 Edwin Lyman, and I'd like to introduce, or 13 reintroduce, Janet and Louis Zeller who are the 14 Directors of BREDL.
15 CHAIR YOUNG: Thank you. All right. Just 16 to recount some discussion that we had before the 17 record, before we went on the record, the oral 18 argument on BREDL's Motion for Extension will be held 19 January 21 at two o'clock in the Atomic Safety and 20 Licensing Board Hearing Room in Rockville, and that 21 will be a closed hearing since we will be dealing with 22 security-sensitive material. And only those who have 23 clearances will be admitted to that hearing. And I 24 think at this point that, Ms. Curran, you and Dr.
25 Lyman's clearances are finished, right?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.neargross.com
622 1 MS. CURRAN: Yes.
2 CHAIR YOUNG: Okay. And, Mr. Repka, you 3 were waiting on yours. Is yours done?
4 MR. REPKA: No, that's complete.
5 CHAIR YOUNG: Okay.
6 MR. REPKA: For safeguards material.
7 CHAIR YOUNG: Great. All right. Well, 8 for Safeguards.
9 MR. REPKA: For Safeguards. As is Ms.
10 Cottingham.
11 MS. CURRAN: But Dr. Lyman and I both 12 have, in addition to the Safeguards clearance, Level 13 L security clearances for classified information.
14 CHAIR YOUNG: All right. Now, what do you 15 have?
16 JUDGE BARATTA: I just have safeguards at 17 this point.
18 CHAIR YOUNG: Okay. All right. So that 19 hearing will be held next week. That oral argument 20 will be held next week.
21 Meanwhile, the staff and Duke provided to 22 us Ms. Curran's motion along with one of the exhibits 23 to that, the January 13 letter to Ms. Curran from Mr.
24 Fernandez, and we have read that letter and read 25 through most of the motion. There are several things NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
623 1 that come to mind. One, we all agree that we do think 2 that it's appropriate to put on the record that 3 obviously some delay is involved here and that the 4 staff's failure to reply in the letter that I just 5 mentioned until January 13, the day before the 6 security-related contentions were due, has obviously 7 contributed significantly to any delay that may be 8 caused by this issue. And this does run counter to 9 our concern to move this case along as quickly as 10 possible --
11 MR. FERNANDEZ: Your Honor, can I say 12 something?
13 CHAIR YOUNG: -- which we will still in 14 our capacity as a Board make every effort to continue 15 to facilitate.
16 Another issue -- we'll hear from you in a 17 minute -- another issue that arises out of all this is 18 the one raised by Mr. Repka right before we went on 19 the record having to do with clearance and access to 20 the materials that are being requested and that are in 21 dispute or that -- on which the need-to-know question 22 has arisen. Some of these materials are classified.
23 I have acute clearance, I'm cleared to see those 24 materials. Judge Baratta and Judge Elleman are 25 currently cleared to see safeguards material, but NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005.3701 www.nealrgross.com
624 1 their clearances have not been completed to see the 2 classified material, and, Mr. Repka, yours is only for 3 safeguards. Is there anyone at Duke who has a 4 clearance to see classified?
5 MR. REPKA: Mr. Nesbit has an L clearance 6 for classified.
7 CHAIR YOUNG: Any attorney? Is Ms.
8 Vaughn?
9 MR. REPKA: We do not believe so.
10 CHAIR YOUNG: Okay. One thing that we 11 have discussed and we do think that we will need to 12 see those materials, and I presume that's what the 13 staff was referring to before we went on the record 14 about the need to look at those in order to make these 15 determinations, since -- well, Judge Elleman won't be 16 available because of a previously planned -- because 17 of previously made plans which would have been fine 18 - had this issue not arisen at this point, but since 19 Judge Baratta doesn't have clearance, we may be 20 talking to the Chief Judge about seeing if, at least 21 temporarily, we can get substitute members appointed 22 to deal with any classified material. We're going to 23 have to look at it in order to make the determination.
24 That obviously is going to hang us up unless we can 25 get another Board member so that we can get a majority NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.neaIrgross.com
625 1 decision by the Board at least.
2 So without getting into discussing 3 anything that's inappropriate here today, I wanted to 4 make the staff aware that we will probably be 5 contacting you, and to the degree that involves any 6 telephone calls to facilitate that, we will -- I guess 7 we'll try to -- if there's anything going to be 8 discussed -- that's going to be discussed that would 9 affect -- would be to an advantage or disadvantage of 10 any party, we'll try to get the parties involved.
11 Otherwise unless any of the parties object today, 12 we'll just undertake whatever communications we need 13 to undertake simply in order to get access to the 14 materials or go to look at them in a secure location, 15 whatever that involves.
16 I suppose if we get another Board member 17 temporarily appointed who has clearance to see the 18 classified material, then -- well, the problem is if 19 those were brought to the January 15 proceeding, then 20 some people like Mr. Repka and Judge Baratta wouldn't 21 be able to look at those materials. One thing that we 22 definitely want is to have a security person there.
23 It may be possible that the items can be in the room 24 as long as people who don't have proper clearance 25 don't look at them, but I'm not sure. Mr. Fernandez?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
626 1 MR. FERNANDEZ: Your Honor, I think the 2 best thing would be for us to -- we would provide the 3 documents, of course, to the Board, and the board, I'm 4 sure, would ensure, the Board itself, to just manage 5 it the way that they have managed safeguards and 6 classified information before. I think for purposes 7 of the hearing on the motion itself, there probably 8 won't be a need to have the actual documents because 9 of the nature of what we will be discussing. I think 10 the Board will probably have to review the documents 11 in camera on its own without the parties being there 12 to make their determination of whether there is a need 13 to know on the part of the Intervenors. But I don't 14 think that you'll need to have the documents right 15 then and there when the parties are there.
16 CHAIR YOUNG: Let me just ask on that, 17 won't counsel be arguing about the contents of those 18 in such a way that might --
19 MR. FERNANDEZ: No. The staff will not.
20 MR. REPKA: I also wouldn't expect that to 21 be the case. My point before going on the record was 22 I think it's important that the Board see the Duke 23 submittal, which is what's the focus of this case, 24 which is safeguards material, not classified material.
25 And if there's something we can do expedite you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
627 1 getting a copy of that, we would be happy to try to do 2 that.
3 CHAIR YOUNG: Well, the staff has it, 4 right? I mean so we --
5 MR. REPKA: The NRC obviously has it, 6 that's correct.
7 CHAIR YOUNG: Right.
8 MR. REPKA: If you wanted it here today, 9 we could have a copy brought over at lunchtime. If 10 you'd rather not travel with it, you could get it when 11 you return.
12 CHAIR YOUNG: I think we'd probably better 13 just get it from the NRC staff when we get back.
14 MR. REPKA: But having said that, I don't 15 have an opinion as to whether the Board needs to see 16 the classified material. In fact, I think that when 17 you see the Duke submittal and you see really what's 18 involved here, it will clarify the issue greatly, and 19 I think it's at that level that we would intend to 20 discuss it next week.
21 CHAIR YOUNG: Ms. Curran, what about you 22 in terms of discussing classified as opposed to 23 safeguards?
24 MS. CURRAN: Well, it seems to me if I 25 were the Judge, I'd want to see what was being NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
628 1 disputed and be able to ask, I guess, the staff who's 2 the only party who has access to these standards 3 right, ask them questions about it having those things 4 in hand that I could look at. We certainly have the 5 sense of shooting in the dark, to some extent, because 6 we only have pieces of information, but one would hope 7 that the Board would not be put in that position also 8 and could ask questions of the staff.
9 MR. FERNANDEZ: Your Honor, can I say one 10 more thing? The classified documents that we're 11 talking about are two orders.
12 CHAIR YOUNG: Are what?
13 MR. FERNANDEZ: Are two orders issued to 14 the Category I facilities around the country, there's 15 only two, one to BWXT and one to NFS. The staff's 16 position is that those orders were issued to specific 17 licensees and as such they're not applicable to the 18 Licensee in this litigation. Those orders are of 19 limited scope and applicability and therefore as a 20 legal standard that Ms. Curran is talking about are 21 only applicable to the licensee to whom it is issue.
22 CHAIR YOUNG: Okay. We're -- I think 23 you're --
24 MR. FERNANDEZ: I know, I know. But the 25 reason why I'm bringing that up is because we wouldn't NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
629 1 have to talk about the contents of the classified 2 portion of that order. The publicly available portion 3 of the order explains that the terms contained within 4 the attached version, which is the classified version, 5 only apply to X and Y Licensee, BWXT and NFS. So we 6 wouldn't have to get into what actually BWXT and NSF 7 were ordered to do in order to talk about whether, I 8 guess, on a jurisdictional argument whether they're 9 actually even relevant in this proceeding.
10 CHAIR YOUNG: Well, let me just say this:
11 Why don't we make -- the Board would request at this 12 time that we be given access to the documents, that I 13 be given access to the two that are classified, and 14 we'll let you know if the Panel determines to appoint 15 another temporary member who has clearance to see the 16 classified, and we'll make the determination whether 17 we need to have them in the hearing between now and 18 then.
19 MR. FERNANDEZ: Can I ask one question, 20 Your Honor?
21 CHAIR YOUNG: Sure.
22 MR. FERNANDEZ: The documents are -- you 23 just need an L level clearance. Do Judge Elleman and 24 Baratta not even have the L level clearance yet? It's 25 the yellow badge.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
630 1 JUDGE BARATTA: My clearance is in 2 processing now.
3 MR. FERNANDEZ: Okay.
4 JUDGE BARATTA: Judge Elleman does have an 5 L level --
6 MR. FERNANDEZ: Okay. He does.
7 CHAIR YOUNG: And he's not going to be 8 here.
9 MR. FERNANDEZ: Oh, okay. Okay. You 10 don't need a blue badge to see these documents is what 11 I'm trying to get at.
12 JUDGE BARATTA: There was one other 13 document, I just wanted to ask the classification 14 level on it. I have a pretty good idea what it's at.
15 That's the design basis threat for a Category I 16 facility. Isn't that classified?
17 MR. FERNANDEZ: The design basis threat 18 for the two Category I facilities, the two orders that 19 we're talking about, those two documents are 20 classified, but they are specific to those two 21 licensees.
22 JUDGE BARATTA: I understand. Thank you.
23 MS. CURRAN: Judge Young?
24 CHAIR YOUNG: Yes.
25 MS. CURRAN: I just want to make a comment NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
631 1 to clarify this a little bit. I think there's another 2 dispute that's being woven in here, and it just needs 3 to be identified. This is a dispute which I think we 4 are going to have in this case over what standard is 5 -- which Category I standard is applicable here in 6 this licensing case. Before September 11 or before 7 April 29, 2003, which is when the revised Category I 8 design basis threat was issued to these two 9 facilities, NSF Erwin and BWXT, there was a classified 10 Category I design basis threat for Category I 11 facilities, and I think the staff is taking the 12 position and is conceding that that's the standard 13 that governs here and that the April 29 orders, the 14 revised standards, the post-9-11 standards don't apply 15 because they haven' t been imposed by enforcement order 16 on this particular Licensee.
17 CHAIR YOUNG: Because they have not, is 18 that what you said?
19 MS. CURRAN: Right. Because no order has 20 been issued to Duke saying, "This is your revised 21 Category I standard," and it seems to be that NRC's 22 practice of waiting until after a license is issued 23 and then issuing that by enforcement order, which we 24 believe is illegal and we plan to raise that as an 25 issue in this case. But I just wanted to clarify that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
632 1 you have to pull those things apart. Even if the 2 Board ultimately decides that the April 29, 2003 3 orders are not relevant in this proceeding, there's 4 still a pre-9-11 standard that's classified, a 5 Category I standard, that's applicable to Catawba by 6 virtue of the fact that they are going to be using 7 plutonium at the facility.
8 CHAIR YOUNG: Okay. I don't think we want 9 to get into argument on the merits, but I do 10 appreciate that it's good to identify issues.
11 One other that strikes me, and I'm just 12 going to ask and all parties can answer to the degree 13 you feel is appropriate, but, Mr. Repka, you just said 14 a minute ago that you wanted us to look at your 15 request, your submittal.
16 MR. REPKA: The September '03 submittal 17 with Security.
18 CHAIR YOUNG: Right. And --
19 MR. REPKA: Because I think that explains 20 what's really happening here.
21 CHAIR YOUNG: My question is this: Am I 22 to assume from that that it's your view that the only 23 security-related contentions that might be submitted 24 would be related to those? And I would ask all of 25 you, probably more Ms. Curran, whether what we're NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
633 1 talking about here is limited to Duke's submittal or 2 involves broader questions of security? And not 3 having seen them, obviously, I'm in the dark somewhat, 4 but it did strike me that that might be an issue, and 5 if you can provide any clarification on that just for 6 purposes of getting us on the same track, that would 7 be helpful.
8 MR. REPKA: Well, certainly, the submittal 9 defines what Duke is planning to do with respect to 10 security for the MOX fuel lead assemblies, and that's 11 the issue in this case.
12 CHAIR YOUNG: Is there any other -- I 13 guess my question went to are there any other things 14 that provide any context that would be relevant that 15 we need to be aware of?
16 MR. REPKA: We think that's the relevant 17 document. Catawba is a Part 50 reactor and has 18 substantial security. The submittal explains the 19 additional security that will be provided --
20 CHAIR YOUNG: Okay.
21 MR. REPKA: -- and that's the issue in the 22 case, the adequacy of that.
23 CHAIR YOUNG: Okay. Is everyone in 24 agreement on that, just to simplify things?
25 MS. CURRAN: Well, yes. We're limited by NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
634 1 law to challenging the adequacy of the license 2 application to meet NRC safety and security 3 requirements, so our contentions will focus on the 4 adequacy of -- there's two parts of the security 5 submittal. One is the revisions to the security plan; 6 the other part is a request for an exemption from 7 certain of the Category I requirements. So our 8 contentions will focus on the adequacy of the plan to 9 satisfy NRC requirements and whether an exemption is 10 justified under the NRC standards for exemptions. In 11 order to be able to make those contentions, we have to 12 be able to describe what the standards are, and that's 13 our handicap here, we don't know what the standard is 14 for these things.
15 CHAIR YOUNG: Okay. Well, again, not to 16 get into arguments on the merit, it helps me to have 17 a little clarification. Do either of you have any --
18 JUDGE ELLEMAN: No.
19 CHAIR YOUNG: Do you want any more 20 clarification? All right. Then at the moment I had 21 not planned to be in the office on Tuesday because I 22 had a scheduled a doctor's appointment. I may need to 23 come in. But in any event if you could -- contact 24 will be made with you in one way or another on 25 possibly tomorrow, possibly Tuesday but at the very NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
635 1 latest if we could arrange for me to -- for us to see 2 all that we can see, Judge Baratta and I, on Wednesday 3 morning and for me to see the classified on Wednesday 4 morning at the latest. I don't know whether I'll be 5 able to come in on Tuesday or not.
6 MR. FERNANDEZ: And there are some of the 7 documents that you will need to see that we don't 8 have.
9 CHAIR YOUNG: Okay.
10 MR. FERNANDEZ: So we need to have a good 11 idea of which documents you do want to see and which 12 you--
13 CHAIR YOUNG: The ones that are listed in 14 the--
15 MR. FERNANDEZ: So you want to see all the 16 documents?
17 CHAIR YOUNG: I think we need to.
18 MR. FERNANDEZ: Okay. So what I will do 19 is I will contact the people on the staff to have 20 access to all of those documents --
21 CHAIR YOUNG: Okay.
22 MR. FERNANDEZ: -- and make sure that they 23 contact somebody on the Board. Would you like to give 24 me a contact name now or do you want to be contacted 25 personally?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
636 1 CHAIR YOUNG: I guess Judge Bollwerk 2 either tomorrow -- I'm not going to be -- we're going 3 to be staying down here in North Carolina.
4 MR. FERNANDEZ: Right.
5 CHAIR YOUNG: Judge Elleman won't be in 6 the office tomorrow.
7 MR. FERNANDEZ: Okay.
8 CHAIR YOUNG: And as I say, I may or may 9 not be able to get in Tuesday, so I'd say if you 10 cannot reach me, try to reach Judge Bollwerk.
11 MR. FERNANDEZ: Okay. I will --
12 CHAIR YOUNG: And also include in the 13 information -- I don't know what volume of documents 14 you're talking about.
15 MR. FERNANDEZ: Not very much.
16 CHAIR YOUNG: Okay. So it's not something 17 that would be difficult to carry over to our office.
18 MR. FERNANDEZ: No, not at all.
19 CHAIR YOUNG: Good.
20 MR. FERNANDEZ: I will have somebody from 21 the Office of Nuclear Security and Incident Response 22 contact Judge Bollwerk tomorrow.
23 CHAIR YOUNG: Okay. And then if they 24 could also be available to us if we have any 25 questions. Do you have any objection to that, Ms.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
637 1 Curran, to us talking to any security people just 2 about procedures with regard to classified? We've 3 dealt with safeguards and we're more familiar with 4 that, but --
5 MR. FERNANDEZ: I have Cindy Harbaugh, 6 which --
7 CHAIR YOUNG: Okay. Great.
8 MR. FERNANDEZ: -- doesn't work at NSIR so 9 she may not --
10 CHAIR YOUNG: She helps us on setting up 11 security arrangements for hearing, so --
12 MS. CURRAN: I don't have any objections 13 at all.
14 CHAIR YOUNG: Okay.
15 MR. FERNANDEZ: I'll have Cindy contact 16 Judge Bollwerk as well.
17 CHAIR YOUNG: Okay. Great. Call me 18 first. If I'm not there, call him.
19 MR. FERNANDEZ: Yes.
20 JUDGE BARATTA: I would ask for perfect 21 clarity the list of documents doesn't include the Duke 22 submittal, and I just confirmed that --
23 CHAIR YOUNG: Then add that to the list.
24 JUDGE BARATTA: Add that to the list, 25 right.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
638 1 CHAIR YOUNG: Thank you.
2 JUDGE BARATTA: And which is a safeguards 3 document, not a classified document.
4 CHAIR YOUNG: Please, yes. Please add 5 those to the list. Anything else on that?
6 MR. FERNANDEZ: Just one thing, Your 7 Honor, and for clarity of the record, and there's 8 something that you said at the beginning that I wanted 9 to clarify, which is with regards to the delay in the 10 filing of the contentions and something you said that 11 the staff has caused this delay. I don't think that's 12 perfectly accurate and that just reflects BREDL's side 13 of the story, and the staff's position-has been from 14 the beginning that these documents were not going to 15 be provided and she has known -- I mean the counsel 16 has known that the staff's position all along was that 17 these documents were not going to be provided to 18 BREDL, and she has known specifically about the need-19 to-know determination since January 9 that Ms. Uttal 20 talked to her on the phone.
21 Particularly, also, in a Board order that 22 I can't remember the specific date right now, we were 23 ordered to file for Motions of Extension of Time three 24 days prior to when the documents that were scheduled 25 to be due on a particular date were due, and if NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
639 1 there's been any delay here, it has been by the 2 Intervenor and not by the staff, so I just wanted to 3 make sure that the staff's position was clear and 4 accurate for the record.
5 CHAIR YOUNG: Ms. Curran, do you want to 6 respond to that and also to the timing of the motion?
7 MS. CURRAN: Well, when we first 8 negotiated the terms of the protective order, the 9 staff said, "We're not relying on these standards."
10 And not having access to any documents at all, I 11 wasn't in much of a position to argue with that. And 12 so we went to look at the documents, Dr. Lyman and I 13 went to look at the application, the security plan and 14 exemption request, as quickly as possible, two days 15 after they became available. We sent a letter to the 16 staff two days after that in which we set out, "Here's 17 what we read. These facts contradict, in our view, 18 your position." And I was in contact with the staff 19 counsel during December and early January asking when 20 can we expect a response to our letter, and it was my 21 understanding we were going to get a response sometime 22 the week ending January 9, but I got a telephone call 23 on the 9th saying, "We want you to know we've made the 24 determination and you'll be getting a letter." And I 25 have to say I wasn't thinking about the three-day NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
640 1 requirement. I was kind of waiting on this response 2 partly thinking, well, I've written a pretty detailed 3 letter here, the staff's going to engage me on these 4 issues, and then we'll have something to go forward 5 with. We have a dispute here and we need to work this 6 out.
7 So it's true, I didn't leave the three 8 days because I was waiting to see if I could get more 9 of an explanation to see if this could be worked out.
10 But really we did our best to bring this to the 11 Board's -- to work it out with the staff without going 12 to the Board first, and then we filed a motion when it 13 was clear that we weren't going to get anywhere.
14 MS. UTTAL: Judge, I have to dispute what 15 Ms. Curran said, to a certain extent. I called her up 16 on the 9th and I --
17 CHAIR YOUNG: What time?
18 MS. UTTAL: What time? About three-19 thirty, I was home at the time.
20 CHAIR YOUNG: Three-thirty Friday 21 afternoon?
22 MS. UTTAL: Yes, as soon as I found out 23 what the staff's determination was. And I told her 24 what the staff's determination and I told her the 25 basis, and she wanted a letter, but I specifically NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
641 1 called her on that date so that she would know and 2 take whatever action she had to take. It was her 3 insistence upon getting a written response, but she 4 had all the information when I spoke to her on Friday.
5 MS. CURRAN: Well, it's true that I had --
6 Ms. Uttal gave me orally all the information that was 7 ultimately in the letter, but I remember saying, 8 "Aren't I going to get more of an explanation of this 9 because the answer was you don't have a need to know, 10 the staff isn't relying on these documents," which is 11 what I had been told at the outset and I had seen 12 information that seemed to contradict that. So I was 13 asking for an answer that would explain some of these 14 contradictions that I had found. That's what I was 15 expecting in the letter on the following week, and I 16 was waiting to see if there was something more that 17 could be engaged here so we could move forward.
18 CHAIR YOUNG: Okay. Well, thank you for 19 your clarification. It looks as though the 20 determination was made Friday afternoon and the motion 21 was submitted on Tuesday after receiving the Tuesday 22 letter. And so that's all clear on the record. At 23 this point, I think probably everything else can wait 24 until the 21st, and by that time we will have looked 25 at the documents and we'll hear more from you then.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
642 1 MR. REPKA: Judge Young, I would like to 2 make a brief statement on that point.
3 CHAIR YOUNG: Go ahead.
4 MR. REPKA: Without trying to assign blame 5 to that particular issue. I'd like to make a brief 6 statement about schedule in this case, and I was going 7 to make this statement later, but I'll make it now 8 since it seems to fit. The lead assembly application 9 is a critical segment of a major international 10 nonproliferation program. To support DOE's schedule, 11 to support use of the MOX fuel lead assemblies in the 12 spring cycle, to support the schedule for fabrication 13 at Cadarache in France, Duke has asked for the NRC's 14 amendment by August of this year, and that schedule is 15 necessary for lots of reasons, including the fact that 16 the Cadarache facility is scheduled to close at the 17 completion of fabrication of these assemblies and no 18 later than July of '05. So the August deadline is a 19 real deadline, and it's the date that we've asked for 20 this license amendment, again to support a major 21 nonproliferation effort. So time does matter in this 22 case, and I just want the record to reflect that.
23 CHAIR YOUNG: We are acutely aware that 24 time does matter in this case, and that is one of the 25 reasons why we have been trying to move this case NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
643 1 along, and that is one of the reasons why we are not 2 pleased when it seems as though things are not moving 3 along on the part of the parties as quickly as they 4 might otherwise be. And the only effect that that 5 will have is that obviously it's going to push things 6 back.
7 This Board is committed to doing 8 everything that's humanly possible to get this case 9 resolved as quickly as possible. The parties, all 10 parties need to keep that in mind in all the actions 11 you take, in clarifying things with each other. So, 12 for example, that you don't tell us one thing about a 13 protective order and then later on we find out that 14 you're not in agreement. We don't have to go through 15 all that again, but I think that it bears repeating 16 that, yes, we're under some time pressure but that 17 means everyone needs to pay attention to doing 18 whatever is possible to make it possible for us to 19 move this along as quickly as we can. I don't think 20 there's anything more that needs to be said on that.
21 All right.
22 Okay. Just to look at the list here, 23 speaking of timeliness, I think the next issue that 24 we're going to talk about is the general issue of good 25 cause under 10 CFR 2714 for late filed contentions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.corn
644 1 And since the contentions were filed by BREDL, I think 2 we'll let BREDL argue first, then Duke and then the 3 staff. And we'll hear all your arguments on good 4 cause first. If you need to refer back to them as we 5 go into the individual contentions, that's 6 appropriate, but we thought that it would be more 7 efficient to deal with that first. Does anyone need 8 a break before we start on that? Otherwise we can 9 hear the arguments on timeliness and then take a break 10 and then move into the contentions. Okay. All right.
11 Go ahead, Ms. Curran.
12 MS. CURRAN: Okay. I would like to start 13 by making some corrections to Contentions 10 and 11.
14 CHAIR YOUNG: Corrections? All right.
15 MS. CURRAN: As a result of reviewing the 16 materials that were provided in the responses and 17 looking over some things, we've seen that some 18 unfortunate use of vocabulary in the IRSI viewgraphs 19 that are attached to our contentions -- IRSN 20 viewgraphs that were attached to our contentions led 21 us to misunderstand a little bit, but I don't think 22 it's significant for purposes of the admissibility of 23 these contentions. I just want to make these changes 24 to make sure that we've got it correct.
25 These viewgraphs used the word, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
645 1 "relocation of fuel," in two different context, in the 2 context of loss-of-coolant accidents, LOCAs, and 3 severe accidents. And in fact, while relocation is an 4 issue for both types of accidents, the phenomena are 5 different for each type of accident so that we had 6 cited some severe accident information under the LOCA 7 contention that should not have been cited there.
8 So on Page 3, at the bottom of Page 3, the 9 paragraph beginning, "The IRSN presentation points 10 out," well, that sentence -- most of that sentence 11 should be deleted. All the words of that sentence 12 after the words, "MOX fuel relocation," in the first 13 line should be deleted. And then the first word of 14 the following sentence, "This," should also be 15 deleted. As a result, the first sentence of that 16 paragraph should read, "The IRSN presentation points 17 out that plutonium MOX fuel relocation would increase 18 power and negatively affect heat transfer with a 19 deleterious impact on important LOCA parameters." The 20 reason for this is because the information that's 21 deleted relates to severe accidents.
22 And then I want to make a corresponding 23 change to Contention 11, which is a contention that 24 addresses severe accidents. On Page 5, in the 25 paragraph beginning, "Another part of the IRSN Phebus NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 -
www.nealrgross.com
646 1 proposal," -- are you with me?
2 CHAIR YOUNG: Yes.
3 MS. CURRAN: On the fifth line down, at 4 the end of that line, there's a phrase, "as discussed 5 in the basis of Contention 10,l going on to the sixth 6 line. I would like to cross out the phrase, "in the 7 basis of Contention 10," and also the footnote.
8 CHAIR YOUNG: Cross out the footnote.
9 MS. CURRAN: Yes. And in substitution 10 insert, "at Page 6 of the Phebus proposal." So the 11 sentence now reads, the whole sentence, "Phenomena 12 that could affect the probabilities of severe 13 accidents," --
14 CHAIR YOUNG: I'm sorry.
15 MS. CURRAN: I'm sorry, I'm just going 16 back to the beginning of the sentence.
17 CHAIR YOUNG: Oh, "the probability," I'm 18 sorry, I was on the wrong sentence. Go ahead.
19 MS. CURRAN: "Phenomena that could affect 20 the probabilities of severe accidents include the 21 poorer performance of MOX fuel during a LOCA compared 22 to LEU fuel," capital L, capital E, capital U, "which 23 could increase the chance that the accident cannot be 24 mitigated, as discussed at Page 6 of the Phebus 25 proposal." Phebus is spelled P-H-E-B-U-S, and there's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 _
www.nealroross.com
647 1 an accent on the B.
2 Again, I don't think that changes --
3 except for removing the confusing reference to the 4 severe accident information in Contention 10, that 5 does not change the content of either contention.
6 In evaluating the admissibility or the 7 equitable criteria for admitting late filed 8 contentions, the most important criterion is good 9 cause. Both the NRC staff and Duke have opposed the 10 admission of the contentions that are based on these 11 IRSN viewgraphs on a lack of good cause, and I think 12 it's necessary to take a step backwards and talk about 13 the whole sequence of events here that they claim 14 occurred beforehand that we could have seen this 15 information from and that we should have therefore 16 based a contention at the outset on.
17 In the fall of 2001, the NRC held 18 something called a nuclear safety research conference.
19 During that conference, according to the staff, the 20 IRSN presented a paper discussing fuel behavior during 21 a LOCA and fuel relocation and the effects thereof.
22 According to the staff, we could have seen from this 23 information some of the information that is presented 24 in our contentions. Now, this particular conference 25 had to do with LOCAs, had to do with design basis NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
648 1 accidents, which is the subject of Contention 10.
2 There was a poster presented at this conference, the 3 staff says a paper, that had to do with fuel behavior 4 during a LOCA, but this was in the context of a 5 general meeting on nuclear safety research. And the 6 staff claims that we should have been aware of the 7 information in that meeting.
8 Well, in the first place, this meeting was 9 generally described as a nuclear safety research 10 conference. It was not billed as a meeting about 11 plutonium MOX fuel. There was no reason, if one was 12 looking at the title of this proceeding, to think that 13 this was a meeting that would be relevant to the use 14 of plutonium Mox fuel. The NRC holds many meetings on 15 nuclear safety issues. There's nothing in the title 16 of that conference that would indicate, red flag, this 17 is something that has to do with plutonium MOX fuel.
18 CHAIR YOUNG: Let me just interrupt and 19 ask one question. I've been to a conference like 20 this. I think it may have been the same one at maybe 21 a different year, and I went to some of the programs.
22 If I'm recalling correctly, it was one of these, and 23 there were a lot of programs. Are you saying that 24 there wasn't anything in the agenda or anything in the 25 announcement or --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
. . 234-4433 (202) WASHINGTON, D.C. 20005-3701 www.nealrgross.com
649 1 MS. CURRAN: I don't know what the meeting 2 notice said.
3 CHAIR YOUNG: Okay. But is what you're 4 getting to that Dr. Lyman didn't see the particular 5 presentation? Is that what you're getting to? That 6 he was at the conference --
7 MS. CURRAN: I don't know if Dr. Lyman 8 recalls all the meetings that he went to in the fall 9 of 2001.
10 CHAIR YOUNG: Let me just, and the staff 11 can correct me if I'm wrong too, but just for my 12 understanding, my recollection of the conference that 13 I went to, which was not long after I came to the NRC 14 and I went to learn as much as I could, that there 15 were -- it's like a lot of conferences where there are 16 a lot of workshops, there's some plenary sessions and 17 then there's some periods of time where it breaks out 18 into different workshops. Is that more or less what 19 we're talking about?
20 MS. UTTAL: That's correct. And there was 21 an agenda published, and the agenda indicates that 22 there will be a session on fuel research and indicates 23 that there will be poster paper given on high burnup 24 and MOX fuels. There were several sessions over two 25 days on various aspects of fuel research, so it wasn't NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON. D.C. 20005.3701 www.nealrgross.comn
650 1 a hidden paper by any means.
2 CHAIR YOUNG: Go ahead. I just --
3 MS. CURRAN: Well, it certainly was long 4 before this proceeding was noticed, and whether BREDL 5 can be aware of every paper, every proceeding, 6 everything that is presented over the course of a 7 number of years it's very difficult to do that.
8 Another issue is, okay, this meeting took 9 place in 2001, and it says in the NRC staff's response 10 that the IRSN paper itself references documents dating 11 back to the 1980s. So at that point it seems that 12 this meeting was going over existing research on the 13 issue of fuel relocation, which is an issue for 14 uranium fuel as well as for plutonium fuel. If you 15 look at the attachments that are attachments to our 16 contention, the IRSN presentation from October 2003 --
17 CHAIR YOUNG: You're talking about the 18 attachments to your contention?
19 MS. CURRAN: Yes.
20 CHAIR YOUNG: I may have to apologize that 21 none of us may have the -- have brought the 22 attachments.
23 MS. UTTAL: I have an extra copy.
24 CHAIR YOUNG: If you have an extra copy, 25 that would be helpful. We apologize for our NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
651 1 oversight. I thought we had everything. Thank you.
2 MS. CURRAN: Okay. If you look at Page 36 3 of this attachment, it's a list of references. Some 4 of these references go back to the 1980s, but some of 5 them are dated 2002 and 2003, and one has no date at 6 all. So if you look at Number 8, Reference Number 8, 7 it's a paper written in December 2002 that discusses 8 the influence of hydrogen content on the alpha-beta 9 phase transformation temperatures and on the thermal-10 mechanical behavior of Zy4, M4 and M alloys during 11 the first phase of LOCA transient. Now, that -- okay, 12 then there's Number 9, which is dated April 2003, 13 which is entitled, "Behavior of M5 Alloy Under LOCA 14 Conditions as Compared to Zy4 Behavior." And then 15 Number 10 is called, "Unpublished IRSN Results," and 16 has no date.
17 There are also a couple of references, 18 Number 13 and 14, that are dated 2002 October and 19 March of 2002. I don't think these particular 20 references are relevant to our contentions. The most 21 important ones are 8, 9 and 10. Eight and 9 clearly 22 relate to the behavior of M alloys, which is 23 something that's a relatively new thing; it's under 24 study.
25 And these references are noted in the --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.neargross.com
652 1 earlier in the viewgraphs. For instance, on Page 24, 2 there's some information about the behavior of modern 3 clad alloys with respect to ballooning of the 4 cladding, and the reference here -- references that 5 are given are 7 to 9, so they include references that 6 are newer than the reference -- whatever might have 7 been discussed in the 2001 meeting. And if you turn 8 to Page 25, it refers to References 8 and 10. Again, 9 those are relatively recent studies.
10 So this information on the behavior of the 11 M5 cladding and the new alloys, that's new information 12 that would not have been discussed at the October 2001 13 meeting. And it is relied upon in the contention as 14 a basis for requiring a further inquiry and resolution 15 of these issues.
16 JUDGE BARATTA: I apologize for 17 interrupting. The point that you're making is those 18 references are after the 2001 meeting.
19 MS. CURRAN: That's right.
20 JUDGE BARATTA: Okay.
21 MS. CURRAN: And that some of these 22 assertions that are made in the viewgraphs, if you 23 turn back to, say, Pages 24 and 25, have to do with 24 the behavior of the M5 cladding and with these modern 25 clad alloys and low tin alloys under LOCA conditions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
653 1 And this is relevant to the question of the size of 2 the balloon that develops in a LOCA. I'm sorry?
3 JUDGE BARATTA: The degree to which 4 blockage occurs because of the ballooning is what I 5 believe your contention refers to.
6 MS. CURRAN: Both the blockage, that's one 7 issue, and also the amount of relocation that occurs 8 because the ballooning is what creates the space for 9 the fuel to fall. And the issue in a LOCA, one of the 10 issues is not just blockage but it's that the -- when 11 the fuel crumbles and falls it can become compressed, 12 and so you have these hot spots that have higher 13 energy than the rest of the fuel, which is an issue 14 with respect to uranium fuel as well, but it's more of 15 an issue with respect to plutonium fuel because the 16 energy of that fuel is higher in general.
17 JUDGE BARATTA: So your argument then is 18 that some of this information was not available at the 19 2001 meeting, it's more recent than that, and the 20 compounding of that information with previous 21 information then led you to the concern that is 22 expressed in your contention.
23 MS. CURRAN: And not only that but the 24 information that's new here is significant. It's not 25 just some new information, it's significant NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neargross.con
654 1 information.
2 JUDGE BARATTA: No, I understand that.
3 MS. CURRAN: And this is -- well, this 4 process is an iterative process; the Agency learns 5 more and more. This to us represents a significant 6 step in understanding acquisition of information, this 7 information that's presented in the October 2003 8 viewgraphs.
9 Another distinction here is the context of 10 this presentation in October 2003. This was a 11 proposal in which IRSN put together available 12 information about what is known about plutonium and 13 high burnup fuel under LOCA and severe accident 14 conditions and posed questions about what more needs 15 to be known and made a proposal for a testing program.
16 So it's a focused -- it was a focused presentation on 17 issues relating to plutonium MOX fuel and high burnup 18 fuel with a very focused discussion of what are the 19 outstanding questions and a proposal to do testing.
20 And, certainly, this was something that drew our 21 attention as being highly relevant to this proceeding.
22 So we do not believe -- or we believe that we have 23 good cause for filing this contention late, Contention 24 10 I'm referring to, which is the LOCA contention, and 25 that the existence of this 2001 meeting does not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
655 1 demonstrate that we lack good cause.
2 Another thing that I would point out is I 3 think good cause needs to be measured against what was 4 the original deadline for filing contentions. I 5 believe the original deadline was -- well, we filed 6 our initial set of contentions on October 21, 2003.
7 This IRSN presentation was made on the 23rd of 8 October, shortly after that deadline passed, and we 9 drafted -- once we were able to get the materials --
10 Dr. Lyman went to the presentation. Once we were able 11 to get the written materials, we got a contention in 12 with all deliberate speed, we made it within the 30-13 day deadline that the Board has set for if there is 14 good cause for a new contention.
15 So in terms of what the admission of this 16 contention would do to the proceeding, which I think 17 is the main concern behind the good cause standard, 18 this contention is being filed relatively soon after 19 the initial deadline for filing contentions, and, 20 certainly, the presentation that was made by IRSN was 21 right at the outset of the time for submitting issues 22 in this proceeding.
23 Now, the second meeting, and this is one 24 that Duke -- oh, no, I need to back up. The staff 25 also refers to a meeting of the Advisory Committee on NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
656 1 Reactor Safeguards that took place on May 3, 2002 at 2 which the staff says IRSN made a presentation to the 3 NRC on this same issue, making many of the same points 4 as in their October 21, 2003 presentation. In support 5 of this argument the staff cites the transcript of 6 that meeting at Pages 296-300. Now, I cannot say I 7 have read the transcript of that entire ACRS meeting 8 but on those particular pages of the transcript there 9 is no reference to plutonium MOX fuel. It appears 10 that what the ACRS was discussing was the issue of 11 uranium fuel relocation or general fuel relocation, 12 not the specific question of the characteristics of 13 plutonium fuel in relation to relocation.
14 And later on this morning in response to 15 arguments that are made by either Duke or the staff on 16 the admissibility of the contention, I would like to 17 address the general issue of fuel relocation and its 18 status, because that's relevant to the admissibility 19 issue, but I'm going to set that aside for now. So 20 that meeting did not provide information on which we 21 should have based a contention, at least not the 22 portion that the staff has cited here.
23 So then I'd like to go on to the meeting 24 that was cited by Duke in its response to our 25 contention. That was a meeting in February of 2002 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
657 1 where IRSN also presented slides regarding some 2 testing, some severe accident testing or testing using 3 -- simulating severe accident conditions that were 4 done at the VERCORS plant in France. And these tests 5 are -- there were two tests. One was referred to as 6 RT2 and one was referred to as RT7. According to 7 Duke, we could have based our contention on that 8 information.
9 Once again, I think a standard of 10 reasonableness has to be applied here in evaluating to 11 what degree BREDL should be aware of all the details 12 of various meetings that go on at the NRC. This 13 meeting in February 2002 was billed as an expert panel 14 that had come together to review the source terms for 15 plutonium MOX fuel and high burnup fuel. The slides 16 to which Duke refers were presented by one of the 17 panel members from France. The behavior of plutonium 18 MOX fuel, including relocation, was not the specific 19 subject of that meeting which took place over several 20 days, even though some of that information may have 21 been presented.
22 The meeting in 2002 had a fairly broad 23 purpose but one of the subjects that was discussed was 24 the data points that had been yielded by these tests, 25 RT2 and RT7, and what some of the implications of that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
658 1 might be. If you compare that to the meeting in 2 October 2003, the meeting in October 2003 was -- the 3 purpose of that meeting was to focus attention on the 4 information that is known as a result of those tests 5 but also to bring to bear as much understanding as 6 possible of the characteristics of the fuel and the 7 relevance of those characteristics to the severe 8 accident issue and to kind of synthesize the available 9 information and drive home the point that further 10 research is needed in order to understand the behavior 11 of this fuel in severe accident conditions.
12 Once again, the purpose of that meeting 13 was very clearly delineated: More testing is needed, 14 not enough is known here, we need to do something.
15 And certainly if the people who presented the 16 information in 2002 had nothing new to say, it's not 17 clear to us why they would have come all the way 18 across the ocean to simply repeat what they had said 19 in 2002. And if you look at the slides, there's 20 analysis in the slides, there's information in the 21 slides that puts together some of this information and 22 takes it a step further.
23 Okay. For instance -- and this 24 information is summarized on Page 6 of the viewgraphs 25 from October 2003. Now, some of the -- if you look at NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 wwsw.nealrgross.com
659 1 the -- on Page 6, there's a list of issues with check 2 marks in the left hand side. The first set of check 3 marks is six issues there. Now, if you compare that 4 to the viewgraphs that were presented in 2002, 5 especially toward the end in the last two elements, 6 you see those pieces of information in the 2002 7 presentation. What you don't see is the information 8 about the fuel structure, the stoichiometry, which I 9 think they garbled the spelling of, the very high 10 burnup in plutonium-rich clusters and that impact on 11 the fission product distribution in the fuel phase, 12 the difference between plutonium and uranium 13 chemistries with regard to oxygen. All these issues 14 have a fundamental impact on the rate and magnitude of 15 fission product releases and are highly relevant to 16 our contention. Again, this reflects a development in 17 increased understanding and increased theoretical 18 application of ideas to the data that was yielded by 19 these two earlier tests.
20 CHAIR YOUNG: So you're saying that all of 21 the checked items on Slide 6 or are you saying all or 22 most of those were not presented in the earlier --
23 MS. CURRAN: I would say if you look at 24 the viewgraphs that are cited by Duke in its response, 25 you see the last two items, but we did not see the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
660 1 other four.
2 CHAIR YOUNG: The first six.
3 MS. CURRAN: Yes.
4 JUDGE BARATTA: So you're in part saying 5 that there was a synthesis of a number of items that 6 occurred in this paper that was not present in the 7 previous papers, and that as a result you came to the 8 conclusion that you did.
9 MS. CURRAN: Yes.
10 CHAIR YOUNG: Are you about finished on 11 good cause?
12 MS. CURRAN: Almost.
13 CHAIR YOUNG: Okay. Great.
14 MS. CURRAN: I thought it might be helpful 15 if I passed out the viewgraphs from the February 2002 16 meeting so that you could compare them.
17 CHAIR YOUNG: Ms. Uttal, do you need this 18 back?
19 MS. UTTAL: No, I have an extra.
20 CHAIR YOUNG: You have an extra. Thanks.
21 So you don't mind if I keep this and mark on it?
22 MS. UTTAL: No.
23 CHAIR YOUNG: Okay. Great. Thank you.
24 (Curran passes out viewgraphs.)
25 MS. CURRAN: Okay. I'd like to move on to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON. D.C. 20005-3701 -
www.nealrcross.com
661 1 the other factors.
2 CHAIR YOUNG: Let's -- well, we were 3 thinking that the other factors might be more specific 4 to each different contention. If all of you agree 5 that they're not, then do you have any problem with 6 them going ahead with those? We thought there might 7 be some issues that would be more specific to the 8 different contentions, but what about -- let me hear 9 from Duke and the staff. Would you say it would be 10 more efficient to go ahead on all five factors?
11 MR. REPKA: I think it would be more 12 efficient to go ahead, just deal with the factors.
13 CHAIR YOUNG: And staff doesn't disagree?
14 MS. UTTAL: I don't disagree.
15 CHAIR YOUNG: Okay. Then go ahead.
16 MS. CURRAN: Okay.
17 JUDGE ELLEMAN: May I ask a question 18 before moving ahead?
19 CHAIR YOUNG: Yes. Sure.
20 JUDGE ELLEMAN: Before we move ahead on 21 those, the fuel performance of concerns seem to be 22 broadly divided into two issues. One is behavior of 23 the cladding -- ballooning, distortion, whatever -- in 24 MOX fuel. The other part of the concern is the 25 behavior of MOX itself, the slumping, relocation of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
662 1 the fuel within the clad. You pointed out the 2 cladding data are more recent, but was not the fuel 3 relocation information older, available information 4 that's a part of this concern?
5 MS. CURRAN: We don't think that you can 6 separate the cladding issues from the fuel issues.
7 There's issues of bonding between the fuel and the 8 cladding, there's the issue of the amount of space 9 that's available as a result of the ballooning for the 10 fuel to collapse into, and there's also the question 11 of whether the issue of fuel crumbling, which was 12 Generic Safety Issue-92, has actually been resolved 13 adequately. It appears that the staff recently 14 reopened the issue after it had been dropped. Again, 15 I was going to get into that a little bit later in 16 response on the admissibility of the contention.
17 As I said before, the good cause standard 18 is the single most important standard in evaluating 19 the admissibility of a late filed contention, aside 20 from whether it meets the admissibility criteria, and 21 we believe that we do have good cause for late filing 22 this contention. We've believed that from the start.
23 The other criteria for late filing the other four 24 criteria are not nearly as important and need be given 25 very little consideration if there is good cause.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
663 1 I'd like to read you a characterization of 2 those four other criteria that was made by the counsel 3 for the Commission before the U.S. Court of Appeals in 4 a 1990 case in which the new Part 2 standards that 5 were promulgated in 1989 were appealed. One of the 6 issues on that appeal, which I participated in, was 7 the fairness or legality of the Commission's applying 8 the late filing standard to contentions based on 9 environmental documents that became available after 10 the initial deadline for filing contentions. And I 11 represented the Union of Concerned Scientists in that 12 case, and it was our position that it was a violation 13 of the hearing requirement of the Atomic Energy Act to 14 apply such an equitable standard to the admissibility 15 of a contention where the --
16 CHAIR YOUNG: I'm sorry, say that again.
17 It was a violation to apply such an --
18 MS. CURRAN: Equitable standard. The only 19 relevant standard would have been the admissibility 20 standard and that one shouldn't have to leap over 21 other hurdles in order to gain admission of a 22 contention that couldn't possibly have been filed 23 earlier because the staff document wasn't available.
24 In opposing our argument, and the NRC did 25 prevail in that case, the NRC argued that these four NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
664 1 factors, the four factors in addition to good cause, 2 I'll quote the sentence by the Commission's lawyers.
3 CHAIR YOUNG: And can you give us a cite 4 for this?
5 MS. CURRAN: Yes. This brief is the 6 Commission's brief, brief for Respondents in Number 7 89-1617. The caption of the case is, "Union of 8 Concerned Scientists v. U.S. Nuclear Regulatory 9 Commission." The brief is dated August 30, 1990. And 10 I'm sorry to say I didn't bring the citation for the 11 case in which the -- the decision in which the case 12 was cited, and I can provide that to the Board if 13 you'd like it.
14 CHAIR YOUNG: Yes, please.
15 MS. CURRAN: This is a quote from the 16 brief: "The remaining four factors, which according 17 to Petitioner give the NRC, quote, 'broad discretion 18 to deny,' close quote, sound contentions, in 19 parenthesis, Petitioner's brief at 17, close 20 parentheses, simply give the NRC the authority to 21 prevent unnecessary or duplicative litigation by 22 latecomers. Any adjudicatory body must reserve 23 authority of that sort or it loses all control over 24 its proceedings." And then I won't give you the 25 citations to the Federal Rules of Civil Procedure that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.neargross.com
665 1 are given there.
2 In other words, the way the Commission's 3 attorneys characterized these four standards to the 4 Court of Appeals was as limited -- having a limited 5 purpose to prevent unnecessary or duplicative 6 litigation by latecomers and also to protect the 7 Commission from losing all control over its 8 proceedings. And I would submit that we are far from 9 that situation here. We are not latecomers. This is 10 very close to the beginning of this proceeding. We 11 are Petitioners who have put in a contention within a 12 matter of weeks after the deadline for initial 13 contentions closed. Discovery hasn't even started.
14 We haven't had a ruling on the admissibility of any of 15 the other contentions. We haven't resolved the issue 16 of whether we're going to be able to file contentions 17 on the safeguards information.
18 It's clear that this litigation that we 19 seek to do is not duplicative. There's no other party 20 that's raised this issue; we're the only party. And 21 the question of whether it's unnecessary, to us it's 22 very clear that we have raised significant safety 23 issues that should be addressed in this proceeding for 24 the experimental use of plutonium fuel in a U.S.
25 reactor for the first time.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
666 1 So I think that the evaluation of those 2 four criteria has to be put in that context, that the 3 Commission intended to limit the application of those 4 criteria to prevent unnecessary and duplicative 5 litigation.
6 CHAIR YOUNG: Can you also address those 7 four criteria from the standpoint of assuming without 8 giving any indication one way or the other, but if we 9 were to rule against you on good cause, what would 10 your argument be on the other four factors?
11 MS. CURRAN: Okay. Well, we believe we --
12 the most important criterion here in those four is the 13 one that relates to the Petitioner's ability to 14 contribute to the development of a sound record. And 15 there's no question here that we have based this 16 contention or these several contentions that relate to 17 the IRSN presentation on the wisdom, on the expertise 18 of a qualified expert, Dr. Lyman, whose curriculum 19 vitae we attached, who we have stated has extensive 20 experience in analysis of nuclear safety issues. So 21 we are not an intervenor that's coming in and 22 proposing to litigate this contention by cross 23 examining the witnesses of Duke and NRC staff. We 24 have an expert who is going to present testimony.
25 Now, both Duke and the staff criticized us NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
667 1 for not presenting a summary of Dr. Lyman's testimony.
2 I think that requirement becomes more important if 3 you're at the end of a case and you're trying to 4 figure out if you should hold the whole case up while 5 it's very close to concluding while you go through 6 some new safety issue, but that's not where we are 7 here. We're at the very beginning of the case. There 8 may be more that Dr. Lyman will say, but given that we 9 believe we have good cause, what we put in, we put in 10 as much information as we reasonable could without 11 delaying even further to do more research and come up 12 with actual testimony.
13 There's always a balance here between 14 trying to get issues in as quickly as possible and 15 then if -- if we were to have prepared a summary of 16 Dr. Lyman's testimony going into much more detail as 17 to how all these issues related, I think that would 18 have taken weeks, if not months, to do, and we want to 19 get that issue before you. So we certainly put as 20 much information as we possibly could in to support 21 the contention and to show that it has a strong basis, 22 that the basis includes data as well as theory, that 23 it's supported by the expertise of the French Research 24 Agency, which is an arm of the entire French 25 regulatory agency. We think that should be sufficient NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005.3701 www.nealrgross.com
668 1 to go ahead and admit this contention.
2 CHAIR YOUNG: Just to wrap up, do you have 3 anything further on the remaining factors?
4 MS. CURRAN: Well, the only other factor 5 here that might be relevant is the extent to which the 6 Petitioner's participation will broaden the issues or 7 delay the proceeding. Again, I think that criterion 8 has to be judged against where in the proceeding it 9 comes up. We're right here at the outset of the 10 proceeding, and I don't see that the -- of course it's 1 going to broaden the proceeding in the sense that it's 12 another issue that hasn't been put into contention 13 yet. If it were left off, there might be some time 14 saved, but it's a marginal amount of time because for 15 the entire case we're just at the inception. If this 16 issue is admitted with the other issues, then all the 17 various steps that have to do with this hearing can go 18 forward at the same pace. Discovery can go forward at 19 the same pace, summary judgment, the hearing. We're 20 not talking about adding a huge amount of time here, 21 just the marginal amount of time that it would take to 22 add one more issue to, say, a hearing that takes a 23 couple weeks. So I don't think that's a significant 24 factor.
25 CHAIR YOUNG: All right. If you want to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
669 1 wrap up, I think we need to move on.
2 MS. CURRAN: Okay. That's all I have on 3 this issue.
4 CHAIR YOUNG: Okay. Mr. Repka?
5 MS. UTTAL: Judge, I have to take a short 6 break before we continue.
7 CHAIR YOUNG: Okay. Let's take five 8 minutes and come back and finish on this and then 9 we'll break for lunch, I guess, after this.
10 (Whereupon, the foregoing matter went off 11 the record at 11:12 a.m. and went back on 12 the record at 11:26 a.m.)
13 CHAIR YOUNG: Okay. Mr. Repka, go ahead.
14 And I just -- I'm sure everyone is probably on the 15 same wavelength as we are here. We're going to finish 16 up on the factors argument, the timeliness and other 17 factors argument, before lunch. When we come back 18 we're really going to have to move quickly through the 19 more general admissibility requirements with regard to 20 the four contentions, because we do have to be out of 21 here by five again. We have to end by five. So just 22 to let you know so you can prepare we're going to be 23 keeping you to some real tight deadlines this 24 afternoon, timelines. Okay. Mr. Repka.
25 MR. REPKA: Thank you, Judge Young. I'll NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
670 1 try to be brief and to the point on these. I want to 2 address good cause first. But having listened to the 3 argument this morning, the first thing I'll say is 4 nothing I heard changes the positions we took in our 5 written response. I don't want to repeat all those 6 arguments this morning, but we believe those arguments 7 are still very much valid arguments.
8 Beyond that I want to respond to the 9 general tenor and some of the specifics this morning 10 on good cause. I think the basic point is what we've 11 heard from counsel would establish for BREDL a far too 12 lax standard for good cause. It seems to us that 13 BREDL is arguing on the one hand that they have an 14 expert on these issues that's going to significantly 15 aid in the development of the record, yet on the other 16 hand when it comes to good cause that same expert 17 could attend a number of meetings on these very issues 18 and yet not be held responsible to provide any 19 contentions on those issues on the appropriate date.
20 The Commission's standard again at the 21 time of filing contentions is that there's an iron 22 clad obligation to search the public record and raise 23 issues on the appropriate date.
24 A number of meetings have been discussed, 25 and I want to trace that history just a little bit NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
671 1 again because I think it's very significant. The 2 essential oint, the seminal point of the October IRSN 3 presentation to the NRC really dates back to the 4 VERCORS tests, which were 1998 tests. And those were, 5 as I think BREDL is recognizing in some of its 6 modifications to its contention this morning, are 7 severe accident tests. They're at conditions far in 8 excess of LOCA conditions, design basis LOCA 9 conditions, and really don't relate to MOX fuel 10 behavior at LOCA conditions. Just to clarify that a 11 little bit, a LOCA, design basis LOCA assumes 2200 12 degrees fahrenheit. The VERCORS tests from 1998 were 13 severe accident tests close to 2000 degrees hotter 14 than that. Essentially, they were cooking the fuel 15 till it melted to monitor performance with respect to 16 slumping the relocation. But 1998 those tests were 17 conducted. That's the seminal point here.
18 The staff cited to the fact that there was 19 a discussion at the meeting of October 2001. I just 20 want to emphasize again that based on that testing 21 representatives from the French research agency, IPSN, 22 did give the poster paper at that meeting. The title 23 of it is very clear from the agenda. It's, quote, 24 "Need for Experimental Program on LOCA Issues Using 25 High Burnup and MOX Fuels." Note the title talks NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
672 1 about LOCA issues, not just severe accident issues but 2 LOCA issues, and it refers to MOX fuel. As can be 3 seen in the agenda or the attendants page that's 4 attached those materials, Dr. Lyman was one of the 5 attendees of that meeting.
6 CHAIR YOUNG: Can you tell whether he 7 attended that particular part of the program?
8 MR. REPKA: Cannot. I cannot. Now, if 9 you look at the paper itself, there are a number of 10 figures in that paper. And just by way of examples, 11 those that seem to be directly relevant to the 12 contention would include Figure 1, which is a graph of 13 performance during, quote, "a typical LOCA transient."
14 CHAIR YOUNG: When you're talking about 15 the paper, you're talking about --
16 MR. REPKA: Oh, I'm sorry. This is the 17 paper that's included by the NRC staff as an exhibit 18 to their filing. The paper from --
19 CHAIR YOUNG: Two thousand one.
20 MR. REPKA: -- October 2001. Figure 1 is 21 the transient response. Figure 2 shows pictures of 22 the fresh fuel rod and some of the characteristics of 23 those fuel rods. Those same pictures repeat 24 themselves in the October 2003 presentation. So there 25 is a direct analog here between what IPSN was NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
673 1 presenting in 2001 and what was presented in October 2 2003 and that's presented here as the basis for the 3 contention.
4 What we have, essentially, is an ongoing 5 story that really dates again from the VERCORS tests 6 in 1998 in which ISPN is suggesting some further 7 research. This was not new information in October 8 2003.
9 CHAIR YOUNG: I assume you're going to 10 talk to us about the differences that Ms. Curran 11 mentioned.
12 MR. REPKA: Yes. I think Judge Elleman 13 created an interesting construct to look at this, the 14 technical issue resolving, he suggested, into two 15 issues: The behavior of the cladding and, number two, 16 the behavior of the MOX or the so-called relocation, 17 the MOX fuel itself. I would suggest that it could be 18 looked at as three issues: The behavior of the 19 cladding, the behavior of the MOX or the relocation of 20 the fuel itself during severe accident conditions and 21 a third being the behavior of the MOX or the fuel 22 relocation during design basis LOCA conditions.
23 On those issues, the first addressing the 24 cladding, there is nothing in the VERCORS tests or in 25 the subsequent IPSN or IRSN presentations directly NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
674 1 addressing that point. There are some speculations, 2 some areas identified for potential research; however, 3 there's no new data, no new information on cladding.
4 In fact, on the M5 cladding itself, there is 5 significant information that was available prior to 6 October 2003 and in fact prior to many of these 7 meetings. Most significantly is the cladding topical 8 report and the NRC's safety evaluation report, which 9 have been referenced in the various filings before.
10 But the safety evaluation report with the final 11 version of the topical report was issued in February 12 2000, so there's substantial cladding information 13 available.
14 With respect to some of the references in 15 the October 2003 IRSN presentation, that's Page 36, 16 again there are a number of references in there 17 related to cladding, M5 alloys, particularly 18 References 8, References 9. Those have dates of 19 December 2002, April 2003, both of which would have 20 supported a filing of a contention on the original 21 schedule. Again, if there's substantial expertise to 22 support this contention other than the slide 23 presentation, that information would have been 24 available to such an expert. That's the issue of 25 cladding.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
675 1 With respect to the behavior of MOX fuel 2 during severe accident conditions, again, that's what 3 the VERCORS tests were all about, both the RT2 and the 4 RT7 tests. Those are specifically described in the 5 February 2002 meeting, which we, Duke Energy, refer to 6 in our response to the proposed contention, and that's 7 the slide presentation that Ms. Curran just handed out 8 this morning.
9 There is no information in the October 10 2003 presentation on severe accidents that's any 11 different than what was presented in February 2002.
12 In fact, the February 2002 presentation is a far more 13 fulsome discussion of the range of tests conducted by 14 VERCORS. It shows very dramatically, and we'll get 15 into this more when we talk about the basis for the 16 contention, but on Page -- they don't have page 17 numbers. It's Page 7 if you count back, a slide 18 titled, "VERCORS Tests With MOX Fuel," and it's 19 looking at the fuel degradation, which is, to use 20 Judge Elleman's characterization, the effect on the 21 MOX itself. You see there are two tests, the RT7 and 22 the RT2. They were conducted at 2950 degrees Kelvin 23 and 2450 degrees Kelvin, respectively. Without doing 24 the conversion but those are temperatures 25 approximately in the 4000 degrees fahrenheit range.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
676 1 That's far in excess of the design basis LOCA 2 temperatures of 2200 degrees. So this shows that 3 those tests related to severe accidents, not to LOCA 4 analysis, and it gives the details. It also discusses 5 in that paper the fact that there were other tests on 6 LEU fuel.
7 But, again, with respect to the good cause 8 issue, there's nothing in October 2003 that wasn't 9 already presented in more detail in February 2002.
10 And, again, this is the slide package that was handed 11 out this morning. As we referenced in our filing, 12 there are transcripts of the February 2002 meeting, 13 and the pages that we referenced in our response Dr.
14 Lyman was at those meetings so was certainly -- and 15 participated at those meetings, so certainly had 16 reason to be aware of these severe accident tests.
17 Now, with respect to the third issue, 18 which at least some of the contentions seem to be 19 directed at, which are not severe accident 20 contentions, they're LOCA contentions, again, there is 21 nothing new in October 2003 on the issue of MOX fuel 22 performance at LOCA temperatures. The basic tests 23 discussed in October 2003, just as in February 2002, 24 just as in the earlier 2001 meeting, are the VERCORS 25 tests, the severe accidents tests. Anything else NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
677 1 related to MOX fuel at LOCA temperatures is simply 2 extrapolation or speculation based upon those tests, 3 and that extrapolation, that so-called uncertainty 4 could easily have been made in February 2002 or even 5 earlier. There's nothing new in 2003 that suggests 6 new data related to fuel performance at LOCA 7 temperatures. In fact, in discussing that issue this 8 morning, Ms. Curran, trying to show something new,'
9 goes back to Slide 6 of the October 2003 presentation, 10 but that slide, again, references the VERCORS tests 11 and specifically relates to severe accident 12 conditions, not design basis LOCA conditions.
13 CHAIR YOUNG: Let me just see if I can 14 clarify something, and you can help me out on this.
15 As I understand it, you're saying that all of the data 16 was available prior to the October 2003 presentation 17 and that anything new in the October 2000 presentation 18 was extrapolation of the data. What I'd like to get 19 a better understanding of is whether the analysis that 20 was done could be characterized as producing any 21 insights or theories that had not been put forth prior 22 to that time. And I may not be phrasing this 23 completely accurately but I'm trying to get across a 24 general idea, because what I understand the Petitioner 25 to be saying is that there were new analyses that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
678 1 produced some new hypotheses, at least, and I'm trying 2 to get a sense of the significance of those.
3 MR. REPKA: Okay. In the October 2003 4 presentation, there was no new test results reported, 5 no new analytical results reported. There was nothing 6 new other than the fact that IRSN was continuing to 7 raise the same issue it had been raising for several 8 years and has been raising for several years and is 9 suggesting uncertainties and is suggesting further 10 tests. However, there's no new information, no new 11 data in October 2003.
12 CHAIR YOUNG: Maybe you can help me out by 13 looking at the six checked -- on Slide 6, the six 14 items that are checked that the Petitioner was saying 15 were new or were different from earlier presentations.
16 MR. REPKA: On Page 6, again, they're 17 looking at the results of the severe accidents tests 18 at VERCORS. The first item, fuel structure is 19 different. The differences in the fuel structure 20 between MOX and LEU fuel that's not a new issue, that 21 predates this slide. That's a given. And, certainly, 22 in the various materials on MOX fuel those differences 23 are explained.
24 High burnup impacts on fuel stoichiometry, 25 I think the point on this is similar to many of the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
679 1 rest of these items. Mr. Nesbit has read the 2 transcripts of those meetings and believes that most, 3 if not all, of these items were discussed at the 4 February 2002 meetings. However, the basic point 5 being these relate to fuel stoichiometry. The 6 plutonium cluster impacts, the chemistries, those are 7 issues related to the structure of the fuel, which, 8 again, IRSN was not presenting anything that's new, 9 anything that -- the fact of a difference is not new 10 information nor are they stating that there is any new 11 insight about those characteristics. They're simply 12 stating that these are factors that might possibly 13 combine with the fact that there's this one severe 14 accident tests that showed a lower relocation 15 temperature, a temperature still far in excess of 16 design basis LOCA temperatures, but they were not 17 making any new finding about these characteristics.
18 And, certainly, if they did not do that in 2002 or 19 2001, and we believe that they did, certainly an 20 expert could have extrapolated the same things and 21 come to the same conclusion.
22 CHAIR YOUNG: Were they raising questions 23 that had not been discussed before?
24 MR. REPKA: No. I think, fundamentally, 25 the issue was exactly the same in 2003 as it was in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
680 1 2001. I think, not to put too fine a point on it, but 2 this is a research agency that's looking for somebody 3 to support their research, and I think they've been 4 looking for several years.
5 I think the bottom line on good cause is 6 these are issues that have been out for some time and 7 certainly an expert in the field could have, and in 8 this case, did attend many of the very meetings at 9 which they were discussed, and there's no good cause 10 for any delay with respect to filing contentions on 11 these issues.
12 Now, with respect to the good cause 13 factor, this morning Ms. Curran seemed to argue a 14 little into good cause the concept of, well, we 15 weren't that late. That's not the good cause 16 standard. The amount of the delay is not good cause.
17 Delay is a factor, a separate factor, one of the less 18 important factors, but with respect to good cause it's 19 absolute. You either had cause to file late or you 20 didn't, and in this case there really was no good 21 cause.
22 With respect to the other factors -- I'll 23 turn to the other factors unless there's more 24 questions about good cause. I agree fully with Ms.
25 Curran that the other four factors are less important.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
681 1 However, I think that even those factors, on balance, 2 don't weigh in favor of considering this contention 3 and in fact, in any event, are far outweighed by the 4 lack of good cause. Again, a significant factor of 5 the four, I won't address them all, but a significant 6 one is the development of a sound record, and here the 7 argument is that Dr. Lyman will add to development of 8 sound record. However, he has not provided anything 9 in this contention that's independent of what IRSN has 10 produced, and IRSN hasn't produced anything related to 11 cladding, related to fuel relocation at design basis 12 LOCA temperatures, and with respect to even fuel 13 relocation at severe accident conditions has produced 14 conflicting results. He has not shown any particular 15 knowledge of those tests, the test conditions, the 16 results. In fact, that information, we understand, is 17 proprietary. So it's not clear to us at all how that 18 would aid to the development of a sound record in this 19 case. There's no particular expertise on the points 20 at issue. What we're being offered is simply the fact 21 of an IRSN research proposal. That fact alone doesn't 22 develop a sound record.
23 And I think, finally, I'd say that again, 24 as I said earlier this morning, time is critical in 25 this case. Time is critical to DOE meeting its NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
682 1 schedule to make a shipment of the plutonium material 2 to France and for those fabricated rods to be produced 3 before Cadarache closes and to meet the Oconee 4 operating cycle for 2005. In that context, any delay 5 in this proceeding, given where we are today, is 6 significant. And based upon that, even an argument 7 that a couple of days or a couple of months or a 8 couple of weeks is not important simply doesn't hold 9 water. I'm sorry, I said the operating cycle for 10 Oconee, I meant Catawba. Oconee, of course, is not a 11 viable alternative.
12 MS. UTTAL: Good morning. I don't have 13 that much to add, just a few points. Some mention has 14 been made of whether Dr. Lyman had attended all these 15 meetings. I don't think that whether he attended 16 these meetings is that important. There is the iron 17 clad obligation to review the application and to 18 review publicly available documents. The minutes of 19 these meetings or the papers that were presented are 20 all publicly available documents, they're available on 21 ADAMS, they're available probably on the Web, various 22 web sites. I obtained them in those ways. Whether or 23 not he attended these meetings or anyone from BREDL 24 attended these meetings, they did have the obligation 25 to review the record and to review the publicly NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
683 1 available documents to make sure there was nothing in 2 topic. I think that it's important to note what the 3 Commission said, and this is in my brief but I think 4 it's important to repeat it, in the Duke Energy case 5 having to do with license renewal regarding late filed 6 contentions. "There will be no end to NRC licensing 7 proceedings if the petitioners could disregard our 8 timeliness requirements every time he or she realized 9 that maybe there was something after all to a 10 challenge if either originally opted not to make it or 11 simply did not occur to it at the time or at the 12 outset." And I think that's what happened here.
13 CHAIR YOUNG: Is that the same thing that 14 you quoted in your --
15 MS. UTTAL: That's in my brief at Page 3.
16 I think that's what happened here. They opted not to 17 raise this issue or simply forgot to raise the issue.
18 I think there's numerous instances where these issues 19 have been raised, and I think another important 20 document that was touched upon by Mr. Repka is the 21 staff's February 4, 2000 SER regarding the M5 fuel 22 cladding where they discuss ballooning, ductility, 23 cladding swell and all the issues that were discussed 24 or at least raised by IRSN at the later date.
25 Therefore, this information was out there back in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
684 1 2000.
2 And I also think it's important to 3 remember that IRSN is in fact coming back to the NRC 4 periodically or repeatedly because they are looking 5 for funding to fund this research that they are 6 proposing. I don't think that there was -- and I 7 agree with Mr. Repka that there was nothing new raised 8 in October of 2003 by IRSN that would rise to the 9 level of good cause. These issues were out there, 10 they were out there for several years before the 11 contentions were filed, and it was the obligation of 12 the Petitioners to raise them in a timely fashion.
13 As to the other factors, I think that 14 without having shown good cause they have to make a 15 compelling showing on the other factors and they have 16 not done that. There will be a certain amount of 17 delay to the proceeding as a result of late filed 18 contentions. As the staff stated in its brief, there 19 is no indication that Dr. Lyman would add to a sound 20 record, because there's no indication of what he would 21 say. As Mr. Repka pointed out, the only information 22 provided in the contentions is the information raised 23 by IRSN. There's nothing as to what Dr. Lyman would 24 add to the record. I basically have nothing else.
25 JUDGE BARATTA: Several times I've heard NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
685 1 reference to the availability of these documents, and 2 I had a couple questions in regards to that. Are 3 these documents in archival databases that are 4 recognized, such as Compendex and Inspec? In other 5 words, if I go to those -- Compendex is the compendium 6 of engineering and scientific articles, such as ANS 7 Nuclear Technology and such. In other words, it's the 8 recognized -- one of the two recognized databases that 9 are usually searched when one starts out a literature 10 search?
11 MS. UTTAL: I don't know, Your Honor.
12 JUDGE BARATTA: Okay. Relating to the 13 availability through ADAMS and also through the Web, 14 are the proceedings of the meetings searchable; that 15 is, can you go and type in a keyword and it will bring 16 you to or do you have to go by author or organization, 17 do you know?
18 MS. UTTAL: Well, the proceeding of the 19 Nuclear Safety Research Conference that I cited in the 20 staff's brief is a NUREG, and it would be found 21 through a search. In fact, I don't recall how I found 22 this particular document but it would be on the web 23 site and be in ADAMS also. The staff's SER is in 24 ADAMS.
25 JUDGE BARATTA: On the M cladding.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
686 1 MS. UTTAL: Beg your pardon?
2 JUDGE BARATTA: Is the staff SER in the M5 3 cladding?
4 MS. UTTAL: In the M cladding. In fact, 5 I provided the Board with copies as a result of the 6 Board's request, and that's a publicly available 7 document that's found in ADAMS. In fact, it's found 8 in ADAMS in a couple of places, it's got several 9 different ML numbers, and that you could get by word 10 search, by MOX, by M5. I mean all those words are in 11 there. I'm sure that the proceedings of the other 12 meetings are available on the web sites. The ACRS 13 transcripts are available at the ACRS portion of the 14 web site, and I believe if you do a word search on the 15 web site for various -- whatever topic you're 16 interested in, MOX or ballooning or fuel, you would 17 find these documents. They can be searched by words.
18 MR. REPKA: Judge Baratta, I would just 19 add to that. We cited one document in our brief which 20 was the very first paper that we know of in which the 21 France presented the results of the VERCORS tests, 22 that was the 1999 NURETH9 meeting paper, and that 23 document, as we said in our papers, was available and 24 would be available at the American Nuclear Society web 25 site, ANS, and certainly would be available to any NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
687 1 expert in the field.
2 JUDGE BARATTA: Thank you.
3 MS. CURRAN: I guess I'll address that in 4 my reply.
5 CHAIR YOUNG: Pardon?
6 MS. CURRAN: I have a comment on that, but 7 I guess I'll wait until my reply.
8 MS. UTTAL: Judge Baratta, just one more 9 thing. The ACRS -- various ACRS transcripts and some 10 other documents can be found on ADAMS by searching the 11 term MOX, and you will come up with all the publicly 12 available documents.
13 JUDGE ELLEMAN: I hope I'm correctly 14 paraphrasing Ms. Curran's earlier comment but I 15 thought I heard her say that sometimes older technical 16 data can combine with new technical data to provide 17 insights that you maybe didn't have earlier or people 18 can present things in different ways that allow you to 19 perceive the significance of them in a different light 20 than what you might have earlier. And I guess-what 21 I'm hearing from both NRC and from Mr. Repka at Duke 22 is that all of those insights and thoughts should have 23 been there at a much earlier time than what they were 24 perceived by BREDL. But on the point, though, that 25 insights can often come well after the basic data have NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
688 1 been made available, would either of you want to offer 2 any further comments or perspectives on that 3 particular point?
4 MR. REPKA: I guess the question becomes 5 is whose insight is it? And, number one, my response 6 is that in October 2003 IRSN really wasn't offering 7 anything that they hadn't offered before in terms of 8 insights. The data was available, and maybe it had 9 not been presented in exactly the same checklist 10 format, but certainly the data and the issues had been 11 presented at the earlier meetings. Beyond that I 12 think really the obligation is at some point is on the 13 Petitioner to say that if there is some new insight to 14 be had, could they have had that insight themselves 15 and put two and two together on the original filing 16 deadline versus the later, and I think that's the 17 burden of the Petitioner, and that's really not what 18 -- that's what's not been met here.
19 Again, IRSN is not presenting anything new 20 in terms of data, information, issue that says, "Ah, 21 that's a new issue." It's just a continuation of the 22 same issue, and we think, certainly, if there was 23 these contentions, given what they are, could have 24 been raised in a timely fashion.
25 CHAIR YOUNG: Just one question on the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.om
689 1 factor relating to the sound record. I understand you 2 to be saying that Dr. Lyman has not provided anything 3 new himself and that this information was available 4 earlier in any event. Looking at the sound record 5 issue purely from the standpoint of the information 6 that whenever it was available is presented in most 7 recently October 2003, could you speak to, and all of 8 you can, and you may be doing this more in your 9 arguments this afternoon, to the question of whether 10 that information is the kind of information that 11 should be included to make a sound record on decisions 12 relating to the use of MOX fuel?
13 MR. REPKA: And the answer to that is, no, 14 it does not need to be included, and we'll get to the 15 specifics of that when we talk about the bases for 16 these various contentions. Beyond that I would say 17 the mere fact that IRSN has a research proposal that's 18 what's being presented here.
19 CHAIR YOUNG: Well, what I wanted you to 20 speak to is all the information that you have been 21 referring to that went into that, that came from 22 earlier studies and tests and so forth.
23 MR. REPKA: Right, and we'll get into why 24 that doesn't create a real issue for what's being 25 proposed here. That's the basis.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
690 1 CHAIR YOUNG: And so you can save that for 2 this afternoon.
3 MR. REPKA: Right, I will save that. And 4 then beyond that I'm just saying that the additional 5 point is to try to make an argument out of that issue 6 one would need to have some expertise in, a, the 7 particular tests, the results of those tests, the test 8 conditions, something about the fuel design, the 9 microstructure, the LOCA analyses themselves which are 10 an issue, and we don't see anything in these proposed 11 late file contentions that would suggest any 12 particular expertise with respect to any of those. We 13 have a broad statement only that Dr. Lyman is an 14 expert.
15 CHAIR YOUNG: Anything to add on the 16 record?
17 MS. UTTAL: I have nothing.
18 CHAIR YOUNG: Okay. Do you want to give 19 a brief reply and then we'll break for lunch.
20 MS. CURRAN: I know I read the quote in 21 many cases that there is an iron clad obligation to 22 review the license application and publicly available 23 documents. It's my understanding, and I don't have 24 these cases in front of me, that the most important 25 part of that iron clad obligation is the application NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
691 1 itself and the correspondence and documents that 2 relate to the application, and we certainly have done 3 that.
4 The question is when you get into the 5 great body of information that's available publicly 6 regarding an issue is an intervenor like BREDL -- is 7 a person whose job is to monitor nuclear safety issues 8 responsible for the entire universe of papers that 9 might have been delivered over the last five years 10 regarding a particular topic? I think you have to 11 apply a certain amount of judgment to this.
12 Certainly, we have to read everything that 13 is in a docket of this application and make sure that 14 we have applied that here in the drafting of 15 contentions, but we're talking about meetings on 16 general topics that took place before this case began, 17 before Dr. Lyman began to work on this case, and 18 there's just a certain limit to what one person can 19 find in the great body of NRC literature.
20 But setting that aside, setting that 21 aside, we have made the case that even -- and Dr.
22 Lyman doesn't remember whether he was at a meeting on 23 a particular day that addressed a particular topic two 24 years ago and shouldn't be required to remember that, 25 and the fact that he might have been at some part of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
692 1 a meeting doesn't establish that he was there and 2 heard it at all. But in any event, I don't think that 3 that requirement is meant to require somebody in his 4 position to remember everything they read, every 5 meeting they went to that might be relevant to this.
6 In this case, there was a very timely, 7 very focused meeting between the NRC staff and the 8 IRSN that had to do with the exact subject matter of 9 this proceeding, and we raised that as quickly as 10 possible after the meeting was held and we could get 11 our hands on official copies of these handouts that 12 were given out. So I think you have to look at that 13 responsibility to review documents in a light of 14 reasonableness.
15 In listening to Mr. Repka's argument, he 16 said several times that the seminal event in the --
17 that's related to the IRSN presentation in October 18 2003 is the testing that was done in 1998 at VERCORS.
19 That's only true with respect to part of that report, 20 and it's only partially true. So the report that was 21 presented in October 2003, the report that is attached 22 to our contention is a report that puts together two 23 pieces of information. One piece of information is 24 about LOCAs and the other information is about severe 25 accidents. The RT2 test and the RT7 test did not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
693 1 relate to LOCAs, they're totally unrelated. So if you 2 look at the handouts, there's some pages that are 3 devoted only to severe accidents. Now, that aspect of 4 the presentation does relate back to the VERCORs 5 tests, but, as we submit, there is additional 6 information, additional understanding that the 7 presenters brought to bear on that data. It wasn't 8 just the presentation of the data, it was additional 9 understanding of phenomenology of severe accidents as 10 it relates to plutonium fuel that's presented on Page 11 6 of the viewgraphs. That's the severe accident 12 summary on the viewgraphs.
13 Now, the pages that relate to the LOCAs 14 come after that, and they are completely unrelated to 15 the VERCORS tests. The VERCORS tests didn't show 16 anything about LOCAs and Mr. Repka said that himself.
17 It's a completely different set of information. That 18 just needs to be clarified.
19 I think -- I can't remember which attorney 20 argued but someone argued that there was significant 21 information available on M5 cladding in an NRC topical 22 report from the year 2000 that, I guess, they're 23 arguing we should have been able to use that 24 information and prepare a timely contention. But it's 25 important to recognize here that whereas there may NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
694 1 have been work done on the M5 cladding, there are two 2 factors that have to be borne in mind. First of all, 3 there was additional work done on the M5 cladding in 4 2002 and maybe 2003, which is listed in the list of 5 reference documents to the IRSN viewgraphs.
6 But also very important any work that may 7 have been done on M5 cladding in 2000 would not have 8 addressed the issue of fuel relocation in a LOCA 9 because that issue had been dropped by the NRC staff.
10 That was Generic Safety Issue-92, which was looked at 11 and then -- it was looked at and I think it was in 12 1998 it was dropped. So whether or not there's been 13 some research on MS cladding with respect to -- strike 14 what I just said, that sentence I just started. So 15 the NRC safety approval would not have addressed 16 ballooning as a result of fuel relocation -- no, I'm 17 sorry, that's wrong too.
18 CHAIR YOUNG: Would it be simpler to just 19 have Dr. Lyman say what it did not address?
20 DR. LYMAN: Simply, one of the issues that 21 we raised, which was the relationship between the 22 ballooning properties of advanced cladding and the 23 impact on fuel relocation during LOCA, was not 24 addressed in the NRC staff safety evaluation of M5 25 cladding, because there is no requirement right now in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005.3701 www.neafrgross.com
695 1 regulations to evaluate fuel relocation, partly 2 because the issue was dropped, which turns out to be 3 erroneously in 1999. So some of the issues that we 4 are raising would not have been evaluated in the 5 context of that approval.
6 MR. REPKA: Judge Young, may we respond to 7 that point?
8 CHAIR YOUNG: Yes, but let her finish and 9 let's try to wrap up both the reply, and then we'll 10 give you a minute to respond just to that point. I 11 know we're going to get into some of these things 12 again this afternoon, so to the degree that we can 13 avoid duplication, let's do that too.
14 MS. CURRAN: Okay. I'd just like to make 15 one or two more points. First of all, some arguments 16 have been made that BREDL doesn't have the ability to 17 contribute to the development of a sound record or 18 hasn't made a strong enough showing on that because we 19 haven't submitted the summary or details of Dr.
20 Lyman's testimony, but I think it was interesting that 21 at a couple instances in the argument made by Duke and 22 the NRC staff it was stated that some of this 23 information that the staff and Duke think we should 24 have been able to raise a timely contention on is 25 proprietary or not available to us. For instance, the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
696 1 reference documents in the IRSN viewgraphs from 2 October 23 appear to be, at least some of them, 3 private papers to which we may have no access. Some 4 of the information that Duke referred to is S proprietary information. That is information that we 6 would have to get access to in the course of 7 discovery. There's a certain amount of development of 8 a case here that's required, and I don't think Dr.
9 Lyman should be basically asked to go off half-cocked 10 without seeing what the record actually is on what he 11 should base his testimony.
12 CHAIR YOUNG: Do you want to address the 13 expertise issue that I think Mr. Repka raised?
14 MS. CURRAN: Well, plutonium fuel and its 15 characteristics and behavior under accident conditions 16 is something that Dr. Lyman has been studying for 17 years, and we believe that he is eminently qualified 18 by training, by experience to address these issues in 19 testimony. This is part of the work that he does, 20 that he has spent quite a bit of time on and has a 21 great deal of general knowledge and experience with.
22 So he seems to us to be a particularly well qualified 23 person to testify on these issues.
24 I guess Mr. Repka made an argument that if 25 Dr. Lyman was so qualified, why wasn't he aware of all NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
697 1 the various papers that have been presented and their 2 details. But I think you have to bear in mind that 3 Dr. Lyman is one of a handful of public interest 4 scientist whose job is to monitor nuclear safety 5 issues as they relate to the whole spectrum of what 6 goes on in the United States, and to say that he 7 should be familiar with every single paper that's been 8 written on a continuing basis is just, I think, asking 9 a very unreasonable -- putting into a very 10 unreasonable standard. And, certainly, some of these 11 papers that are referenced in the IRSN viewgraphs are 12 papers that were delivered at closed meetings, they're 13 not public papers, they're not things to which Dr.
14 Lyman would have easy access. ANS papers fall under 15 the same category. One has to pay for them. Dr.
16 Lyman works for a public interest organization. He 17 doesn't have enormous resources at his disposal to buy 18 every paper that' s been written about a subject that's 19 of interest to him.
20 I just want to make one more comment about 21 the development of a sound record. It seems to me 22 that there isn't any criterion in this late filing 23 standard that specifically addresses the significance 24 of the safety issues involved, which is different 25 from, say, the standard for reopening the record. But NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
698 1 perhaps the standard development of a sound record 2 comes close to that because really what the Licensing 3 Board needs to do is provide an assurance that 4 legitimately contested issues will be resolved before 5 a licensing action goes ahead. And we think we've 6 made a strong case that there are significant 7 questions that have not been addressed about the 8 safety of using plutonium fuel in this reactor and 9 that deserve to be addressed. We have come forward 10 with the expertise needed to investigate the issue 11 further and provide testimony and provide further 12 insight into this, and I think that should also be 13 weighed in the Board's consideration, the gravity of 14 the issues that are raised. That's all I have. Thank 15 you.
16 CHAIR YOUNG: One minute.
17 MR. REPKA: We just wanted to respond to 18 the one technical point about what was or was not in 19 the Framatome topical report and the NRC's safety 20 evaluation report, and we just wanted to say that 21 ballooning is something that is addressed in there 22 with respect to the M cladding, and then ballooning 23 is also addressed in a LOCA analysis which would be 24 referenced in Duke's application.
25 DR. LYMAN: I'm sorry, but the point I was NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
. . 234-4433 (202) WASHINGTON. D.C. 20005-3701 www.nealrgross.com
699 1 making was ballooning and fuel relocation is not an 2 issue that is currently considered in Appendix K.
3 That is the issue.
4 CHAIR YOUNG: All right. We can go one of 5 two ways, at least, and I want to ask all of you a 6 question now. We could take a shorter lunchtime and 7 come back and go through the contentions, the 8 arguments on the four contentions, or if the counsel 9 think that taking a more normal lunch hour would 10 enable you to make your arguments more concise, we 11 could go that way. I don't know whether that's 12 possible. It may be that it's better to just take the 13 short lunch hour, come back here at one and try to 14 make sure we have as much time as possible. Are there 15 any preferences or do any of you want to speak to 16 that, any of the three counsel?
17 MR. REPKA: We vote for the shorter lunch 18 break.
19 CHAIR YOUNG: Ms. Uttal, Mr. Fernandez?
20 MR. FERNANDEZ: That's fine with us.
21 MS. UTTAIf: Just give me one moment.
22 CHAIR YOUNG: Because we are going to keep 23 you to time. We're going to be cutting you off this 24 afternoon, because we are going to finish at five 25 o'clock. They are going to kick us out if we don't.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
700 1 And then I guess I have a third question and that is 2 unless all of you are agreed that any one or more of 3 these four contentions are going to take significantly 4 longer, we would be probably inclined to just divide 5 up the time equally.
6 MS. CURRAN: Judge Young, BREDL would like 7 to take the full hour lunch break, partly because we 8 have logistical reasons for needing an hour, but I 9 also want to suggest that in our view the contentions 10 that require the most discussion and explanation are 11 the contentions that relate to the IRSN presentation, 12 Contentions 10, 11 and 12. I can't remember if that's 13 it or maybe there's one more. But the NEPA contention 14 relating to transport of plutonium fuel, if time for 15 that had to be reduced significantly, my feeling is 16 that we've made our case adequately on the papers and 17 that there's not much more that needs to be said 18 there. I would like to focus the time on these more 19 complicated contentions that have to do with plutonium 20 fuel characteristics.
21 CHAIR YOUNG: All right. We'll 22 compromise. Come back at 1:15 and we will have a 23 schedule for you at that time so that you'll be able 24 -- everybody will be able to synchronize your watches 25 and follow the time.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
701 1 (Whereupon, the foregoing matter went off 2 the record at 12:21 p.m. and went back on 3 the record at 1:24 p.m.)
4 CHAIR YOUNG: I guess we can go back on 5 the record. Yes, let's do.
6 If we started at 1:30, let each party have 7 15 minutes -- BREDL 15 minutes, Duke 15 minutes, Staff 8 15 minutes -- and then BREDL rebuttal 15 more minutes, 9 we could do the first three in three hours, and the 10 last, if we let each person -- each party have seven 11 minutes, with seven-minute rebuttal, so there would be 12 equal times on each side -- let me just make sure this 13 is not the office. Yes, it is. Let's go off the 14 record for a minute.
15 (Whereupon, the proceedings in the 16 foregoing matter went off the record at 17 1:25 p.m. and went back on the record at 18 1:27 p.m.)
19 JUDGE BARATTA: Do you want to go on the 20 record or not?
21 CHAIR YOUNG: Yes, let's go on the record.
22 JUDGE BARATTA: Okay. I have a question 23 that -- it was a call concerning storage and such.
24 The two plans for -- yes, I want to say NSF, but it's 25 not -- NFS and BWX Technology -- those are classified NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
702 1 at a level that would be consistent with an 2 L clearance, is that not correct?
3 MR. FERNANDEZ: That's correct.
4 JUDGE BARATTA: Okay. Thank you. That 5 was -- actually, that was the two questions --
6 CHAIR YOUNG: Okay.
7 JUDGE BARATTA: -- about each one. Thank 8 you.
9 CHAIR YOUNG: Anything else before we go 10 on into the argument on the four remaining -- four 11 contentions under the regular admissibility criteria?
12 All right. Then, we're going to stick to 13 these 15 minutes and maybe a little less, if we're 14 going to take any break at all today. We will try to 15 -- I think it might be a good idea for us, if we know 16 we have questions, ask them at the beginning, and we 17 have to feel free to interrupt. Otherwise, they're 18 not going to make their -- they're not going to be 19 able to fit into their 15 minutes.
20 So if you're talking about something that 21 -- something occurs to us that we want to ask, just 22 pardon us in advance. We may be interrupting.
23 MS. CURRAN: We're here to answer your 24 questions.
25 CHAIR YOUNG: We'll give you -- try to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
703 1 give you a five-minute warning. So with no further 2 ado, Ms. Curran, on Contention 10.
3 MS. CURRAN: Okay. Well, I'd like to 4 start with Duke. And there's a couple arguments that 5 Duke makes, starting on page 10 and going on to 6 page 11, that really relate to Contention 11, because 7 they have to do with the VERCOR's tests, which were 8 severe accident tests, and that's what is the subject 9 of Contention 11.
10 And that may have been in part because we 11 made a misleading reference in the wrong contention to 12 the severe accident analysis. So it makes sense to 13 just postpone the discussion of those couple arguments 14 until we get to Contention 11.
15 Okay. The first argument that is relevant 16 to Contention 10 appears on page 11 of Duke's 17 response. The argument is BREDL suggests that IRSN 18 supports a conclusion that fuel relocation would 19 affect a LOCA design basis analysis, and Duke argues 20 that the IRS sides do not make such a finding.
21 I think you just have to look at the IRS 22 and slides and judge for yourselves what they say.
23 They show a problem. They don't suggest that this 24 might be the case. They describe a concrete problem 25 that there are -- there is information about the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
704 1 characteristics of the cladding and fuel in a LOCA 2 accident that shows that this poses a risk that was 3 previously not considered. So it's just simply not 4 correct to say that IRSN merely speculates.
5 I also want to point out that at pages 2 6 to 3 of the contention, where the contention discusses 7 the increases in peak clad temperature, which were 8 stated at the meeting, the October 23rd meeting, to be 9 100 degrees Centigrade higher, clad oxidation stated 10 at the meeting to be a.five to 10 percent increase in 11 the oxide layer, and clad hydrogen uptake -- these 12 were all assertions that were made at the meeting by 13 the presenters of the information.
14 This is concrete information showing 15 different increases in adverse conditions, and this is 16 attested to by Dr. Lyman, who supports the contention.
17 The contention is based on what he heard at this 18 meeting.
19 Okay. Then Duke says that --
20 JUDGE BARATTA: Could I interrupt?
21 MS. CURRAN: Oh, sure.
22 JUDGE BARATTA: I apologize for 23 interrupting. You said what he heard. In other 24 words, it is not -- it is information that was not on 25 the slide that was made -- given during the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 -
www.nealrgross.com
705 1 presentation. Is that what --
2 MS. CURRAN: Yes. The information about 3 the 100 degrees higher temperature and the five to 10 4 percent increase in the oxide layer and clad hydrogen 5 uptake, I don't believe that's on the slides 6 themselves. That was described in the meeting.
7 JUDGE BARATTA: Thank you.
8 MS. CURRAN: Then, Duke argues at page 11 9 that fuel relocation during a LOCA is not a new issue.
10 It was raised in Generic Safety Issue 92, which was 11 dropped on the basis that there was insufficient risk-12 based justification for starting a major rereview.
13 Okay. And that is the issue I had 14 mentioned a few times earlier that I wanted to get 15 back to. Yes, it was dropped. It was dropped in 16 1998, but the Staff has since reconsidered that 17 perhaps it should not have been dropped. And I would 18 like to pass out some documents that reflect that.
19 Okay. These are three -- I'd like to 20 identify these three documents for the record. The 21 first is a February 8, 2001, memorandum from Ralph 22 Meyer, M-E-Y-E-R, Senior Technical Advisor, Safety 23 Margins and Systems Analysis Branch, Division of 24 Systems Analysis and Regulatory Effectiveness, Office 25 of Nuclear Regulatory Research. The subject is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
706 1 "Update on Generic Issue 92: Fuel Crumbling During 2 LOCA."
3 And I included this one because it's the 4 most succinct summary of the issue, where Mr. Meyer 5 says that in his view there has been an error in the 6 dropping of Generic Safety Issue 92.
7 The second document is a June 20, 2002, 8 memorandum from Ashok, A-S-H-O-K, C. Thadani, T-H-A-D-9 A-N-I, Director of the Office of Nuclear Regulatory 10 Research, to Samuel J. Collins, Director of Office of 11 Nuclear Reactor Regulation,
Subject:
Research 12 Information Letter 0202, Revision of 10 CFR 50.46 and 13 Appendix K.
14 If you turn to page 3 of this memorandum, 15 it describes a recommendation by -- in a SECY paper 16 for an assessment of recognized non-conservatisms 17 associated with Appendix K. And one of these relates 18 to fuel relocation following cladding swelling during 19 a temperature transient. And it refers to an 20 Attachment 4, which is the third document that's 21 attached here.
22 And Attachment 4 goes into more detail 23 regarding the subject of fuel relocation. And I just 24 refer you to the discussion on page 5.
25 MR. FERNANDEZ: Your Honor?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
707 1 CHAIR YOUNG: Yes.
2 MR. FERNANDEZ: We don't have a copy of 3 that yet. We got a copy of --
4 MS. CURRAN: Oh, you don't?
5 MR. FERNANDEZ: No.
6 MS. CURRAN: Oh, I'm sorry. Let me --
7 MR. FERNANDEZ: That's okay.
a MS. CURRAN: -- give you one.
9 CHAIR YOUNG: Also, I'm going to give you 10 your five-minute warning.
11 MS. CURRAN: Okay. Well, at any rate, 12 this is just to say thatifuel relocation is an issue 13 with respect to uranium fuel. The Staff is 14 reconsidering having dropped it, and now it seems to 15 be back on the radar screen. And it's an even more 16 significant issue for plutonium fuel, because of the 17 higher energy level.
18 Okay. On page 13, Duke asserts that 19 substantial testing and evaluation of M5 cladding has 20 been previously conducted. But a couple of points 21 about that. First, it was unirradiated cladding, and 22 what's being suggested here is testing of irradiated 23 cladding. I'm not sure of that, so I think I'll ask 24 to strike that.
25 The most important point is when the NRC NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neargross.com
708 1 approved the M5 cladding they did not do -- they were 2 not looking at the issue of fuel relocation because 3 Generic Safety Issue 92 had been dropped. And these 4 things need to be looked at together. That's the 5 point of the -- one of the points of the IRSN 6 presentation.
7 Okay. There's no indication -- according 8 to Duke there's no indication that the ballooning 9 problem could lead to an unacceptable loss of core 10 coolable geometry. I think you have to look at the 11 document, and you can judge for yourself, from the 12 IRSN presentation, the weight of the information 13 that's presented there. It's actual information. It 14 is not just mere speculation.
15 CHAIR YOUNG: With regard to that -- and 16 I'm going to skip to the end and come back, but just 17 quickly -- the last thing that Duke argues on page 15, 18 to counter your argument that integral LOCA MOX fuel 19 bundle tests -- that the application should be denied 20 until these tests are done would cause delay, and 21 talks about the chicken and egg problem of needing to 22 have actual irradiated fuel to conduct the test, could 23 you respond to that?
24 MS. CURRAN: Well, these tests could be 25 done in other reactors in France that are already NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
709 1 licensed. There's no reason that that couldn't be 2 done--
3 CHAIR YOUNG: Okay.
4 MS. CURRAN: -- because the French are 5 proposing to do it at the Phebus reactor.
6 CHAIR YOUNG: Okay.
7 MS. CURRAN: But just in terms of -- it 8 raises the other issue that Duke has been pressing 9 here, which is there is a big hurry to get this 10 approval, because there are so many things that would 11 go wrong if it weren't issued right away. For one 12 thing, that this international agreement will 13 collapse.
14 Well, the U.S. State Department has not 15 renewed the agreement with the Russians. Right now, 16 the agreement has lapsed, so there is no international 17 agreement that has to be protected at the moment.
18 And, second, the reason for the hurry to 19 get the fuel to the Cadarache plant in France is that 20 that plant is due -- would have been shut down 21 already, and is due to be shut down, because it's not 22 seismically qualified. So there's --
23 CHAIR YOUNG: Actually, there's a question 24 about that, and it may wait til Duke. But since 25 there's a separate export license proceeding, that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
. . 234-4433 (202) WASHINGTON, D.C. 20005-3701 www.neaIrgross.com
710 1 might be something that parties could address in terms 2 of the relationship between the fuel fabrication and 3 the lead test assembly amendment. Go ahead and 4 just --
5 MS. CURRAN: I think just the bottom line 6 here is that there is other ways to do this, and that 7 some of the reasons that have been given to rush to do 8 it at this place and this timeframe are questionable 9 in our view.
10 CHAIR YOUNG: Mr. Repka?
11 MR. REPKA: Let me start at the beginning 12 on this particular contention, and then I want to come 13 back to that schedule issue.
14 CHAIR YOUNG: Okay.
15 MR. REPKA: First, turning to exactly what 16 this contention is, as modified this morning, I think 17 BREDL has made it very clear that the contention 18 focuses not on severe accidents but on LOCA and LOCA 19 analysis. So the postulate is that there will be 20 relocation at LOCA temperatures leading to blockage, 21 leading to problems with respect to the conservatism 22 of the Appendix K LOCA analysis. So, clearly, that's 23 the issue.
24 Now, the question before us is, is there 25 any basis offered with this contention for that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
711 1 particular scenario? And the first point we made in 2 our filing, the first couple f points, remain 3 perfectly applicable, which is the contention is based 4 fundamentally on the IRSN presentation and the IRSN 5 data, which is the VERCOR's test, which is a severe 6 accident test, which shows fuel relocation at 7 temperatures at about 3,900 degrees Fahrenheit up to 8 about 4,800 degrees Fahrenheit -- far in excess of 9 LOCA conditions.
10 So the IRSN presentation does not directly 11 address or support a concern that there will be fuel 12 relocation at LOCA temperatures. That's number one.
13 CHAIR YOUNG: But it raises the question, 14 doesn't it?
15 MR. REPKA: It raises the question because 16 they would like to research that issue, but it does 17 not have any specific basis for saying that that 18 effect would occur. So that's the point I'm making.
19 There is no test that says this phenomena will occur 20 at LOCA temperatures. There are tests that only show 21 fuel relocation at temperatures far, far in excess of 22 LOCA temperatures.
23 So, then, the next question becomes is, 24 what is the basis for asserting such effects? It 25 boils down to, on page 4 of the contention, is this NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neaIrgross.com
712 1 hearsay statement that IRSN said at the meeting that 2 the parameters could increase peak clad temperature 3 stated at the meeting to be 100 degrees Centigrade 4 higher, and so on and so forth.
5 Those statements are not on the slides.
6 That's hearsay. BREDL does not offer any of its own 7 tests or any of its own evidence to support those 8 statements, so it's entirely a hearsay assertion based 9 upon what was purportedly said at the meeting.
10 CHAIR YOUNG: You're not arguing that we 11 should start applying the Rules of Evidence now, are 12 you?
13 MR. REPKA: No. But I think what you need 14 to apply is the rule of, is there a basis for the 15 contention that this is going to happen? And when you 16 look at what's been presented, you have an IRSN slide 17 show, and plus this statement of what IRSN said, and 18 that's it.
19 And what I'm saying is the slide show 20 doesn't make these statements, and we have nothing but 21 hearsay to say that they -- that it would have this 22 effect. That's insufficient basis, in my estimation, 23 particularly given that it's very clear that the IRSN 24 presentation relates -- does not relate to any testing 25 at LOCA temperatures.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
713 1 So there can be no test data to support 2 these hearsay conclusions, and there are no test data 3 to support those conclusions.
4 In fact -- we'll get to this in the severe 5 accident test -- that the VERCOR's tests themselves 6 included at least two tests, one of which didn't show 7 the fuel location at the lower, albeit almost 4,000 8 degrees, temperature than the RT2 test did. So we 9 really don't have anything there.
10 Now--
11 JUDGE BARATTA: Can I interrupt you and 12 ask a question?
13 MR. REPKA: Sure.
14 JUDGE BARATTA: It seems that fundamental 15 to your argument is the adequacy of the database, and 16 that there's a dispute over what the database may say 17 in one regard, but also a dispute over is the database 18 adequate enough so that there's reasonable certainty 19 that we're able to predict the behavior of this fuel 20 in Catawba or some other reactor. Is that --
21 MR. REPKA: I think that's a fair 22 statement. The assertion of the contention is that 23 there is a gap in the experimental database, and that 24 gap undermines its reasonable assurance. I think 25 that's a fair statement of what the contention says.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
714 1 JUDGE BARATTA: And it really deals with 2 the MOX properties I guess is the -- what the database 3 does -- is lacking in. Is that also a reasonable 4 statement? In other words, that's the database we're 5 looking at, the MOX properties under operating 6 conditions or accident conditions.
7 MR. REPKA: Presumably, that's what 8 they're referring to.
9 JUDGE BARATTA: And the last question I 10 wanted to ask was that your statement concerned the 11 actual experimental data that was obtained from these 12 tests. And I guess the question -- I don't know where 13 this statement came from, the 100 degrees and such, 14 other than what Dr. Lyman has asserted. And I have no 15 reason to dispute that.
16 But I guess is it possible that it could 17 have been a conclusion -- an extrapolation from the 18 data that was given at the -- by the researchers, not 19 by Dr. Lyman, by the researchers based on their tests?
20 MR. REPKA: Again, it couldn't be an 21 extrapolation based on the tests that they did, 22 because the tests are completely -- the tests were for 23 the purposes of assessing source term releases at 24 severe accident conditions. And there's no way to 25 extrapolate that particular conclusion about peak clad NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
715 1 temperature from those tests.
2 Why they said what they said, or if they 3 said what they said, is something that we can't 4 verify. But there is certainly no testing in the IRSN 5 presentation from which you could extrapolate that as 6 a conclusion.
7 Now, having agreed that the contention is 8 one of -- is an assertion that the database is 9 insufficient to undermine a reasonable assurance 10 finding. We believe that that contention needs to be 11 looked at in context here, and that's why we cited 12 many of the factors that we did, number one which of 13 course would be the substantial database and operating 14 history with MOX fuel, the fact that the regulators 15 themselves in France haven't seen this -- the 16 possibility of these changes in peak clad temperatures 17 or other effects during a LOCA analysis as sufficient 18 to make them take any regulatory action with respect 19 to this issue at LOCA temperatures.
20 I think those are equally significant to 21 this hearsay statement to assessing whether there's 22 any basis for a real concern on this point.
23 CHAIR YOUNG: But isn't there a dispute, 24 and aren't you really sort of getting to the merits 25 there?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
716 1 MR. REPKA: No. I think it's really a 2 question of assessing the basis. And here again, 3 we're -- the contention takes severe accident testing 4 and is saying there's a concern at LOCA temperatures.
5 And our point is: what's the basis for that concern?
6 What's the basis for concluding that there is a real 7 issue at LOCA temperatures, and we don't see that.
8 And, in fact, what we see is -- is substantial 9 evidence that suggests just the opposite.
10 Now, an additional point on that is, of 11 course, that the Generic Safety Issue which related to 12 the hypothetical possibility of fuel relocation at 13 LOCA temperatures was dropped by the NRC as of 14 insignificant -- of not sufficient significance. That 15 remains the NRC's official position on that issue.
16 Counsel handed out this morning a couple 17 of items that are intended to undercut that 18 conclusion. I wanted to respond to those.
19 With respect to the February 8, 2001, 20 letter, that reflects the opinion of one individual.
21 It doesn't reflect the position of the NRC Staff.
22 With respect to the June 20, 2002, 23 memorandum, this I think raises a very important 24 point. The possibility of fuel relocation at LOCA 25 temperatures is not a new issue, as we said. It's not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
717 1 -- it was raised in GSI 92. It's been raised in other 2 contexts, o it's not a new issue.
3 This further confirms I think the point we 4 made this morning about good cause, but beyond that 5 the -- the fact of that issue is that in the 6 Appendix K model and the LOCA modeling there are 7 substantial margins and substantial conservatisms, 8 including things related to the heat transferability 9 and what would happen with relocation.
10 And without getting into the merits, but 11 just to explain what's going on here, the assumption 12 has always been, based upon the experimental record 13 and other factors, is that there is sufficient 14 conservatism in the Appendix K model.
15 What Mr. Thadani is saying in this 16 June 20, 2002, memorandum, this relates to the NRC's 17 ongoing look at revising Appendix K as part of its 18 risk-informing improvement of the regulatory process.
19 And in that context he explains that if -- if the NRC 20 were to undertake a reanalysis/revision of Appendix K, 21 one of the things that they would --
22 CHAIR YOUNG: Can you point us where?
23 MR. REPKA: On page 2 of the cover memo, 24 the last full paragraph on the page begins, "As known 25 conservatism is removed from Appendix K, there is the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
718 1 possibility that overall results produced by the 2 revised Appendix K evaluation models might become non-3 conservative."
4 And what he's referring to and goes on to 5 refer to here is that fuel relocation at LOCA 6 temperatures is one of those things that would need to 7 be looked at. As you remove margin, you need to look 8 at this issue. But under the current Appendix K, 9 which is what this particular application is being 10 subjected to, there is sufficient margin. There is no 11 margin in Appendix K that's being removed.
12 So the fact that Mr. Thadani said this is 13 not to say that there is an issue now. It's to say 14 that if we were to apply something other than 15 Appendix K this is a factor we would need to look at.
16 So this particular memorandum is 17 completely inapposite in establishing a current issue 18 with respect to licensing under the current 19 Appendix K.
20 CHAIR YOUNG: You've got five minutes.
21 MR. REPKA: The next thing I wanted to 22 respond to was the statement related to -- there is 23 some discussion again of the effects of M5 cladding, 24 whether this could exacerbate fuel relocation at LOCA 25 temperatures.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neargross.com
719 1 Again, we've talked about the fact earlier 2 that substantial information is available on M5 3 cladding. It has been reviewed and approved by the 4 NRC. It has been used in reactors, both in Europe and 5 domestically.
6 The important point that -- the 7 speculation in this contention is that M cladding 8 might result in bigger balloons because of increased 9 ductility. However, if one really looks at the 10 documents on M cladding, you would find that the 11 bounding state of the M cladding is the unirradiated 12 state, maximum ductility.
13 And as it's irradiated, the ductility 14 actually decreases. And although its ductility may be 15 greater than other zircalloy claddings once it has 16 been irradiated, its ductility, and, therefore, the 17 potential for ballooning, is less than in the 18 unirradiated state.
19 And I say that all as background because 20 the point is in the LOCA analyses and in the approvals 21 of MS cladding it's the unirradiated state that's 22 used. So there's -- the effect of MS cladding 23 relative to other clad designs is already bounded in 24 the LOCA analysis and in the approved MS cladding 25 design.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.neatrgross.com
720 1 So this is -- to say that there's some 2 further effect related to the cladding and some 3 increased ballooning is -- number one, it's just 4 wrong. And, number two, it's blatantly speculative, 5 because, again, there is no data that supports that 6 conclusion.
7 Then, the next point to make about that is 8 in a LOCA analysis -- again, even if there is some 9 ballooning effect, that is modeled in a LOCA analysis.
10 And there has been no showing in this contention, no 11 basis for any assertion that the LOCA analysis results 12 would be any different, that this speculative concern 13 about LOCA heating leading to an uncontrolled core 14 melt is entirely speculation. It's entirely an 15 assertion and a contention.
16 There is nothing in the IRSN report that 17 says that. They didn't look at that issue. So if 18 that's the basis for the contention, there is none.
19 And if it's because Dr. Lyman says that's going to 20 happen, he hasn't provided any basis for that, where 21 I think the particular expertise in LOCA analysis he 22 would need to support such an assertion in order to 23 say there's a legitimate dispute on that point.
24 CHAIR YOUNG: You're just about to 15 25 minutes. Now sometimes the Staff doesn't take as much NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
721 1 time, so if you want to --
2 MR. REPKA: I don't think I really have a 3 whole lot more to say. I think the bottom line is on 4 this -- this particular contention, like the others, 5 based on the IRSN presentation, is that that 6 presentation is, quite frankly, being oversold. It's 7 being presented as something that it's not.
8 It is -- as we discussed before, it's a 9 research proposal. It's something that the French 10 regulators haven't seen fit to take any particular 11 with respect to MOX fuel. And, again, it relates to 12 a fundamentally different issue, which is the severe 13 accident releases, than what this particular 14 Contention 10 relates to, which is LOCA effects.
15 If you'll give me 15 seconds, I just want 16 to consult and see if there's anything more to say.
17 CHAIR YOUNG: Well, I think the Staff said 18 they'd cede you some time, so you're welcome to use 19 it.
20 MR. REPKA: Yes. Mr. Nesbit reminds me I 21 should say something about the point about schedule 22 and--
23 CHAIR YOUNG: Thank you. Yes. I was --
24 MR. REPKA: Again, the international 25 agreement on plutonium disposition does remain in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
722 1 effect. It's a 2001 agreement. The schedule for this 2 particular amendment is tied very much to the export 3 license application, and it's tied to the closure of 4 Cadarache.
5 Now, obviously, the seismic design of 6 Cadarache isn't an issue before us here today. That's 7 something for the French regulators, and they have 8 undertaken to manufacture this fuel as, in effect, the 9 last fabrication at Cadarache, and --
10 CHAIR YOUNG: But what my question is 11 really directed toward is if the export license is 12 proceeding as it is along a separate path, and that 13 can go into effect without -- separately and apart 14 from anything that happens in this proceeding, so I'm 15 not following how --
16 MR. REPKA: Okay.
17 CHAIR YOUNG: -- we are tied in our timing 18 to the -- what happens in the export license 19 proceeding.
20 MR. REPKA: I understand. That's a good 21 question. And there is a tie, and let me try to 22 explain it. And it's particularly -- this is 23 something that's particularly important to the 24 Department of Energy.
25 The tie is this -- the fuel needs to be NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
723 1 manufactured by a particular date and shipped back in 2 order to support: a) the closure of Cadarache, and 3 b) the use at Catawba in the spring. The shipping --
4 CHAIR YOUNG: Is it just that they don't 5 want --
6 MR. REPKA: -- the export --
7 CHAIR YOUNG: -- to do it unless they're 8 sure we're going to --
9 MR. REPKA: That's the issue. The export 10 is due in August. To meet that schedule they need --
11 the Department of Energy needs to export the feed 12 material by August of '03. If they do not want to do 13 that, if they don't have assurance that we -- Duke --
14 will have the lead assembly application, because they 15 do not want to arbitrarily ship the material.
16 CHAIR YOUNG: And what date in August are 17 you talking about?
18 MR. REPKA: I think the date is just 19 August, and the actual -- yes, Mr. Nesbit points out 20 the actual shipment date is classified.
21 CHAIR YOUNG: Anything further?
22 Okay. Now, the Staff has five minutes.
23 (Laughter.)
24 MS. UTTAL: Well, I don't even think I'll 25 fill the five minutes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
724 1 Regarding this June 20th memo from 2 Thadani, I think that Mr. Repka was essentially right.
3 The Staff was talking about possible amendment to 4 50.46 and Appendix K, in order to remove some known 5 conservatisms. And if they remove the conservatisms, 6 then they would have to watch for the non-7 conservatisms. But the rule was not changed, and the 8 Appendix was not changed, and the conservatisms still 9 exist. And so that the rule was the same, and nothing 10 has changed.
11 Regarding the database on relocation, 12 there is a large database on relocation as it relates 13 to LEU fuel. It is not a new topic. It has been 14 discussed with the Staff and with the industry. So 15 there is a large database out there regarding 16 relocation.
17 That's all I have.
18 JUDGE BARATTA: Yes. I just wanted to 19 clarify who Ralph Meyer is.
20 MS. UTTAL: Ralph Meyer is in Research.
21 Yes, he's in RES. He's the Senior Advisory.
22 JUDGE BARATTA: Do you know what his 23 specialty is?
24 MS. UTTAL: I believe it's fuel, but I'm 25 not -- do you --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
725 1 MR. AKSTULEWICZ: Yes. He's the Agency's 2 senior-level advisor on fuels.
3 JUDGE BARATTA: Okay. So while it's true 4 that the memo expresses his opinion, then his 5 expertise, though, is in that area, so --
6 MS. UTTAL: Yes, it is. And I believe --
7 I don't know what's going to happen with GI-92. But 8 as indicated by the memo, they're waiting for the 9 results from the Halden experiment.
10 JUDGE BARATTA: Thank you for clarifying 11 that.
12 CHAIR YOUNG: I was mistaken before. I 13 was reading the clock backwards. You have a few more 14 minutes, if you want to take them.
15 Do you have any questions?
16 MS. UTTAL: I know a few songs.
17 (Laughter.)
18 CHAIR YOUNG: If you're finished, then 19 we'll go back to you. And we're going to start your 20 15 minutes now, so we can maybe take a break at some 21 point, after the next contention maybe.
22 Do you want to ask your question first?
23 Maybe she can --
24 JUDGE ELLEMAN: Well, yes. Why don't I 25 get my question in now. At our request, NRC Staff and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
726 1 Duke supplied us with a list of references pertaining 2 to MOX fuel performance. And at least one of those 3 references strongly reinforces that the radiation 4 behavior of MOX is very dependent on the 5 microstructure of that fuel.
6 If the plutonium. oxide is not well 7 dispersed, the fission products build up, are easily 8 released. If it is well dispersed, it behaves a lot 9 differently. Have you looked at all at how well the 10 MOX planned for the Catawba burn corresponds with the 11 microstructure of the MOX that was used in the French 12 test?
13 MS. CURRAN: Okay. Duke says that the 14 specs for the Catawba fuel will be identical to the 15 European fuel, except for the amount of plutonium in 16 the clusters, which is smaller because the amount of 17 plutonium 239 is greater. Is that --
18 JUDGE ELLEMAN: The clusters are smaller 19 because the U-239 --
20 MS. CURRAN: Well, the amount of plutonium 21 -- the total amount of plutonium in the clusters is 22 smaller, because the amount of plutonium 239 is 23 greater.
24 JUDGE ELLEMAN: Okay. Right off hand, 25 those seem in opposition to -- maybe I'm not NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
727 1 following, then.
2 MS. CURRAN: The amount of fissile 3 plutonium is held constant.
4 JUDGE BARATTA: You're saying because this 5 is weapons-grade material the other -- the even 6 isotopes predominantly are greatly reduced --
7 MS. CURRAN: Yes.
8 JUDGE BARATTA: -- in the -- this material 9 vice the reactor material, which would have a higher 10 percentage, if you like, of-the even isotopes. So as 11 a result, the amount of plutonium goes down, but the 12 amount of plutonium 239 is constant in both cases.
13 It's because you've got the other isotopes, etcetera.
14 JUDGE ELLEMAN: But you are saying that 15 the fuel characteristics planned for Catawba are quite 16 similar to the fuel characteristics or the 17 experimental studies carried out by the French.
18 MS. CURRAN: Yes, because it's the same 19 process.
20 Okay. I think it's really important to 21 disperse the clouds of confusion that Mr. Repka keeps 22 casting over this Contention 10, and also the IRSN 23 viewgraphs. And I don't know how I can cut through 24 this. But anyway, it's very clear to me when you look 25 at the viewgraphs there are two sections. One section NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
728 1 relates to severe accidents. That section in turn 2 relates back to the RT2 test and the RT7 test.
3 The other section relates to LOCAs, which 4 has absolutely nothing to do with those severe 5 accident tests. Nothing. And there is a great deal 6 of information that is available regarding the 7 characteristics of the cladding and the fuel in a 8 LOCA, and that is what the LOCA section of this IRSN 9 presentation refers to.
10 If you turn to page 24, for instance, 11 right at the top there's a statement, "Corrosion and 12 hydrogen uptakes are lowered for modern clad alloys:
13 ductility is better kept. Lower the corrosion, lower 14 the associated hydrogen uptake, better the ductility, 15 bigger the balloons."
16 This is an observation about LOCAs. It 17 has nothing to do with the RT2 test. It has to do 18 with observations that have been made of how this 19 material behaves under LOCA conditions.
20 Same thing on page 25. There's a phrase 21 right at the top of the page, "Same tendency is 22 observed with low tin zirconium allow: lower the tin 23 content, bigger the balloons." The word "observed" is 24 used. It has nothing to do with the tests that were 25 done at VERCOR in 1998.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
729 1 This entire contention -- this entire 2 section of the IRSN presentation has to do with what 3 IRSN had to say about the current state of knowledge 4 regarding the behavior of this cladding material and 5 plutonium fuel under LOCA conditions.
6 So that just needs to be understood very 7 clearly. The rest is -- it's a red herring.
8 CHAIR YOUNG: Just on clarifying, these 9 two pages -- 24 and 25 -- and the observations -- the 10 observation in one, is this something that was new 11 with the October presentation, this --
12 MS. CURRAN: Yes. In fact, if you look on 13 page 20 -- on page 24, in the middle of the page, 14 there is a small -- small type on the left where it 15 says, "See references 7 to 9." And then, on page 25, 16 right at the top of the graph -- of the chart it says, 17 "See references 8 and 10."
18 Well, if you go back to the list of 19 references, references 8 and 9 are references that 20 weren't even created until after the 2001 meeting, 21 which was the last place where LOCA conditions were 22 discussed, last relevant discussion.
23 The 2002 meeting has no relevance, but 24 these issues were -- these papers were written after 25 that 2001 meeting. Reference number 10 is an undated NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
730 1 reference to unpublished IRSN results. Who knows when 2 they were created? But that may have also been after 3 the -- after 2002.
4 And, obviously, those results are not 5 referring to the severe accident test, because they 6 have nothing to do with this. They're referring to 7 some other studies that IRSN did of LOCA conditions, 8 completely different.
9 Now, you know, we were confused at the 10 beginning because IRSN used the word "relocation" for 11 both severe accident and LOCA conditions. But if you 12 read this carefully, you will see at the top of each 13 page there is either a reference to severe accidents 14 or LOCA pending issues.
15 These issues raised in Contention 10 16 relate to LOCA issues. They are based on known 17 information about characteristics of cladding and fuel 18 under LOCA conditions.
19 JUDGE ELLEMAN: And just to make sure I 20 heard your earlier comment, it is the text associated 21 with these viewgraphs that you have been unable to 22 secure and find in your efforts.
23 MS. CURRAN: The text?
24 JUDGE ELLEMAN: The text. These graphs go 25 with a text presentation. Was that not the text that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
731 1 you were unable to locate?
2 MS. CURRAN: No. I did say I think that 3 these references listed in the back of the viewgraphs 4 are likely to be privately-held documents that would 5 not be available to us. But we are only -- when the 6 meeting was held on October 23rd, it wasn't 7 transcribed.
8 JUDGE ELLEMAN: I see. Okay.
9 MS. CURRAN: This is the only paper that 10 was distributed. There was no --
11 JUDGE ELLEMAN: There is no text, then.
12 MS. CURRAN: There's no other text, other 13 than these viewgraphs, that was presented at that 14 meeting.
15 JUDGE ELLEMAN: Okay.
16 CHAIR YOUNG: And it wasn't videotaped or 17 anything like that?
18 MS. CURRAN: No, not to my knowledge. I 19 believe --
20 CHAIR YOUNG: You've got about five 21 minutes.
22 MS. CURRAN: -- at one point Mr. Repka 23 says that the contention and the IRSN presentation 24 speculates that the use of M cladding might result in 25 bigger balloons when, in fact, this is an observation NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
732 1 that was made that's reported in the IRSN papers.
2 This is not speculation. This is simply observation.
3 These people were putting together what is known about 4 this material.
5 Okay. And then I'd just like to get to 6 the Generic Safety Issue for a minute. And I'd like 7 to direct your attention to Attachment 4. Now this is 8 the attachment to the June 2002 memo.
9 If you turn to Attachment 4, page 5, I'd 10 really like to ask you to focus on the third full 11 paragraph, which says, "The original resolution to 12 GI-92 included that fuel relocation was a non-13 conservatism not appropriately accounted for by 14 Appendix K, but that the estimated effect on large 15 break LOCA peak cladding temperature of plus 46 16 degrees Fahrenheit was bounded by other analysis 17 conservatisms. In other words, the problem was 18 bounded.
19 Then, if you drop down lower in that 20 paragraph, it says, "More recent information suggests 21 that the fuel relocation effect on PCT," which is peak 22 cladding temperature, "may be significantly larger 23 than assumed in GI-92."
24 Fuel relocation during LOCA, therefore, 25 should be considered an Appendix K non-conservatism NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
733 1 with at least a plus 46 Fahrenheit impact on PCT until 2 new data is available to help quantify the effect."
3 Now that's only relating to uranium fuel. That 4 doesn't even get to the question of, what is the 5 significance of this with respect to the higher energy 6 plutonium fuel.
7 This is the NRC saying -- the research arm 8 of the NRC saying, "This is not bounded by the 9 conservatisms that we thought bounded it, or we have 10 no basis for judging that it is." This seems to be 11 very -- to us this is extremely significant.
12 CHAIR YOUNG: Can you wrap up in about a 13 minute and a half?
14 MS. CURRAN: Okay. Mr. Repka said that 15 it's -- LOCA analyses have been done and ballooning 16 has been modeled. Again, want to point out that 17 whether or not ballooning is modeled, the important 18 issue for purposes of this contention is, has it been 19 modeled in connection with fuel relocation? Which it 20 has not, and that is what the IRSN presentation was 21 calling for -- an analysis of those phenomenon looked 22 at together.
23 JUDGE BARATTA: So you're saying it's the 24 synergistic effects of the ballooning and fuel 25 relocation -- LOCA fuel relocation that you're NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
734 1 concerned about.
2 MS. CURRAN: Yes. I'm not sure I would 3 use the word "synergistic." But they're definitely 4 related. That might be the right word. I'm just not 5 sure.
6 JUDGE BARATTA: Okay. No, that's fine.
7 Okay. Thank you.
8 MS. CURRAN: So in other words, these 9 alleged -- this is a statement that the alleged 10 conservatisms that are used in Appendix K aren't 11 sufficient to cope with this problem.
12 CHAIR YOUNG: Just for informational 13 purposes, there have been references in here to the 14 resolution of the time, resolution of the issue, 15 through participation in an experimental program to be 16 conducted in the 2003/2004 timeframe. Does anyone 17 have any more information on that?
18 MS. UTTAL: No.
19 MS. CURRAN: We don't. I don't think I 20 have anything to add on this.
21 JUDGE BARATTA: Would you agree with -- I 22 think I made a statement a little earlier about what 23 the real issue is on the -- it deals with the 24 uncertainty and inadequacies of the database, so that 25 we would have a reasonable level of confidence in our NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.oom
735 1 ability to predict and evaluate the behavior of this 2 fuel. Is that the critical issue?
3 MS. CURRAN: You know, it's interesting 4 because -- well, I think we used the word 5 "uncertainty." Uncertainty is kind of a technical 6 term with respect to severe accident analysis, but 7 here it's maybe more of a layman's term.
8 JUDGE BARATTA: I'm using it in this case 9 as more of --
10 MS. CURRAN: The unknowns -- in other 11 words, for example, that the NRC is no longer able to 12 say that there -- any analysis of fuel relocation 13 would be conservative, even for uranium fuel. So it's 14 an even more extreme situation for plutonium fuel.
15 The inability to be assured that one's 16 analysis which is required, a LOCA analysis is 17 required, to be assured that analysis is conservative, 18 that's a form of uncertainty, yes.
19 CHAIR YOUNG: It sounds like you're saying 20 the same thing.
21 JUDGE BARATTA: Yes.
22 CHAIR YOUNG: All right. Can we move on 23 to Contention 11?
24 MS. CURRAN: Okay. I'm going to go back 25 to page 10 of Duke's response, which is -- was NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
736 1 submitted in response to Contention 10, but it's 2 really relevant to Contention 11.
3 One of his arguments is that the test --
4 there were two tests that were done in 1998. One was 5 RT2 and one was RT7. And, apparently, RT2 went one 6 way, and RT7 went another way. In RT2, the fuel 7 melted or slumped at a lower temperature, and in RT7 8 it didn't. And so according to Duke, we overstate the 9 importance of one comment -- in other words, of one 10 data point -- the RT2 data point.
11 But there's a couple of problems with this 12 argument. First of all, if you look at the 13 viewgraphs, I think it's the viewgraphs that I passed 14 out earlier that were used in the February 2002 15 meeting, those viewgraphs described the different 16 conditions that were imposed on these two different 17 tests. They weren't identical tests.
18 In one test the conditions were oxidizing, 19 and in the other tests the conditions were reducing.
20 And so we don't know what the effects of those 21 different conditions might be, but suffice it to say 22 these were not identical tests that went the opposite 23 direction.
24 The second point is two data points are 25 not sufficient from a statistical standpoint to draw NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
737 1 a conclusion that this is no problem, even if -- even 2 if the tests were considered to be identical. That 3 the observation in the RT2 test is significant enough 4 to warrant further investigation, because what it 5 shows is that fuel will melt, potentially melt, at a 6 lower temperature -- the plutonium fuel will melt at 7 a lower temperature than what uranium fuel would melt 8 at.
9 And once the fuel melts, then, of course, 10 you're much closer to a runaway situation where it's 11 impossible to cool the core. It's a very serious, 12 severe accident condition.
13 I think the second argument that goes from 14 pages 10 to 11 is just an argument that the severe 15 accident data from the R2 test isn't applicable to a 16 LOCA test. And we're not asserting that it is, so I 17 don't think there's anything to be added there.
18 Let me just see if there's anything else.
19 Well, part of Duke's response has to do 20 with whether severe accidents have to be evaluated in 21 the context of a safety analysis. And for that I just 22 prefer to rest on the arguments that we made in the 23 last oral argument, which I think all sides 24 exhaustively debated, and I just refer the Board back 25 to that discussion.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
738 1 CHAIR YOUNG: Is this contention intended 2 to be limited to a safety context?
3 MS. CURRAN: Yes. The NEPA contention is 4 the next contention, Contention 12. So this went on 5 a -- we tried to separate them out legally.
6 CHAIR YOUNG: And is your purpose in 7 separating them out just simply to make sure you've 8 covered your bases, or is there some other particular 9 reason for separating them out?
10 MS. CURRAN: So that it's clear that there 11 are different legal requirements.
12 CHAIR YOUNG: But the substance --
13 MS. CURRAN: Yes.
14 CHAIR YOUNG: -- of them --
15 MS. CURRAN: The substance is the same.
16 CHAIR YOUNG: The substance is the same.
17 MS. CURRAN: Okay. On page 18, Duke takes 18 issue with our assertion that there will be higher 19 release rates and higher release fractions for both 20 fission products and actinides. But this is 21 confirmed, if you look at page 6 of the viewgraphs 22 that were submitted on October 23rd, there is a graph 23 of the test results from VERCOR.
24 And if you read the -- that graph shows 25 exactly what we're saying. At least with respect to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
739 1 fission products, there's higher release rates and 2 higher release fractions.
3 And Duke also disputes the significance of 4 this, because the portion of plutonium fuel during the 5 LTA testing is going to be so small in comparison to 6 the higher -- to the volume of the core. But what's 7 important to BREDL, and we think should be important 8 to the NRC, is because the release fraction would 9 increase, and because the releases would be earlier, 10 this would have effects on the numbers of deaths and 11 illnesses that would occur if there were a severe 12 accident at the plant.
13 And any number of additional deaths or 14 illnesses as a result of this -- of using plutonium is fuel in this plant in whatever quantity should be 16 taken into consideration as a significant safety 17 issue.
18 I don't have anything else.
19 CHAIR YOUNG: All right. Mr. Repka?
20 MR. REPKA: Contention 11 is a safety 21 contention challenging Section 3.8 of the license 22 amendment application. That's Duke's general risk 23 assessment that was included and that we discussed 24 last month.
25 Ms. Curran stated correctly that the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
740 1 initial issue right here is the fact that that risk 2 assessment is not required to meet current NRC 3 regulations related to safety analysis, and that 4 continues to be our position -- that the risk 5 assessment wasn't required, isn't required, and, 6 therefore, a challenge to that is not a material issue 7 in this proceeding. We could remove Section 3.8 of 8 the application, and this particular Contention 11 9 would be mooted. And that continues to be our 10 position.
11 Now, parsing through the rest of the 12 contention as written and putting that aside for the 13 moment, the assertion in the contention is that based 14 upon the IRSN proposal for additional testing at 15 Phebus, there is an assertion that the probability of 16 a severe accident will be increased and/or that the 17 consequences of a severe accident will be increased.
18 And let me look -- take a look at the 19 first question, the probability of a severe accident.
20 What that contention means and addresses is the LOCA 21 analysis again. Will the Catawba emergency core 22 cooling system be able to prevent a severe accident 23 with these four lead assemblies?
24 The bottom line is that's precisely the 25 same issue that's addressed in Contention 10 -- the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neatrgross.com
741 1 adequacy of the design basis LOCA analysis. Stated 2 another way is, is that LOCA analysis insufficient to 3 assure that there will be no severe accident?
4 So with respect to that piece of the 5 Contention 11, it's no different from Contention 10.
6 And the basis is the same as Contention 10; it's the 7 IRSN presentation.
8 And our point on that remains that, number 9 one, IRSN did not present any particular data on LOCA 10 temperature. Number two, the contention doesn't 11 provide any particular information upon how these 12 concerns regarding potential fuel relocation at LOCA 13 temperature would not be -- would be impacted -- would 14 impact the LOCA analysis, how four lead assemblies 15 would make a difference in the LOCA analysis, and how 16 the conservatisms and margins already built into those 17 analyses would be insufficient.
18 There's no data, no basis for any 19 assertion that says that the LOCA analysis is 20 insufficient. But that's -- as I said before, that's 21 essentially the issue of Contention 10.
22 So then the next question raised by this 23 particular contention is with the -- let's just assume 24 that we have an inadequate emergency core cooling 25 system, and we're into -- beyond-design-basis severe NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005.3701 www.nealrgross.com
742 1 accident. Would the consequences of that accident be 2 any different based upon what IRSN has put on a piece 3 of paper for the slide presentation in October?
4 Now, this contention then devolves quickly 5 into the same discussion that we had last month on the 6 similar beyond-design-basis issues. Ms. Curran argues 7 that the IRSN presentation supports the argument --
8 Dr. Lyman's argument that there will be higher release 9 rates and higher release fractions, and that this 10 would have an effect on offsite consequences.
11 In fact, his 2000 paper in which he did a 12 calculation of the consequences of severe accidents 13 for 40 percent MOX cores, which we discussed last 14 month, did reference the VERCOR's tests and already 15 conducted an analysis of the changes of consequences 16 of severe accidents using bounding considerations, 17 using conservative assumptions related to the release 18 fractions and the release rates.
19 So he has already done that. This isn't 20 saying anything more than what's said in the other 21 contentions. And as we discussed last month, his own 22 results scaled to four assemblies showed a 1.6 percent 23 result. We're back to the question of, is there 24 something significant here?
25 And statistically, from a risk assessment NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
743 1 perspective, it's exactly the same as we discussed 2 with respect to those other contentions is, there is 3 nothing risk significant here. 1.6 percent doesn't 4 add up to anything that's risk significant or that 5 would inform the decisionmaking in any real way.
6 So the point is, IRSN doesn't add any new 7 basis, it doesn't add any new issue, and it's the same 8 as what we've already addressed, and it doesn't change 9 the result.
10 CHAIR YOUNG: Which contention was that 11 earlier one? Just if you have it on the tip of your 12 tongue.
13 MR. REPKA: I want to say that it was 14 within Contentions 1 to 3, which were the challenge to 15 Section 3.8, but I'd have to confirm that.
16 CHAIR YOUNG: Okay. Well --
17 MR. REPKA: It's a concern that undercuts 18 several of the contentions. But I think Contention 2 19 is the one where perhaps it's most directly raised.
20 CHAIR YOUNG: Thank you.
21 MR. REPKA: I think Ms. Curran has again 22 characterized the information in this IRSN 23 presentation on October of 2003 as new. I continue to 24 dispute that. I think that the 2001 presentation, as 25 pointed out this morning, has many of the same figures NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
744 1 as what's actually used in the October 2003 related to 2 LOCA issues as well as severe accident issues.
3 If we look at page 5 of the contentions, 4 this is the basis for the contention. It states about 5 midway down, "Another part of the IRSN Phebus proposal 6 presented at the October meeting was a plan to address 7 uncertainties, phenomenon that could affect the 8 probabilities of severe accidents including the poor 9 performance of MOX fuel during a LOCA."
10 Again, there's no basis provided for that; 11 it's just a speculative remark. "Which could increase 12 the chance that the accident cannot be mitigated."
13 Again, there's no basis for that particular assertion, 14 that it could or would increase the chance, 15 particularly given the fact that we're talking about 16 only four assemblies.
17 And then, it lists some phenomenon that 18 could affect the consequences of severe accidents.
19 But, again, that's simply the higher release rates and 20 the higher release fractions that were already assumed 21 in the 2000 study, and that showed a risk-22 insignificant increase in offsite consequences.
23 So, again, we have a contention that's 24 basically overselling a concern, a question, into an 25 assertion of fact. And there's no real dispute of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
745 1 fact that would lead to a different result in the 2 case.
3 I don't have anything further, unless 4 there's questions.
5 CHAIR YOUNG: Staff?
6 MS. UTTAL: Thank you.
7 CHAIR YOUNG: That was almost exactly 15 8 minutes. Very good. Nice work.
9 MR. REPKA: I knew that.
10 (Laughter.)
11 MS. UTTAL: I really don't have much to 12 add. The Petitioners are asking that the licensee 13 perform an analysis of severe accidents and safety 14 space. It's not required. Staff doesn't require it.
15 Therefore, there was no basis for this contention, and 16 it should be rejected.
17 I rely on previous arguments regarding 18 this issue, and both the Staff's briefs.
19 CHAIR YOUNG: Ms. Curran?
20 MS. CURRAN: I wonder if I could ask for 21 a five-minute break. I think it would help my answers 22 be more efficient with regard to the questions -- the 23 arguments of Dr. Lyman.
24 CHAIR YOUNG: Yes, let's do that. Let's 25 take about 10 minutes. And then, if you could -- I NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
746 1 wrote down a number of questions, and I assume that 2 you did, too. So you'll be -- you'll go down and 3 respond to those questions, and then we'll just go 4 straight into 12 after that.
5 MS. CURRAN: I hope I wrote down the same 6 ones you did.
7 CHAIR YOUNG: Well, if you didn't, I'll 8 ask them.
9 JUDGE BARATTA: Now, in other words, this 10 is our break now, right?
11 CHAIR YOUNG: Yes.
12 JUDGE BARATTA: Okay.
13 CHAIR YOUNG: Is that all right with 14 everyone?
15 SEVERAL PARTICIPANTS: Sure.
16 CHAIR YOUNG: This will be our break.
17 Okay.
18 (Whereupon, the proceedings in the 19 foregoing matter went off the record at 20 2:37 p.m. and went back on the record at 21 3:02 p.m.)
22 CHAIR YOUNG: I just spoke with Judge 23 Bollwerk, the Chief Judge, and we talked about various 24 ways of approaching this.
25 Because of a situation that I'd heard NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
747 1 earlier -- and I can't give you a cite -- but Judge 2 Bollwerk is not inclined to appoint someone just to 3 look at documents. The two alternatives would be to 4 reconstitute the Board either completely or separate 5 out the security issues and reconstitute the Board for 6 the rest of the proceeding, either for security issues 7 or for non-security issues or not, not to do it sort 8 of halfway by appointing someone to help us get over 9 this period of having to look at the documents and 10 rule on this motion, and then go back to the same 11 Board.
12 So another option that we're considering, 13 and we think might resolve this in the most efficient 14 way -- and it may not please everyone completely, but 15 we think it might move things forward overall more 16 efficiently than trying to get a new person up to 17 speed on this case who is not at all familiar with it.
18 And that is that Judge Baratta and I, 19 after talking with Judge Elleman tomorrow and today on 20 whatever we can look at today and tomorrow, which is 21 -- does not include the classified information, Judge 22 Baratta and I would then go ahead with the session 23 with you next week and rule on the Motion for 24 Extension with regard to all of the documents, except 25 the two classified documents.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
748 1 There are only two, correct?
2 MR. FERNANDEZ: That's correct.
3 CHAIR YOUNG: Then, we realize that you've 4 made an argument that they are connected, that there 5 is some relationship between them. However, if we 6 make a ruling with regard to all of the safeguards 7 documents, all of the documents except the two 8 classified, then we would proceed with regard to 9 those, and then when Judge Elleman gets back we 10 already have the February 12th session set.
11 At that point, we could hear any 12 additional argument that needs to be made with regard 13 to the classified documents, which Judge Elleman and 14 I both have clearance to see. And then, we think that 15 overall that would probably keep us on a more 16 efficient and speedy course than trying to start fresh 17 with a whole new Board.
18 MR. FERNANDEZ: That seems fine to us.
19 The one thing I was going to say is I -- after just 20 speaking on the phone to headquarters, I don't know 21 how feasible it will be to get you documents tomorrow.
22 CHAIR YOUNG: Well, and that actually 23 would -- we're going to have the submission and the 24 exemption request. Judge Elleman can look at that 25 with us, and then Judge Baratta and I can see all of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
749 1 the safeguards documents and hear your argument next 2 week. And the two of us can make a decision in the 3 absence of Judge Elleman. And then, once Judge 4 Elleman gets back, if Judge Baratta's clearance is not 5 -- has not yet come through, then Judge Elleman and I 6 will consider the classified information.
7 Ms. Curran, you're the one who may have 8 more of an objection to anyone else. But considering 9 all of the options, do you want to give us your 10 thoughts on that?
11 MS. CURRAN: Well, first of all, I think 12 there's three classified documents, because there is 13 the two orders that went out after April 29th -- or on 14 April 29th to NFS and --
15 CHAIR YOUNG: You've got the documents.
16 I don't have the list in front of me, so --
17 MS. CURRAN: -- BWXT, but --
18 CHAIR YOUNG: I'm sorry.
19 MS. CURRAN: There is also the --
20 CHAIR YOUNG: Repeat what you just said.
21 I interrupted.
22 MS. CURRAN: Oh, yes, sure.
23 CHAIR YOUNG: I was trying to look for the 24 document, and then I remembered I didn't have it.
25 MS. CURRAN: Well, there's -- I think NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
750 1 there's three classified documents. The first two 2 would be the orders that went out April 29th to NFS 3 and BWXT. But then, a third document would be 4 whatever requirements apply -- applied to Category 1 5 facilities --
6 CHAIR YOUNG: Has anyone got the document?
7 MS. CURRAN: -- before September 11th, 8 because there's got to be something that applies.
9 MR. FERNANDEZ: Your Honor?
10 CHAIR YOUNG: Yes. And when you answer, 11 have you got the document in front of you? Maybe 12 somebody could just look down it, because I remember 13 seeing the references to classified. That should be 14 a relatively simple thing to --
15 MR. FERNANDEZ: What are we talking about?
16 CHAIR YOUNG: -- clarify. The motion.
17 MR. FERNANDEZ: Oh.
18 CHAIR YOUNG: There was a list of 19 documents.
20 MR. FERNANDEZ: Yes. The legal standards 21 that would apply to a Category 1 facility to whom no 22 orders have been issued are contained in Part 73 of 23 the regulations.
24 CHAIR YOUNG: The question is: are there 25 any other documents besides the two April 29th to --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
. . 234.4433 (202) WASHINGTON, D.C. 20005.3701 www.nealrgross.com
751 1 what are the names of the --
2 MR. FERNANDEZ: BWXT and NFS.
3 CHAIR YOUNG: Right. Are there any other 4 classified documents?
5 MR. FERNANDEZ: No, not that I'm aware of, 6 Your Honor.
7 CHAIR YOUNG: Okay. So on the list there, 8 were there -- can you just open it up to the list?
9 MR. FERNANDEZ: Yes.
10 CHAIR YOUNG: Are there any others that 11 are referred to as being classified that are not, in 12 fact, classified?
13 MR. FERNANDEZ: Yes, this generic DBT 14 that's not specific to any particular facility. It's 15 a DBT that is contained in Part 73 of the regulations.
16 CHAIR YOUNG: Can we see a copy of that 17 again? And I can maybe ask you more direct questions.
18 MR. REPKA: The list?
19 CHAIR YOUNG: The list of documents. The 20 list of documents. I think there was a list in the 21 motion. Thank you. I feel like I'm talking in a 22 vacuum otherwise.
23 Okay. The list -- okay. It says, "The 24 classified design" -- can I read this? This is all 25 right to read, right?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
752 1 MR. FERNANDEZ: Your Honor, I really would 2 hope that we would talk about this when we got back to 3 Rockville, because we're getting really into the --
4 CHAIR YOUNG: It's a simple question. All 5 I want to know is, is the fourth document listed, 6 which is the third on page 4 --
7 MR. FERNANDEZ: I can't follow because I 8 don't have it in front of me, but you can tell me what 9 it is.
10 CHAIR YOUNG: "The classified design basis 11 threat for Category 1 facilities, which is applicable 12 to Catawba by virtue of the presence" -- can I 13 continue reading? -- "of formula qualities of --
14 quantities of plutonium during LTA testing."
15 MR. FERNANDEZ: No such document that I 16 know of exists, other than what's in the regulations.
17 MS. CURRAN: Well, but that's not our 18 understanding at all. For instance --
19 CHAIR YOUNG: Well, again, let's -- I wish 20 we had a security person here, but --
21 JUDGE BARATTA: Let me make a suggestion.
22 CHAIR YOUNG: Go ahead.
23 JUDGE BARATTA: We won't rule out this 24 possibility of this third document. Okay? Just 25 hypothetically at this point. In other words, that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
753 1 you got -- there's two definite documents that are 2 classified. There may be a third or even a fourth.
3 The concept -- the question is, there are a bunch of 4 -- a group of documents that are unclassified, 5 safeguards.
6 MS. CURRAN: Yes.
7 JUDGE BARATTA: And if we were to proceed 8 with just hearing the rationale for the delay, and the 9 rationale for the need for those specific documents, 10 realizing there is an interrelationship on next 11 Wednesday, and then on the 12th, by then we could do 12 -- the Staff and everybody could do a little more 13 research to see if there are other documents. Okay?
14 CHAIR YOUNG: In other words, let's assume 15 -- let's assume, for argument's sake, that we granted 16 your motion with regard to the safeguards documents, 17 with regard to all except the classified documents, 18 any documents that were classified.
19 We would expect you then to go ahead and 20 get started and submit something within whatever 21 deadline we set that was based on those documents.
22 Then, later, on February 12th, we would hear the 23 argument about the classified documents. And if we 24 were persuaded, we would set separate deadlines for 25 any contentions based on those.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
754 1 We realize there might be some overlap, 2 but it seems to us that it would be most efficient to 3 proceed in that manner. And it might -- it might 4 involve some duplication of effort on the parties' 5 parts, but overall it seems to be more efficient.
6 So if anyone has any strong objection to 7 that, we want you to state it now.
8 MS. CURRAN: I don't -- we don't have an 9 objection to that way of going ahead. I am concerned, 10 however, that -- it seems actually pretty odd to me 11 that the Staff is saying that there is no classified 12 portion of the Category 1 security standard, other 13 than these orders that have been issued to the two 14 operating Category 1 facilities. And that's --
15 CHAIR YOUNG: But wait. Is there -- and 16 we need to talk about that.
17 MS. CURRAN: Well, can I give an example?
18 I would just kind of like to put a bee in the Staff's 19 bonnet, because I don't want to spend another month 20 arguing on such a basically rudimentary level about 21 things that, hey, I don't know that much about 22 security, but I read the newspaper, and I -- and I 23 read kind of general NRC Staff documents.
24 And I know that, for instance, in 10 CFR 25 73.1, subsection (a) (2), there is a definition of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com I
755 1 theft or diversion of formula quantities of strategic 2 special nuclear material -- in other words, Category 1 3 material. And it's defined as a determined, violent, 4 external assault, attack by stealth, or deceptive 5 actions by a small group with the following 6 attributes, and then there's a list of attributes.
7 Well, it's my understanding that the 8 definition of what a small group is is classified 9 information, has been for a long time, and that one of 10 the things that was changed after September 11th was 11 that the NRC revisited, you know, what's the size of 12 a credible small group? Having had the experience of 13 September 11th that the group was pretty big in 14 comparison with what they had been assuming.
15 And so there is some preexisting standard 16 for what a small group is that's classified, and then 17 there's whatever went on on April 29, 2003, which may 18 have increased that number. But it's been my 19 understanding for a long time that the definition of 20 how many people are in this small group exists, and 21 it's classified information.
22 So for the Staff to say there's nothing 23 there other than what's on the books --
24 CHAIR YOUNG: Okay. We understand what 25 you're saying. Let me just say this. I want the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
756 1 Staff next week to have a security expert there. And 2 I know Bern Stapleton is expert in these 3 classification issues, who may be able to answer the 4 question without getting into the classified 5 information, may be able to answer the question of 6 what's out there, so that we can have a good predictor 7 of what we're going to need to be dealing with later.
8 Okay?
9 Apart -- and so we understand your 10 argument, and we agree it needs to be resolved. Apart.
11 from that, are there any objections or any other 12 things that you want to say today with regard to our 13 plan of action? Because we do need to get --
14 MS. CURRAN: Yes.
15 CHAIR YOUNG: -- back on the contention --
16 yes, go ahead.
17 MS. CURRAN: We think your plan of action 18 is fine.
19 CHAIR YOUNG: Okay. All right. Then, 20 that's what we will do. We'll meet next Wednesday, 21 the 21st, at 2:00, in our hearing room. And bring Mr.
22 Stapleton if possible, someone who is familiar with 23 classification.
24 MR. FERNANDEZ: It probably won't be Bern 25 Stapleton, Your Honor. It will probably be somebody NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
757 1 that's actually familiar with the classified DBT.
2 CHAIR YOUNG: Right. Someone who can 3 answer this question for us.
4 MR. FERNANDEZ: One last point that I want 5 to make after talking to my client. All of this 6 discussion that we've had I hope does not imply in any 7 way that the Staff has waived any objection as to 8 whether the Board has the authority to make the need-9 to-know determination or what type of deference the 10 Board would owe to the Staff in regards to that 11 determination.
12 CHAIR YOUNG: You can make whatever 13 arguments -- I mean, we -- we appreciate any arguments 14 that anyone makes to us. I mean, we want to be fully 15 informed by all parties on what -- your views of our 16 authority, along with all of the -- any other relevant 17 law. So no, I mean, we --
18 MS. CURRAN: I would just ask that if 19 we're going to hear that argument on January 21st, the 20 Staff take into consideration that it agreed to 21 paragraph (c) (2) of the protective order, which has 22 the Board making the need-to-know determination if 23 there's a dispute.
24 MR. FERNANDEZ: Whatever argument we make 25 will take into account any positions we've taken in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
758 1 the past.
- 2. CHAIR YOUNG: Okay. Well, I hope you'll 3 abide by your agreements that you've made -- in fact, 4 made agreements. But actually, that does remind me of 5 one thing, though. And it might be a good idea to get 6 responses, if we could get them. Would it be possible 7 to get those responses before -- I mean, Mr. Repka, 8 you wanted us to rule on this today, and I assume you 9 wanted to just make your arguments.
10 But it might be helpful to file written 11 responses that we would get on Tuesday morning if 12 possible, but noon maybe, so that we would have some 13 idea of what to expect, and things would go more 14 smoothly on Wednesday. Does that make sense to you?
15 It might help you to sort of formulate 16 your arguments, too. Especially if you're going to 17 get into issues like our authority, it would be very 18 helpful to us to have your arguments in advance, so 19 that if we need to do any preliminary research and 20 come up with questions that we may have for you that 21 we'll have a chance to do that, and that way all of us 22 will make more efficient use of our time next 23 Wednesday.
24 So I'd say, what time on Tuesday do you 25 think you could get those to us? The earlier the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
759 1 better for us, obviously. But we want to be 2 reasonable.
3 MR. REPKA: Well, we have not contemplated 4 making a written filing and would certainly discuss 5 that. I would say to the extent that there would be 6 a filing, I wouldn't make it too early in the day on 7 Tuesday, but --
8 CHAIR YOUNG: 3:00?
9 MR. REPKA: 3:00 is fine.
10 CHAIR YOUNG: Okay. And, really, what 11 triggered me to think about that was if there are 12 issues having to do with jurisdiction or authority, I 13 mean, if it's in the agreement, it's in the agreement.
14 But if there are issues having to do with those types 15 of legal issues, I'd like to be prepared on those in 16 advance. I don't want to just be hit with something 17 like that, and then not be prepared myself to ask 18 appropriate questions.
19 So that's what I'm really asking you to 20 bring to our attention. Don't come in on Wednesday 21 making legal arguments that we haven't gotten some 22 prior notice of. And if you're going to -- and if 23 there are going to be safeguards documents, so 24 designate them and deal with all of the -- you know, 25 you might want to hand-deliver something like that.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
760 1 Anyway, anything else on this?
2 MS. CURRAN: There's just one more point 3 that I'd like to make that I think might be helpful as 4 we go into this. In our letter on December 19th we 5 listed the standards that we wanted.
6 Now, the way we identified those was we 7 deduced what they were from the materials that we 8 reviewed and from our general knowledge. But we've 9 never seen them. We've never seen the whole array of 10 regulations and regulatory guidance that's applicable.
11 And I mean both before September 11th and after, 12 whatever regulations were changed or guidance was 13 changed after September 11th, and whether it was 14 changed for a specific facility or generally.
15 And I hope that we're not going to get 16 into game-playing that because we didn't use the 17 proper terminology that the Staff says, "Well, we 18 don't have the thing you're asking for," because we 19 are asking in general terms for what guidance the 20 Staff has that would be applicable here.
21 CHAIR YOUNG: Okay. Point --
22 MS. CURRAN: But we can't identify it with 23 specificity.
24 CHAIR YOUNG: I think your point is well 25 taken. And I think that given the timeliness NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
761 1 questions that we have about this whole proceeding, I 2 would encourage all parties to be direct, be 3 straightforward. I'm just reading, Mr. Fernandez, 4 your letter. And there's no reference in here to the 5 document not existing. There's reference made to the 6 document as a matter of fact.
7 So I'm going to give you these back, but 8 I think that point is well taken, and --
9 MR. FERNANDEZ: I'm sorry, Your Honor. I 10 didn't get what you were trying to say by your -- the 11 statement you just made.
12 CHAIR YOUNG: To the extent that this 13 January 13th letter that you sent, do you consider 14 that to be safeguards?
is MR. FERNANDEZ: No.
16 CHAIR YOUNG: Okay. In that letter, one 17 of the documents that's listed is the classified DBT 18 for Category 1 facilities. You then state at the end 19 of the list, "As you were informed by Ms. Uttal on 20 January 9, 2004, the Staff has reviewed your request 21 for the aforementioned documents and has determined 22 that you do not possess the requisite need to know for 23 the information that you have requested. The 24 documents are not being relied upon by the Staff."
25 In other words, you don't say at that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.neaIrgross.com
762 1 point there is no such document. So one reading this 2 letter would assume that there is a document like 3 that. That's the only point I was trying to make.
4 So let's try to all be clear, and no game-5 playing on anybody's part. Anybody's part. So that 6 we can all move forward as quickly as possible.
7 So responses by 3:00 on Tuesday, and we'll 8 see you Wednesday at 2:00. And before we leave --
9 maybe now, just so we won't forget -- someone come up 10 and get these. Thank you.
11 And we'll -- and I'm going to be in the 12 office on Monday, so -- and you're going to be -- I'm 13 sorry, on Tuesday you're going to be there. So if I'm 14 not there, you can contact Judge Baratta and get us 15 those -- all of the documents as soon as possible.
16 And I suppose I can go ahead and look at the 17 classified ones, at least look at them on Tuesday.
18 JUDGE BARATTA: Just one point of 19 clarification. You said it was unlikely that we would 20 get anything additional tomorrow, or is there likely 21 to be something at that address in Raleigh or not?
22 MR. FERNANDEZ: No.
23 JUDGE BARATTA: Okay. Thank you. I just 24 -- thank you. I appreciate your effort in trying, by 25 the way. Thank you.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
763 1 CHAIR YOUNG: Yes, we do. Thanks.
2 Thanks, everybody.
3 And before we leave, we'll get the 4 documents from you, Mr. Repka, right?
5 MR. REPKA: We hope so. We put a contact 6 in. We haven't been able to confirm the individual 7 who has access to the safe has the message, but we've 8 sent out somebody else and we're doing everything we 9 can. One way or the other we should be able to do it.
10 CHAIR YOUNG: Okay. Thank you.
11 Well, amazingly enough, I had down on my 12 list that we were going to start at 3:30 with 13 Contention 12. And Ms. Curran was going to just give 14 your rebuttal on Contention 11, and we had a list of 15 questions, so we're not too far off. Let's go ahead 16 and be as quick as we can on that, and then we'll move 17 into 12.
18 MS. CURRAN: I will. But I'll say, again, 19 that I think from our perspective it's more important 20 to make sure that the Board's questions about this 21 contention are resolved, because they can be technical 22 in nature. And the next contention is more legal, and 23 I think can be more easily decided on the papers.
24 CHAIR YOUNG: Would you like me to read my 25 questions?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
764 1 MS. CURRAN: Sure.
2 CHAIR YOUNG: Okay. Ad they are sort of 3 sketchy, but I think Mr. Repka raised what he called 4 the real question, and I'm -- I probably didn't get 5 down every word, but something to the effect of 6 whether there's enough to show with a LOCA, whether 7 there's sufficient information to show that there is 8 no severe accident.
9 I wrote down a bunch of question marks 10 there, because I wasn't real clear on exactly the 11 point you were making, but I knew that I wanted Ms.
12 Curran to respond to that.
13 And then, the issue of the consequences --
14 if the cooling fails and you go into severe accident, 15 would the consequences be different? The relationship 16 between LOCA and severe accidents -- basically, that 17 thing that we got into a little bit at the last 18 argument -- and, Mr. Repka, if you want to just 19 briefly restate what you said on that that would be 20 fine.
21 And then, just the only other thing I had 22 was the reference to the 1.6 percent and the 23 significance of the difference. And my question was:
24 can you address how the information from the IRSN 25 presentation relates to that significance question?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
765 1 And then just generally, if you have anything to add 2 on the analysis of severe accidents in safety space, 3 just to sort of refresh my recollection of the 4 arguments on that.
5 Did you want to restate that? Do you 6 recall what I'm referring to?
7 MR. REPKA: I know exactly -- maybe I 8 shouldn't if Ms. Curran is going to respond to it.
9 But the point I was trying to make is this is a severe 10 accident contention, so we're beyond design basis 11 LOCA. So the first question raised by the contention 12 is there has to be something to show that the LOCA 13 analysis is inadequate, so that you would get to a 14 beyond-design-basis LOCA.
15 And the second issue is assuming you are 16 now there in a beyond-design-basis event, is there 17 something to suggest that the consequences of that 18 design -- that severe accident would be different?
19 CHAIR YOUNG: You're absolutely right. I 20 couldn't read my own handwriting. Thank you.
21 MS. CURRAN: I think that was very well 22 put, and I would like to also refer the Board to the 23 key sentence in the contention that I think Mr. Repka 24 is talking about. And that is -- it's on page 5 in 25 the bottom paragraph. "Phenomena that could affect NEAL R. GROSS.
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
766 1 the probabilities of severe accidents include the 2 poorer performance of MOX fuel during a LOCA compared 3 to LEU fuel, which could increase the chance that the 4 accident cannot be mitigated as discussed at page 6 of 5 the Phebus proposal."
6 CHAIR YOUNG: Ah, okay. Let me just 7 interrupt you there and just focus you, since you 8 asked for our questions. Mr. Repka made references to 9 both of those statements as being speculative, and I 10 wanted you to respond to that.
11 MS. CURRAN: Exactly. And, you know, when 12 I first said at the beginning this morning I had 13 proposed deleting footnote 2, and as I come to this 14 argument it occurs to me that was a mistake, because 15 footnote 2 refers back to Contention 10, which is 16 indeed relevant here. So I'd like to put that back in 17 to the contention.
18 The first part of this assertion I'd like 19 to talk about is the -- one of the phenomena that 20 could affect the probability of severe accidents is 21 the poorer -- the relatively poor performance of MOX 22 fuel during a LOCA compared to LEU fuel. Now for that 23 you go back to the IRSN presentation, which talks 24 about the phenomena -- a couple of phenomena related 25 to plutonium MOX fuel.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
767 1 One is the increased ballooning of the 2 cladding during a LOCA.
3 CHAIR YOUNG: That was on page 24 and 5, 4 is that what --
5 MS. CURRAN: Well, no, it would be later.
6 Let's see. When you -- hold on a minute. Okay. It 7 starts really around 23, where you see -- you see a 8 diagram of what fuel -- what might happen to the fuel, 9 if it crumbled. Do you see the fuel is kind of 10 stacked up, and then it moves as the space increases?
11 And then, on page 24, it talks about how 12 the balloons get bigger when you have -- with modern 13 clad alloys. And then, the bigger -- the balloon can 14 also get bigger with a lower tin content.
15 CHAIR YOUNG: Can you point me to the --
16 to the association of poor performance of MOX fuel?
17 MS. CURRAN: Well, okay. There's two 18 issues. One is the power generation of plutonium MOX 19 fuel, which you can see by looking at page 21. Okay?
20 Okay. That's one issue.
21 And then, if you look at page --
22 CHAIR YOUNG: Does the reference "increase 23 of power" -- is that -- are you saying we should take 24 that as suggesting --
25 MS. CURRAN: In comparison to uranium NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
. . 234-4433 (202) WASHINGTON. D.C. 20005-3701 www.nealrgross.com
768 1 fuel.
2 CHAIR YOUNG: That that's what that was --
3 that was referring to?
4 MS. CURRAN: Yes.
5 CHAIR YOUNG: Not just an increase in 6 power, period. Well, there's the note down at the 7 bottom, "Note that this question is particularly 8 important for end-of-life MOX fuel."
9 MS. CURRAN: Right. The power density of 10 plutonium MOX fuel is greater than for uranium fuel at 11 the same burnup. That's what this shows, or it's what 12 it's referring to.
13 CHAIR YOUNG: On the significance issue?
14 MS. CURRAN: Now, if you look on page 22, 15 there are questions that are raised about fuel 16 relocation under these conditions. This relates to 17 the microstructure of the fuel.
18 These are unknowns. This is a list of 19 unknowns, but it -- the unknowns are generated by the 20 fact that we know the microstructure of plutonium fuel 21 is different than the microstructure of uranium fuel.
22 And then this may affect what happens to the fuel 23 during relocation, how it is distributed on 24 relocation. And that -- those are the questions that 25 IRSN is trying to get at, to investigate.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
769 1 And then we had talked about -- page 23 --
2 where there is a visual diagram of how the -- what the 3 fuel stack looks like, and what happens to it when it 4 crumbles. And then, when you get to pages 24 and 25, 5 they bring in the issue of the relationship with the 6 cladding, that the cladding balloons.
7 So you have to look at the relationship of 8 the microstructure of plutonium fuel as it differs 9 from uranium fuel, taken together with the 10 characteristics of the cladding, put those things 11 together. And there are unknowns about that. What's 12 known is the difference in these characteristics from 13 uranium fuel that ought to be looked at.
14 CHAIR YOUNG: I guess just to -- if I can 15 sort of summarize my questions, Judge Baratta talked 16 about the basic issue being the adequacy of the data.
17 Mr. Repka raised the issue of the significance of any 18 difference --
19 MS. CURRAN: With respect to consequences, 20 is that what you mean? By having -- well --
21 CHAIR YOUNG: Whatever the 1.6 percent 22 referred to, if that was consequences.
23 MS. CURRAN: Well, let me -- maybe I 24 can --
25 CHAIR YOUNG: And then, just the other NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
770 1 one. Was the analysis in safety space of severe 2 accidents being dependent on somehow showing that the 3 LOCA analysis would not be sufficient?
4 MS. CURRAN: Okay. All right. I'm 5 getting there.
6 Now, it's important to bear in mind the 7 requirements of Appendix K. Where you get a severe 8 accident is a situation where the design basis 9 requirements can't be met. So if you look at 10 Appendix K, paragraph B, which is entitled "Swelling 11 and Rupture of the Cladding and Fuel Rod Thermal 12 Parameters," the NRC lays out requirements for an 13 evaluation of this parameter.
14 It says, "Each evaluation model shall 15 include a provision for predicting cladding, swelling, 16 and rupture from consideration of the axial 17 temperature distribution of the cladding, and from the 18 difference in pressure between the inside and outside 19 of the cladding, both as a function of time.
20 "To be acceptable, the swelling and 21 rupture calculations shall be based on applicable data 22 in such a way that the degree of swelling and 23 incidence of rupture are not underestimated. The 24 degree of swelling and rupture shall be taken into 25 account in calculation of gap conductance, cladding NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
771 1 oxidation, and embrittlement, and hydrogen 2 generation."
3 So here they're -- the NRC is requiring an 4 analysis of the behavior of the cladding under LOCA 5 conditions. And what this IRSN presentation shows is 6 that the analysis that Duke has done is not sufficient 7 to take into account these peculiar characteristics, 8 both of the fuel and of the cladding that are going to 9 be used in this case.
10 Now, if they haven't taken that into 11 account, if they haven't done an analysis that shows 12 that they are within the bounds of conservatism, then 13 what you have is a situation that could lead to a core 14 melt accident, because if the cladding fails then the 15 fuel is going to overheat. Or if the fuel collapses, 16 it could block the cooling function.
17 Now, you know, that -- it's -- and I'm 18 just suggesting why this is important. It isn't our 19 burden to show that if Duke can't satisfy Appendix K 20 that an accident will happen. The requirements are 21 that the applicant must satisfy the regulations. But 22 I'm explaining to you why it's important. Okay?
23 And if those requirements aren't met, then 24 that -- there's an implication there that the accident 25 can't be controlled, and that -- or if the database is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.neargross.com
772 1 so incomplete, and there are effects that are not 2 being taken into account, then there is another aspect 3 in which an accident may get out of control, and that 4 you -- the accident is on its way to a severe 5 accident.
6 So that is how the severe accident 7 contention -- one way that the severe accident 8 contention relates to the adequacy of the design to 9 satisfy the safety requirements, the design basis 10 requirements for this facility. Because Duke has not 11 shown taking into account the characteristics of this 12 fuel miscladding, that the requirements are satisfied, 13 there is a necessary inference that a severe accident 14 could occur. It's simply -- it follows from the 15 failure to meet the design basis requirements. That's 16 what they are intended to avoid.
17 CHAIR YOUNG: Are we ready to move into 18 the next one? Because I really have a fairly, I hope, 19 straightforward question, and that is, I would like a 20 little bit of clarification on the relationship in 21 your view of the analysis of severe accidents under --
22 as a safety issue and as a NEPA issue, and what 23 difference it makes.
24 MS. CURRAN: Okay. I would like to --
25 there's another question that you had that I would NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
773 1 like to address first, and that is the issue with 2 respect to consequences, because that's a major 3 question that you had.
4 And Mr. Repka characterized a report that 5 was prepared by Dr. Lyman -- and this gets back to the 6 argument that we had in the last session, but it's 7 important to look at the data on page 6 of the IRSN 8 presentation.
9 Here we go. Okay. Dr. Lyman's study 10 assumed that the release fractions for uranium and 11 plutonium were the same -- fuel. The release 12 fractions for uranium and plutonium fuel were the 13 same, even though the composition of the fuel was 14 different.
15 But if one were to put into the analysis 16 more realistic assumptions about the differences in 17 the release fraction, and the timing of the release, 18 that would alter the consequences of the accident and 19 make it more severe.
20 Now, Dr. Lyman hasn't done that 21 calculation, but it would make the consequences more 22 severe. And all you have to do is look at this table 23 that is included on page 6 of the IRSN submittal from 24 October 23rd, which shows that the release fraction 25 for the plutonium fuel is higher, and it shows that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
774 1 the release is earlier.
2 So, for instance, of course the size of 3 the release affects how many health impacts -- how 4 many people are going to be impacted or what is the 5 severity of the health effects. The timing of the 6 release affects the effectiveness of emergency 7 planning, because if you don't have as much time to 8 evacuate people, then you're going to get more 9 fatalities and illnesses.
10 So it's really grossly oversimplifying to 11 say that Dr. Lyman's earlier analysis that should 12 govern here, there are other factors that should be 13 considered and that would be considered, if this 14 contention were admitted and we were allowed to show 15 what the potential consequences of such an accident 16 would be.
17 CHAIR YOUNG: Is that why you want us to 18 consider both under safety, rather than only under 19 NEPA? Is that -- why do you want us to consider it?
20 If that's not why, why?
21 MS. CURRAN: Well, there are a lot of 22 reasons why this should be considered under the safety 23 rubric, which we discussed at length in the last oral 24 argument. And one of them is that the NRC has 25 guidance in Reg. Guide 1.174 which indicates that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
775 1 where there is a new area of regulation that has come 2 up, it's especially important and valuable to have a 3 risk analysis in order to inform the decisionmaking 4 process in a more helpful way.
5 CHAIR YOUNG: And you're saying that would 6 be relevant only in the safety context?
7 MS. CURRAN: No. I'm just explaining why 8 we think it is required under the safety requirements.
9 From an intervenor's perspective, Judge Young, we are 10 going to tell you every legal requirement to do a 11 safety analysis that we are aware of.
12 We're not going to pick and choose our 13 favorite one. We're going to present to you every 14 single legal requirement to do a safety analysis which 15 we believe is reasonable and necessary to protect 16 public health, whether it's under the Atomic Energy 17 Act or whether it's under NEPA.
18 CHAIR YOUNG: All I'm trying to understand 19 is -- maybe we're talking past each other.
20 MS. CURRAN: Yes.
21 CHAIR YOUNG: But all I'm trying to 22 understand is, is there any particular reason why this 23 issue should be admitted and/or considered as a safety 24 issue, if, for example, it were admitted and 25 considered as a NEPA issue?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
776 1 MS. CURRAN: Yes. And it's really simple, 2 and that is from our perspective we would like -- we 3 need a finding from the Board that it's required under 4 whatever statute is applicable, because if this case 5 goes all the way to the Court of Appeals, and there is 6 still dispute between the parties as to what law 7 governs here, we want the broadest possible coverage 8 to -- the Board to have found the broadest possible 9 coverage by the law, because we could lose on one 10 statute and win on another.
11 And what we're trying to get is the 12 practical effect of this safety analysis. It's not an 13 academic exercise from our point of view. We're 14 looking for every legal tool that we can find.
15 CHAIR YOUNG: But apart from that, there 16 is not a practical difference.
17 MS. CURRAN: There is no practical 18 difference.
19 CHAIR YOUNG: Okay.
20 MS. CURRAN: It's the same safety analysis 21 that we're looking for.
22 CHAIR YOUNG: Okay.
23 MS. CURRAN: Yes.
24 MR. FERNANDEZ: Your Honor, can I just say 25 something briefly in that regard, to the question that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
777 1 you just asked?
2 CHAIR YOUNG: Do you want to ask your 3 question? Is that okay?
4 JUDGE ELLEMAN: Well, let's listen to 5 what --
6 MR. FERNANDEZ: There is one practical 7 difference, in that the statutes authorize the Staff 8 to take different types of actions. So if we were to 9 admit that contention under the NEPA obligations of 10 the Staff, the Staff would discuss X, Y or Z in their 11 EIS, and disclose the environmental impacts.
12 But it's not necessarily clear that if an 13 environmental impact was found, that unless it 14 affected public health and safety, that there would 15 actually be an obligation on the part of the Agency to 16 remedy that environmental impact.
17 So under the Atomic Energy Act, you would 18 actually have an obligation, if it does impact on the 19 public health and safety, to take an affirmative 20 action to prevent them. So that is the practical 21 implication of the two statutes.
22 CHAIR YOUNG: Thank you. That's what I 23 was trying to get at. And can you tell me, in two --
24 10 words or less, what the actual difference would be?
25 You're referring to it generally. The Staff would be NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
778 1 required to take an action.
2 MR. FERNANDEZ: Well, if the Staff were to 3 find that the -- I'm so confused now I don't know 4 exactly what we're talking about. But if what Ms.
5 Curran and her client are complaining about -- if the 6 Staff were actually to find that it does have an 7 unacceptable impact on public health and safety, then 8 the Staff would make the applicant modify their 9 application accordingly to remedy that impact and 10 address it in safety space; whereas, in environmental 11 space, it's not clear that the Agency would take the 12 affirmative action of forcing the licensee to do 13 something.
14 CHAIR YOUNG: Okay.
15 MS. CURRAN: I think that Mr. Fernandez 16 has made a very good point, and I also think there's 17 different -- well, first of all, I just want to 18 emphasize, I don't think that would change the nature 19 of the analysis that the Staff did. It changes what's 20 done with the information at the end, and each statute 21 has a -- has a value to it in terms of what the 22 ultimate action is.
23 Under the Atomic Energy Act, the value is 24 that the Staff requires the applicant to take some 25 action to make the plant safer. Under the National NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
779 1 Environmental Policy Act, the value is that the Staff 2 discloses to the general public, "This is the nature 3 of the risk, and this is how we're addressing it."
4 And that's also very important because 5 that's the action-forcing part of NEPA. The idea is 6 that if there is public disclosure, then it gives the 7 public and the state and local government officials a 8 political tool for pressing on the Agency to make 9 reforms.
10 So they both have slight -- they're 11 different tools, but much to the same end.
12 CHAIR YOUNG: Thankyouverymuch, both of 13 you.
14 JUDGE ELLEMAN: Now, Ms. Curran, you may 15 have answered the question that I was wanting to ask.
16 Mr. Repka earlier took Dr. Lyman's safety analysis for 17 batch loading of MOX fuel and used a linear 18 extrapolation to come up with a change of several 19 percent in a number of consequences.
20 Did I understand you to say a few minutes 21 ago that you no longer defend that study, that you 22 think things are worse than what Dr. Lyman was using 23 as his assumption?
24 MS. CURRAN: Well, maybe what it is is a 25 question of apples and oranges. Dr. Lyman's study NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
780 1 took the 30 percent assumption and used other 2 assumptions about the characteristics of the fuel and 3 came up --
4 JUDGE ELLEMAN: Yes.
5 MS. CURRAN: -- with an estimate. Of 6 course, when you look at the LTA testing, it's a 7 smaller quantity of plutonium that's being used.
8 JUDGE ELLEMAN: Yes.
9 MS. CURRAN: But there is other factors 10 that are higher -- the release fraction and the timing 11 of the release. And we don't know what the 12 interaction of those factors is. That's an analysis 13 that needs to be done. I don't think we can leap to 14 any conclusions about what the end result would be.
15 Would it be possible for me to let Mr. --
16 Dr. Lyman answer the question, because --
17 JUDGE ELLEMAN: Well, let me rephrase what 18 I was trying to get at, and maybe it'll save you the 19 trouble of trying to do it. I was trying to 20 understand whether Mr. Repka's extrapolation is a fair 21 expression of Dr. Lyman's work. Does it appropriately 22 represent what he believes the risk might be for the 23 four fuel element loading in Catawba?
24 MR. REPKA: Now, let me -- we talked about 25 it at the last hearing -- is the issue of whether you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
781 1 can extrapolate or whether it's proper just to do a 2 linear extrapolation from the batch loading to four 3 elements, and it's linear. I haven't done that 4 calculation. It may not be appropriate, because it 5 depends on things like the position of the LTAs and 6 the core, their burnup, and other issues.
7 So a linear extrapolation may not be 8 proper. I simply haven't done it. But the issue at 9 hand today is whether that study took into account 10 information from VERCOR and other tests that show that 11 release fractions for fission products may be higher 12 for MOX fuel, and it didn't.
13 That study explicitly assumed the release 14 fractions would be the same for every fission product 15 category for both uranium and MOX. The point is that 16 if you did take into account the enhanced release 17 fractions for cesium and other fission product groups 18 that the VERCOR test and other tests seem to indicate, 19 that that would mean the differential consequences of 20 MOX accident versus uranium accident would be worse 21 than what that study predicted.
22 So the linear extrapolation of 1.6 23 percent, or whatever, would actually be somewhat 24 greater if you took into account that. So that was an 25 underestimate by not taking into account the enhanced NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
782 1 release fractions.
2 JUDGE ELLEMAN: Okay. It might be 3 somewhat greater. But do you have any intuitive feel 4 for what the overall impact might be on release if you 5 tried to include all of the factors you're 6 representing to us here today in terms of changed fuel 7 behavior and -- I realize --
8 MR. REPKA: No. I simply haven't done the 9 calculation. And as Ms. Curran said, it would have an 10 impact on the assumptions for evacuation and emergency 11 planning, because the peak releases may occur an hour 12 or more before in the case of MOX fuel, but then that 13 depends on the containment response as well. So it's 14 not that simple. I didn't have an answer at that 15 time.
16 JUDGE ELLEMAN: All right.
17 MR. REPKA: I can't say that it would be 18 greater.
19 JUDGE ELLEMAN: Thank you.
20 MS. CURRAN: I don't have anything to add.
21 CHAIR YOUNG: I'm going to take one stab 22 at something, and then I think we need to move into 23 the next one, and I'll talk about that in a second.
24 Taking Judge Baratta's question earlier 25 about the issue being the adequacy of the database, am NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
783 1 I understanding you correctly to be saying that that's 2 the -- that the questions about whether the LOCA 3 analysis is sufficient to show that there would be no 4 severe accident, or what the consequences would be, 5 what you're saying is -- what you're questioning is 6 the adequacy of the database with regard to those 7 issues. Am I right in understanding that in the same 8 way that Judge Baratta posed that issue earlier?
9 MS. CURRAN: Essentially, yes. It's the 10 lack of information on certain factors that may have 11 an impact on the LOCA analysis, and that, in turn, 12 creates uncertainty about a severe accident.
13 CHAIR YOUNG: Okay. Any more on this one?
14 I suggest that we take 10-minute time 15 periods instead of the 15. We've got one hour left, 16 and the reason I'm saying that is I do have two or 17 three questions for Duke on 13, even though you don't 18 have any desire to say much on it yourself. But I did 19 have a few questions on that that you might then want 20 to respond to. So I want to save some time for that.
21 MS. CURRAN: Do you have questions for 22 BREDL on that? Because with such a limited amount of 23 time, I'd rather just --
24 CHAIR YOUNG: I don't have any questions 25 for BREDL on it. I mean, other than anything you NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
784 1 might say after I get an answer from Duke. And that 2 was on 13, so I just wanted to save enough time to do 3 that.
4 MS. CURRAN: Okay.
5 CHAIR YOUNG: Why don't you go ahead into 6 12, and we'll try to limit you to 10-minute periods on 7 this one. And I hope that maybe the discussion in the 8 last one will move -- make the necessity for this one 9 not be -- not require so much time, make it 10 unnecessary to require so much time.
11 MS. CURRAN: Well, I think the essence of 12 Duke's argument here is that Duke characterizes our 13 contention as a claim that an environmental report 14 must somehow acknowledge and address every uncertainty 15 or research proposal that could relate to an 16 application under review. And that is far from our 17 position.
18 What we've presented to the Licensing 19 Board here is a body of evidence that was put together 20 by the French Safety Agency, which, by the way, is not 21 just a commercial entity; it is the research arm of 22 the French Regulatory Agency that was split off a 23 couple of years ago. The French decided to divide the 24 controlling function from the research function to 25 give the research function more independence.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
785 1 But it's not -- this IRSN agency is part 2 of the French Regulatory Agency. It's the arm of the 3 Agency that does the research. So they have come to 4 the NRC with a coherent analysis of significant gaps 5 in the understanding about the behavior of plutonium 6 fuel in nuclear powerplants, including under design 7 basis accident conditions and severe accident 8 conditions.
9 The standard that the Licensing Board has 10 to apply here is one of reasonableness. Is this an 11 environmental impact that warrants consideration? And 12 the question is whether we've raised a material 13 dispute with Duke about this, whether we've put enough 14 evidence before the Board to show that there is a 15 dispute between the parties that have legal -- has 16 legal relevance, not the ultimate merits determination 17 of whether or not an environmental impact statement 18 should have to address this, but whether this question 19 warrants further inquiry.
20 And we submit that we have -- we have 21 raised a strong inference. Reasonable minds would 22 inquire further as to whether this particular safety 23 issue is -- this issue of environmental risk should be 24 addressed in an environmental impact statement.
25 I don't think I have anything more to add NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
786 1 on that.
2 CHAIR YOUNG: Mr. Repka?
3 MR. REPKA: On Contention 12, the issue, 4 again, is a NEPA issue, severe accident consequence 5 assessment, and what's required. As we explained the 6 last time around, Duke has provided that severe 7 accident assessment in its application, the 8 environmental section. It's based upon the work that 9 DOE did in their SPD EIS, the programmatic work.
10 And it came to a conclusion about the 11 change -- the relative change in consequences that 12 would be the result of the four MOX fuel lead 13 assemblies that would be approved here for a severe 14 accident scenario.
15 So that work has been done. We think that 16 that work is adequate to meet NEPA. NEPA is governed 17 by a rule of reason. It's not a precise quantitative 18 assessment, but, nonetheless, an assessment has been 19 provided that we think provides a realistic assessment 20 -- estimate of changes in severe accident consequences 21 related to this amendment.
22 Now, with respect to the specifics of this 23 contention, it really boils down to the same as the 24 earlier contentions. The first half of it would be 25 that the LOCA analysis is inadequate, and, therefore, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
787 1 there is somehow -- somehow -- an increased 2 probability of a severe accident.
3 Ms. Curran keeps saying that Duke has not 4 shown that it meets Appendix K. That Duke has not 5 done an adequate Appendix K evaluation. That's simply 6 not true. Duke has done an Appendix K evaluation and 7 has considered the factors, including potential 8 ballooning of the M5.clad. Duke's analysis shows that 9 -- LOCA analysis shows that it meets the criteria that 10 -- the NRC criteria.
11 As I said earlier, for M cladding, it 12 includes the conservatism of using the unirradiated 13 properties of the cladding, meaning maximum 14 ballooning, maximum swelling, because at that point 15 there is no -- it hasn't been irradiated, it's maximum 16 ductility because it hasn't been oxidized.
17 Nowhere in this contention is there any 18 basis -- in fact, there's not even a recognition, a 19 citation, a reference to the Appendix K analysis that 20 has been done. There is no showing of a particular 21 problem with it. There simply is this reference to 22 the fact that IRSN has raised some hypothetical 23 questions.
24 That's not an adequate basis without 25 specific reference to the analysis that's been done.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
788 1 I think what we have is not so much a basis. I think 2 what we have is a question, where BREDL doesn't 3 understand what's been done, hasn't really looked at 4 what's been done, and, therefore, says, Hmm, there's 5 a question here." Therefore, there's a dispute. It's 6 inadequate, and I don't think that meets the criteria.
7 However, that's the first half of the 8 equation again here, which is the probability of a 9 LOCA that would exceed the design basis. It's the 10 same issue we saw in Contention 10.
11 The second half of the severe accident 12 assessment is, again, same issue as in Contention 11.
13 What would happen in the severe accident scenario?
14 What is the change in consequences? Again, we have 15 taken a stab at estimating that, based upon the DOE 16 work.
17 Dr. Lyman himself has done an estimate in 18 his earlier paper in 2000. He says that he hasn't 19 taken into account all of these different things. The 20 fact of the matter is in that paper he did include a 21 sensitivity study using higher release fractions for 22 actinides, and that came to the conclusion of a change 23 in consequences of, at most, 1.6 percent related to 24 four MOX fuel lead assemblies.
25 So he has done some work. His results NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
789 1 show that there is no real risk-significant deviation 2 from Duke's own work. And, therefore, simply as with 3 the earlier contentions, not really meaningful of 4 relief that can be granted.
5 He says today that he hasn't done all of 6 these additional calculations of release fractions, 7 and this, that, and the other thing. Well, frankly, 8 if he was going to propose a contention, I would think 9 he would have something a little more concrete than 10 simply to say, "I haven't done the work."
11 But it might lead to greater consequences 12 than I suggested in my earlier sensitivity study. I 13 don't even know how large the difference might be.
14 That's simply not adequate for a contention, 15 particularly in NEPA space where there is no 16 requirement for much more than a reasonable 17 assessment.
18 CHAIR YOUNG: Can you just point me to 19 something quickly? The section of the LAR that --
20 where the Appendix K analysis is.
21 MR. REPKA: The Appendix K analysis is in 22 Section 3.7 of the LAR. And then there is additional 23 discussion of the assumptions and the modeling in the 24 MOX fuel design report, as well as in the MS cladding 25 topical report that we discussed earlier. I can give NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
790 1 you citations in those documents as well if -- but 2 Section 3.7 of the LAR is the LOCA analysis.
3 CHAIR YOUNG: The Framatone and the --
4 which was the third one, the other one?
5 MR. REPKA: The MOX fuel design report 6 would be the second one, and the third one would be 7 the -- I referenced earlier the February 2000 topical 8 report on MS cladding and the NRC safety evaluation 9 report on M5 cladding. That particular document, it's 10 my recollection -- and I'm sure they'll jump up and 11 correct me if I'm wrong -- has particular curves in it 12 related to M and the issue of ballooning.
13 CHAIR YOUNG: Okay. And that last 14 document we have?
15 MR. REPKA: I do not know if you have it.
16 It has certainly been referenced in the prior 17 pleadings.
18 CHAIR YOUNG: Well, it's just a -- for my 19 point of information. You can provide that later if 20 it's -- if you don't have --
21 MR. REPKA: It's in ADAMS. The reference 22 has been given. I know the Staff referred to it in 23 the very first filing.
24 CHAIR YOUNG: Okay. Okay. Then we do.
25 MR. REPKA: Yes. Mr. Nesbit is referring NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
.791 1 me now -- we had referred to Section 3 of the license 2 amendment request. It's reference 13 there in 3 Section 3.9 on page 3-38 is the various Framatone and 4 related topical reports and LOCA analyses. So that's 5 where it does appear. The reference appears in the 6 application.
7 CHAIR YOUNG: Thank you.
8 MR. REPKA: Now, the other thing I was 9 going to say about consequence is we've talked about 10 Dr. Lyman's own earlier work, which really concluded 11 that there's insignificant changes in the results.
12 Another important document to recognize here is that 13 we referred earlier this morning to the fact that IPSN 14 made this presentation of data in 2001, I believe, to 15 -- in the context of the Expert Panel on Source Term 16 -- or 2002.
17 That panel issued a report, ERI/NRC 02-18 202, in October of 2002 that Dr. Lyman referred to in 19 his original Contention 2, I believe, on severe 20 accident consequences.
21 CHAIR YOUNG: Say the numbers again. I 22 know they're there, but --
23 MR. REPKA: All right. It's capital ERI, 24 slash NRC, 02 dash 202, October 2002. That's the 25 report of the Expert Panel on Source Term on high NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
792 1 burnup and MOX fuel.
2 CHAIR YOUNG: Thank you.
3 MR. REPKA: So that was a report issued 4 with full knowledge of the French test results and the 5 issue of severe accident effects of fuel relocation.
6 And that group did not make any substantive changes in 7 estimated total fission products as a result of the 8 information that had been presented based on the 9 VERCOR tests to that group.
10 And Dr. Lyman referenced that in his own 11 filing back last month. So that's another document 12 that's relevant, and I don't think supports the 13 conclusion that there will be significant changes in 14 release fractions, and, therefore, significant changes 15 in the consequences of using four MOX fuel lead 16 assemblies.
17 And I think that's -- the last thing I 18 would say is we have to keep in mind is that we are 19 talking about at this point four lead assemblies, not 20 the full 40 percent core.
21 The bottom line conclusion is, again, 22 there is simply not a sufficient basis for a genuine 23 issue that would lead to some meaningful relief in 24 this case.
25 CHAIR YOUNG: You're saying that support NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
793 1 hasn't been provided. Are you saying that not enough 2 has been provided to warrant further inquiry?
3 MR. REPKA: Certainly in the context of 4 this proceeding, that's true. Not enough has been 5 offered to connect the dots and show that there is an 6 effect on LOCA analysis that would actually affect 7 ECCS performance, that would actually lead to a severe 8 accident because of four lead assemblies, that would 9 actually lead to some meaningful change in dose 10 consequences from that which has already been 11 estimated.
12 Certainly, not enough has been offered.
13 I think it's a bit akin to reading this material and 14 saying, "Hmm, there's an issue that ought to be 15 addressed," without any knowledge of whether it has 16 been addressed or how it's been addressed or any 17 support for the proposition to say if it were 18 addressed, it would actually change some results in 19 some meaningful way.
20 There are many, many things addressed in 21 both the license application and in the environmental 22 report. And I'm sure if you found presentations by 23 IRSN or ACRS or anybody about particular issues, you 24 could always say, "Oh, gee, that should be addressed."
25 And the fact of the matter is if you probe, at least NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
794 1 at some level it may have been addressed.
2 But you -- I think it's certainly 3 incumbent upon the Petitioner at this point to show 4 how that -- how -- some knowledge of what's been done 5 and why that's inadequate.
6 CHAIR YOUNG: Staff?
7 MR. FERNANDEZ: The Staff doesn't have 8 anything to add, other than what was already in our 9 pleading, Your Honor.
10 CHAIR YOUNG: Okay. We're moving right 11 along.
12 Ms. Curran?
13 MS. CURRAN: Okay. I feel like I had to 14 put a stick into a wheel that was going around and 15 around with respect to this Appendix K analysis. Mr.
16 Repka was saying earlier that Duke did an Appendix K 17 analysis, and it was perfectly adequate. And it 18 looked at the issue of the cladding, and there was an 19 analysis of the cladding.
20 But getting back to what -- the clad 21 ballooning. But getting back to what this contention 22 is about, it's about the relationship between clad 23 ballooning with respect to the particular 24 characteristics of the cladding that's going to be 25 used here, in conjunction with the peculiar NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
795 1 characteristics of plutonium MOX fuel, the 2 microstructure of this fuel, and how, in what way it's 3 going to crumble.
4 And the important thing to remember is 5 that the issue of fuel relocation has been 6 intentionally left out of Appendix K, because it was 7 considered to be bounded by the other conservatisms 8 that are included in Appendix K. So there's been no 9 Appendix K analysis of these two factors -- the fuel 10 characteristics and the cladding characteristics and 11 how they interact.
12 There has been an analysis of the cladding 13 characteristics, period. That's what's missing here.
14 That's part of what's missing. That's why Duke can't 15 say, "We did an Appendix K analysis, and it's fine."
16 Another point that I'd like to address is 17 the -- is Mr. Repka's characterization of the report 18 of the Expert Panel on Source Terms, ERI/NRC-02-202, 19 the October 2002 study. Mr. Repka says that report 20 was issued with full knowledge of the results of the 21 VERCOR test.
22 Well, apparently there was a dispute in 23 the panel over the significance of the results of the 24 VERCOR test. So I think this is -- if you look back 25 through the history of what's happened since the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
.(202). 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
796 1 VERCOR test, which was in 1998, it's an iterative 2 process. There is discussion of the results and the 3 significance of the results.
4 And one of -- in our view, one of the very 5 significant discussions that took place was the 6 discussion in October 2003 of what -- not only what is 7 the significance of those test results, but whether --
8 what other information about the characteristics of 9 plutonium fuel and its cladding could be brought to 10 bear to understand better what are the phenomenon here 11 -- phenomena that need to be understood before this 12 license can be issued.
13 Mr. Repka has tried to characterize this 14 whole debate as kind of an academic or speculative 15 inquiry. But we submit that it is not at all, that 16 what IRSN has presented here is evidence that there 17 are actual characteristics of this fuel and this 18 cladding and their interaction that have been 19 observed.
20 They've been observed. It's not 21 speculation. And they're different from the 22 characteristics of uranium fuel and how it relates to 23 cladding.
24 So that, you know, to characterize this as 25 some kind of speculative exercise where we want the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
797 1 NRC to count how many angels can dance on the head of 2 a pin is a real mischaracterization of the nature of 3 the information that's been supplied here.
4 This is information about a design basis 5 accident analysis and why, when it's applied to MOX 6 plutonium fuel, the kind of analysis that is typically 7 done to comply with Appendix K is not going to be 8 sufficient to satisfy the NRC's overall requirement 9 that the safety systems in this plant have to be 10 adequate to cool this core if there's an accident, 11 because not enough is known about what is going to be 12 the behavior of the cladding and the fuel taken 13 together in an accident, in a LOCA.
14 And that, of course, leads to severe 15 accident issues as well as just plain old issues of, 16 can the design basis requirements be complied with?
17 Certainly, we have submitted enough 18 information to warrant further inquiry by this Board 19 in the form of a hearing where we would be allowed to 20 present evidence that -- to make our case that Duke is 21 unable to satisfy the basic safety requirements to get 22 an operating license for this LTA application.
23 JUDGE BARATTA: Let me ask you -- the 24 paragraph to which you refer in Appendix K refers to 25 the impact of those parameters primarily on the gap NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
798 1 conductance, and the gap conductance is obviously a 2 critical issue with respect to the PCT that occurs, 3 because it basically provides the mechanism for the 4 heat eventually to get out of the fuel rod and such.
5 Is there any place else in Appendix K that 6 -- where this ballooning issue would come up that 7 you're required to perform an analysis?
8 MS. CURRAN: If you could bear with us for 9 a moment. Well, that -- that would be the relevant 10 section, the section I referred to. But it's 11 important to also bear in mind that fuel relocation 12 would have an impact on the gap conductance.
13 JUDGE BARATTA: And could it be in a 14 positive sense?
15 MS. CURRAN: We couldn't say.
16 JUDGE BARATTA: Okay. Okay. Thank you.
17 CHAIR YOUNG: Anything more on 12?
18 MS. CURRAN: Just one moment.
19 CHAIR YOUNG: Okay.
20 MS. CURRAN: Again, I would just -- on the 21 issue of fuel relocation and its relation to 22 Appendix K, I think it's helpful to read the document 23 entitled Attachment 4, especially the discussion on 24 page 5, which says that -- it concludes the fuel 25 relocation during a LOCA should be considered an NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
799 1 Appendix K non-conservatism.
2 Certainly, it is sufficient. Now, whether 3 this is a conclusive statement or a dispositive 4 statement by a member of Staff who has authority to 5 make that determination as a regulatory basis, it's 6 certainly enough to put into dispute the question of 7 whether Duke's Appendix K analysis is sufficient in 8 light of the fact that it has not taken into account 9 the issue of fuel relocation.
10 JUDGE BARATTA: Is there a regulatory 11 requirement to do that?
12 MS. CURRAN: To take into account fuel 13 relocation?
14 JUDGE BARATTA: Yes.
15 MS. CURRAN: Well, no, because GSI-92 was 16 dropped. It was decided not to put that into 17 Appendix K in the belief that existing conservatisms 18 in Appendix K would essentially cover it. And now the 19 Staff is concerned that that was not the correct 20 judgment.
21 CHAIR YOUNG: Anything more?
22 MS. CURRAN: No.
23 CHAIR YOUNG: Okay.
24 MR. FERNANDEZ: Your Honor, just one thing 25 on the question that was just asked. I mean, if there NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
800 1 is no current regulatory requirement to do so, then 2 the application does meet the current regulatory 3 requirements. The Staff is working on maybe changing 4 the regulations. That doesn't impact the status of 5 applications that are currently before the Staff.
6 They need to be assessed against the regulatory 7 requirements as they exist today, not as they may 8 exist in the future.
9 CHAIR YOUNG: Anything else?
10 MS. CURRAN: I'd just like to respond to 11 that very briefly. Except Appendix K is I think 12 referred to in 50.46, 10 CFR 50.6, which provides the 13 acceptance criteria for emergency core cooling systems 14 for light water nuclear power reactors.
15 CHAIR YOUNG: 50?
16 MS. CURRAN: 10 CFR 50.46.
17 CHAIR YOUNG: 46.
18 MS. CURRAN: Which was referred to in I 19 think Contention 10.
20 So the question is whether if the -- if 21 the analysis that's required by Appendix K, which is 22 -- if you look at those Appendix K requirements, it 23 says certain factors should be put into an analysis.
24 It doesn't -- it gives some discretion. There is 25 variables that go into that analysis.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
801 1 If that analysis is inadequate to satisfy 2 10 CFR 50.46, then one of the basic regulatory 3 requirements of the Commission for safety of the 4 nuclear reactor isn't met.
5 CHAIR YOUNG: We understand that you have 6 a dispute, and I think I went over some of the issues 7 before, so I'm not going to repeat those.
8 Anything more on 12?
9 Okay. Let me -- as I said before, I had 10 a few questions that I wanted to mainly ask Duke. Do 11 you want to say anything before I do that? You -- 13 12 you said you didn't have that much to say. Okay.
13 My questions are these -- first, what 14 control, if any, does Duke -- what role does Duke have 15 in the transportation itself? And I know there are 16 contractual agreements, and so forth, and I'd like you 17 to address that issue -- the control or relationship 18 of Duke to the actual transportation.
19 Next --
20 MR. REPKA: Could I answer them one at a 21 time? That way -- would that be easier?
22 CHAIR YOUNG: You can. But I'd -- you 23 might want to get an overview of what I'm sort of 24 looking at. Well, they are somewhat severable. Go 25 ahead and answer.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
802 1 MR. REPKA: I think it's easier if I just 2 answer your --
3 CHAIR YOUNG: Sure, go ahead.
4 MR. REPKA: -- question. So the first 5 question is: what role does Duke have in the 6 transportation? The answer is: none. Our only role 7 is to receive the lead assemblies when they arrive at 8 the Catawba station.
9 CHAIR YOUNG: Okay. So that undertaking 10 is solely DOE's.
11 MR. REPKA: Correct.
12 CHAIR YOUNG: Okay. In the basis, the 13 beginning of the basis for the contention, though, 14 there is a reference to your conceding that the 15 shipment and return shipment are related actions whose 16 environmental impacts must be considered. And I don't 17 think you disagreed with that, if I'm remembering 18 correctly.
19 What I understand your main argument to be 20 is that it's the DOE EIS that's relevant, and that's 21 in the hands of DOE. That may be oversimplifying it, 22 but --
23 MR. REPKA: They're related in the sense 24 that obviously the lead assembly application is part 25 of the broader program. But with respect to the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
803 1 shipment itself, it's DOE that would consider that to 2 the extent that it's required to consider that.
3 CHAIR YOUNG: I guess here's my question, 4 and that is if -- if you are conceding that the 5 transportation is a related issue that you need to 6 address in --
7 MR. REPKA: We're not conceding that.
8 We're not conceding that it's a related issue that we 9 need to address. We're conceding that -- we're not 10 conceding anything. But what I would say is -- and 11 what I said is it's part of the program. But there's 12 no requirement that we address it. We -- Duke.
13 CHAIR YOUNG: Just looking back to 5.32, 14 shipment of the polished POU -- plutonium oxide powder 15 is a related activity involving intermodal transport, 16 and so on. If you -- if DOE had not issued its EIS, 17 since you're saying it's a related activity, would you 18 be doing your own on this?
19 MR. REPKA: I don't know, because they did 20 do their EIS, and they have done their supplement 21 analysis. So I don't know, in that scenario, what 22 would be done.
23 CHAIR YOUNG: Are you -- by saying that 24 it's a related activity, are you more or less adopting 25 DOE's as yours here?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
. . 234-4433 (202) WASHINGTON. D.C. 20005-3701 -
www.nealrgross.com
804 1 MR. REPKA: No, I don't believe so. I 2 think we're referencing it simply for information and 3 to assist the reader to know where to find other 4 information where it has been addressed. But it's 5 certainly not our attempt to adopt it, and it's --
6 intent to adopt it, and it's certainly not our view 7 that, as we responded in our filing, BREDL suggested 8 that somehow because we referenced it, therefore, it 9 brings it into the scope of our application and into 10 the scope of this proceeding. And we certainly do not 11 agree with that.
12 And, in fact, a similar argument was made 13 in the DCS case on the fuel fab facility, and that 14 Board did address that. We cited that in our written 15 response and said, "Certainly, a reference by an 16 applicant to another environmental review doesn't 17 bring it within the scope of the first application."
18 CHAIR YOUNG: The reason I was asking the 19 questions is most of your response seems to focus on 20 your argument that BREDL did not -- let's see. BREDL 21 fails to explain, with basis and specificity, what is 22 deficient in the DOE document. And I don't think I 23 found any reference to the particular relationship 24 there that you're making now in response to my 25 questions.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
805 1 And so I guess where I'm headed with this, 2 and what I'm trying to understand here, is you 3 referred to this as a related activity. So normally 4 if you answered you don't know whether you would do 5 your own if DOE's were not done.
6 And I guess this sort of gets to a 7 partially legal/partially factual issue of what you 8 would do in that circumstance, because that in a sense 9 -- if you have a responsibility to do it yourself, if 10 it's not being done by some other entity, then I start 11 thinking in terms of, well, are you adopting DOE's as 12 your own?
13 If you are adopting DOE's as your own, 14 then you sort of are opening yourself up to challenge 15 of that in the same way that your own would be 16 challengeable had -- were you to do your own.
17 Do you understand what I'm saying?
18 MR. REPKA: Yes, I do.
19 CHAIR YOUNG: And that's sort of what I'm 20 getting at here, because obviously if -- the only 21 thing that raises a question is if this were totally 22 separate and there were no question about the 23 relationship, then I think, you know, a good argument 24 could be made at least that we don't have jurisdiction 25 over DOE here.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
806 1 But the relatedness is the real thing on 2 which these questions sort of seem to hinge. And the 3 answer I'm hearing is that you're not sure whether you 4 would or not.
5 MR. REPKA: No. The answer is he raised 6 a scenario that's not before us, which is, what if DOE 7 had not addressed it? It's not before it. DOE did 8 address it. So what we have is a situation where 9 we've referenced the fact that they have done an 10 analysis of this aspect of the total program that they 11 are responsible for.
12 We are not adopting it as our own. We are 13 not bringing it into the scope of this proceeding.
14 What we're doing is this whole program, as we talked 15 about last month, involves many, many pieces.
16 CHAIR YOUNG: Right.
17 MR. REPKA: And what we really have here 18 is a case of tiering, where the various environmental 19 reviews are tiered from the DOE overall program. And 20 we are simply referencing the fact that DOE has done 21 work with respect to those aspects of the program that 22 they are responsible for. I don't think in any way we 23 are bringing it into the scope of this approval that 24 has nothing to do with transportation.
25 Beyond that, I'd say our arguments are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
807 1 very definitely layered. Our first argument is that 2 this is completely -- this issue related to 3 transportation is completely outside the scope of the 4 license application under review. And that remains 5 our position.
6 Then, we go on to say, but even if somehow 7 it weren't, if you really look at the contention, the 8 contention says it has -- that DOE hasn't -- and Duke 9 haven't addressed anything beyond the 1996 PEIS on 10 transportation. And that's simply not true. The 11 supplement analysis is obviously post-9/11, and so 12 it's very much a layered argument.
13 CHAIR YOUNG: Okay. I guess -- and I'm 14 not sure I'm going to get anything more on this, but 15 I guess that all of the questions that I'm asking sort 16 of hinge on whether you are required to consider this 17 as a related activity in your environmental report.
18 And what I may be hearing you say -- tell 19 me if I am or am not, or whether you mean -- whether 20 you're intending to say that you didn't have to -- in 21 sort of the same way that you said you -- Section 3.8 22 was not required, Section -- whatever sections relate 23 to the transportation are not required.
24 MR. REPKA: Well, in this case it's not a 25 section. It's a statement referencing the DOE work.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
808 1 So -- and no, we weren't required to make 2 that statement, and certainly the DOE assessment of 3 transportation issues is not within our scope. And we 4 are not required to address it, and I'd say it as 5 directly as that. We are not required to address it, 6 and the simple reason is because it's part of the DOE 7 program and it's addressed elsewhere.
8 It would really be to have us address it 9 in any scenarios -- us, Duke, address it in the 10 context of the lead assembly application is -- it 11 would seem to me to be kind of like the proverbial 12 tail wagging the dog.
13 I mean, it's really up to DOE to produce 14 the lead assemblies. It's up to Duke to use the 15 assemblies. It wouldn't make sense to have Duke, in 16 the context of using, evaluate all of those other 17 activities that DOE is responsible for.
18 CHAIR YOUNG: Right. But you make 19 reference to the transportation and shipment as a 20 related activity, and that's where all of my questions 21 arise from.
22 MR. REPKA: And, yes, it's related. I 23 would not read legal significance into that to say 24 that that brings it within the scope of this 25 environmental review. That's certainly not the flavor NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005.3701 www.nealrgross.com
809 1 of the statement. That's not the intent, nor could it 2 be in our view. Again, I think we were just really 3 trying to be informative.
4 CHAIR YOUNG: Okay. And my only other 5 question is -- and I'm not sure that I necessarily 6 want to open this up -- but are you aware of any case 7 law on similar relationships between entities where 8 one might be referring to an EIS of another and where 9 the courts have spoken to the relevance of that and 10 how it is to be treated? And --
11 MR. REPKA: Well, certainly, we just --
12 CHAIR YOUNG: -- adoption as opposed to 13 reference? Those types of issues. I think you know 14 what I'm talking about.
15 MR. REPKA: Yes, I do. And we talked 16 about that last month, and we gave you reference to 17 the CEQ regulations on tiering, which talk about 18 different agencies doing --
19 CHAIR YOUNG: bid you give me case law 20 last time? I can't remember.
21 MR. REPKA: I don't recall that we gave 22 you case law where there --
23 CHAIR YOUNG: Okay.
24 MR. REPKA: -- CEQ regulations are 25 applied. But certainly, the concept is well NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
810 1 recognized in different agencies. To avoid redundancy 2 and duplication, we'll do those things that are 3 logically within their sphere.
4 Certainly, in the NRC space -- I don't 5 have case law in front of me -- but you would see 6 similar tiering between work done by TVA and the NRC 7 in the context of reactor licensing, I'm quite 8 certain, because TVA will have certain obligations and 9 the NRC will not necessarily repeat that.
10 CHAIR YOUNG: Okay. Those were the nature 11 of my questions.
12 Ms. Curran, does that cause you to want to 13 say anything? We've got 18 minutes, and we can divide 14 that up. But I would -- let's say five minutes. Do 15 you have anything you want to say on --
16 MS. CURRAN: Yes. Well, first of all, Mr.
17 Repka made an analogy to the tail wagging the dog.
18 And I was thinking my analogy would be to building the 19 fence before you had figured out whether you really 20 wanted a dog, whether -- that's what --
21 (Laughter.)
22 Maybe that's not a great analogy either.
23 But the idea of NEPA is that you don't cut -- if 24 there's a project that has many facets to it, you 25 don't lop off individual facets and look at them in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005.3701 www.nealrgross.com
811 1 isolation without looking at the relationship to the 2 whole. And that's why we are raising it -- this issue 3 in this proceeding.
4 This testing application relates to a 5 bigger program -- that's true. But you can't pick one 6 little piece of it without being satisfied that you've 7 looked at the whole, and that you've understood the 8 impacts of the whole. That's a really basic element 9 of NEPA.
10 CHAIR YOUNG: That reminds me -- and I --
11 let me just ask you two questions, but it does remind 12 me I had two questions for you. One of them is I know 13 you're a party -- or you filed a petition on the 14 export license.
15 MS. CURRAN: Right.
16 CHAIR YOUNG: And I'm wondering what you 17 would not be able to raise in that one that would need 18 to be raised here. That's the first question.
19 The other question is -- and this may be 20 a matter of refreshing my memory -- there was some 21 reference in the last argument to an early discussion 22 with the former Secretary of Energy about the EISs 23 that would come along the way here.
24 And I don't know -- what involvement have 25 you had with DOE on any of the EISs that they have NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
812 1 done? And are you saying that -- is any of your 2 argument here based on any asserted -- I guess my 3 question is, well, you say that it's an overall 4 program, but obviously DOE is the one --
5 MS. CURRAN: Right.
6 CHAIR YOUNG: -- primarily in control. So 7 why should we --
8 MS. CURRAN: I think I understand your 9 question.
10 CHAIR YOUNG: -- consider something here 11 if there are other opportunities for it to be 12 considered that would be more appropriate with --
13 involving DOE directly?
14 MS. CURRAN: Let me answer both your 15 questions. The first question is -- BREDL is a party 16 or has -- is one of the co-petitioners in the 17 plutonium export case. It is not clear to me that the 18 petitioners -- Greenpeace, BREDL, and a group called 19 Charleston Peace -- whether they are going to get a 20 hearing. Their standing has been vigorously opposed 21 by the Department of Energy.
22 There is not a lot of Commission 23 precedence involving export licensing cases where 24 petitioners sought standing on -- based on 25 representational standing. And, of course, since a NEAL R. GROSS .
COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
813 1 lot of the activity takes place overseas, it's kind of 2 a new issue, and it's not clear to me whether or not 3 these petitioners are going to get standing.
4 So this, indeed, may be the only forum --
5 this particular hearing -- in which BREDL is able to 6 get a hearing on the environmental impacts of the 7 shipments.
8 CHAIR YOUNG: Of the shipments for the 9 lead test assemblies, or for any -- I mean, there 10 would be another application assuming there were an 11 application to do batch quantities.
12 MS. CURRAN: Oh, yes. I'm just talking 13 about --
14 CHAIR YOUNG: You're just talking about 15 this --
16 MS. CURRAN: -- this particular upcoming 17 event.
18 MR. REPKA: Actually, batch quantities 19 would be fabricated in the United States at the full 20 fab facilities.
21 MS. CURRAN: Right. It's just the test 22 assemblies that are proposed to be made in France. So 23 that's the answer to the first question.
24 CHAIR YOUNG: Okay. The second one was 25 more the -- your participation --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
814 1 MS. CURRAN: Right.
2 CHAIR YOUNG: -- in the overall --
3 MS. CURRAN: Right. Now, I don't know 4 whether BREDL has filed comments on the previous 5 DOE EISs. There was one in '96 and one in '99. But 6 I think the important thing here is that the NRC is 7 the Agency that has responsibility for licensing this 8 -- or determining whether a license should be issued 9 to Duke for this LTA testing.
10 And that gives the NRC a responsibility 11 for determining whether NEPA has been complied with.
12 We think that it's likely that a court will say the 13 NRC can rely, to some degree, on whatever analysis has 14 been performed by the Department of Energy.
15 But that doesn't absolve the NRC from its 16 responsibility as the licensing agency to make a 17 determination that NEPA has been fully complied with, 18 and that's why we have brought to you our complaint 19 that the supplemental analysis that was submitted by 20 -- prepared by DOE and submitted by Duke in November 21 is not adequate to address the environmental impacts 22 of the shipments of the fuel back and forth to France, 23 including the impacts of a terrorist attack. And --
24 CHAIR YOUNG: And the November 2003 --
25 MS. CURRAN: Yes, 2003. That's the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
815 1 supplemental analysis.
2 CHAIR YOUNG: And you're --
3 MS. CURRAN: Of course, that has some 4 discussion of -- which is quoted on page 24 of the 5 Duke response, that there is -- it's kind of a vague 6 assertion that these reports are going to be in the --
7 whatever DOE does is going to be protected from 8 sabotage.
9 But that doesn't consist of a discussion 10 of the environmental impacts of sabotage or terrorist 11 attacks and how they could be avoided. DOE just says, 12 "We're going to -- we have some measures to protect 13 against it." And what we are looking for is a 14 discussion of the environmental impacts, which we 15 discuss in the contention how they might be 16 exacerbated beyond the scope of what's been looked at 17 in the 1996 EIS.
18 In the 1996 EIS, the DOE said, "Well, 19 those impacts would be embraced by the scope of 20 ordinary accident impact." But what we say in the 21 contention is they could be worse, because a 22 deliberate act of sabotage could cause worse 23 consequences, for instance, than an accident. That 24 needs to be addressed.
25 And also, measures for avoiding or NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
816 1 mitigating those, and not just general assertions such 2 as DOE would modify its methods and systems as 3 appropriate based on a result of this examination to 4 reduce the potential for sabotage or terrorist attacks 5 to be successful, that kind of vague discussion is not 6 adequate in our view to satisfy the requirements of 7 NEPA to look at actual mitigative measures or 8 alternatives.
9 JUDGE BARATTA: Let me ask you, then, who 10 -- suppose, hypothetically, that it was determined 11 that we admitted this and proceeded. Who would then 12 do that analysis?
13 MS. CURRAN: Well, I'm not sure that BREDL 14 cares who does it. Well, it would have to be --
15 JUDGE ARATTA: But wait --
16 CHAIR YOUNG: -- a federal agency. It 17 couldn't be Duke, because --
18 JUDGE BARATTA: It wouldn't be Duke.
19 CHAIR YOUNG: It couldn't be Duke. Duke 20 is only responsible for the first step of an 21 environmental analysis on which the NRC ultimately --
22 well, in the typical NRC licensing case, the applicant 23 does the first -- takes the first shot essentially at 24 an environmental analysis. And then the NRC relies on 25 that for preparation of the environmental impact NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
817 1 statement, which is the government's responsibility.
2 And that's addressed in the -- I can't 3 remember the LBP number, but in the Claiborne 4 Enrichment Center case, the Licensing Board addressed 5 the relationship between the Staff and the applicant 6 in performing a NEPA analysis.
7 The applicant goes ahead, prepares an 8 environmental report, but the staff has an independent 9 obligation to take that analysis, turn it into a 10 defensible environmental impact statement, and the 11 Staff has the burden of defending that environmental 12 impact statement. And ultimately the Agency bears 13 responsibility for that EIS.
14 Now, whether or not the legwork is done by 15 the NRC staff or the DOE staff, it's our position that 16 the NRC, as the licensing agency, has ultimate 17 responsibility for making sure that this license is 18 supported by an adequate EIS.
19 CHAIR YOUNG: We're running out of time.
20 There are all sorts of sort of legal relationship 21 issues that are -- that I'm not altogether clear 22 about. But would it be safe to say that if you were 23 found to have standing, and got a contention in an 24 export license case, that you would have no further 25 interest in this one? And that you're trying to sort NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
818 1 of cover your bases to make sure that you don't fall 2 through the cracks? I'm --
3 MS. CURRAN: Yes. I think that's fair to 4 say. And what we would hope to see is that they'd be 5 consolidated somehow. We don't -- we wouldn't want to 6 waive our right to a hearing in either case unless we 7 were assured of a hearing in the other. But certainly 8 we don't want to litigate it twice.
9 CHAIR YOUNG: Do you have anything to say 10 about the questions that I was asking Mr. Repka 11 earlier about the relationship between Duke and DOE on 12 the environmental analysis of the transportation?
13 MS. CURRAN: I don't think that the 14 question of what -- Duke's position here about what 15 its responsibility is is kind of a side issue to us, 16 because the DOE has already -- the applicant's role is 17 important in a case where the government hasn't yet 18 done its thing, hasn't --
19 CHAIR YOUNG: Well, my -- let me just 20 interject here, because we are running out of time.
21 MS. CURRAN: Okay.
22 CHAIR YOUNG: Who would you have us direct 23 -- if we were to admit this, who would you have us 24 direct anything we said to? DOE? Because DOE is not 25 before us, and that's -- so if you're saying --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 2344433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
819 1 MS. CURRAN: Well, you could say we're not 2 going to issue a license to this facility unless 3 there's an adequate EIS. And then, the NRC and the 4 DOE could work with them to prepare it.
5 They are probably -- I would imagine there 6 is some provision that they behave as cooperating 7 agencies on this, and they would work out some kind of 8 an arrangement. But your decision as to the adequacy 9 of the EIS would govern whether this license is 10 issued.
11 CHAIR YOUNG: Can I just ask you very 12 quickly -- the Staff and Duke -- do you -- can you 13 just say any -- can you say anything about this 14 falling through the cracks issue? The relationship 15 between the export license case and this case?
16 If there's -- if standing, for example, is 17 not found in the export license case, is it -- this 18 maybe needs to go more to the Staff, but I want to 19 hear what you have to say, too, Mr. Repka. Would you 20 go so far as to say that the petitioners simply have 21 no right or means to question the EIS on this?
22 MR. REPKA: It's our position that there's 23 no -- the issue of transportation is immaterial to 24 this case, and they have no ability in this forum, in 25 this context, to address that issue. And that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
820 1 conclusion, in our view, is totally independent of the 2 outcome of the NRC's case on the export application, 3 whether or not BREDL is granted the right to intervene 4 in that case.
5 Ultimately, that's irrelevant. If they 6 are in, or they're not in, it doesn't matter. It's 7 still not an issue in this case. The responsibility 8 is fundamentally a DOE one.
9 And just to provide a little perspective 10 on these shipments, the Department of Energy to -- in 11 order to make these shipments also needs to do that in 12 concert with the Department of Defense, the Department 13 of Commerce, the State Department --
14 CHAIR YOUNG: Just to cut -- because we're 15 running out of time. I can understand that -- let's 16 say the '96 document was done. The November 2003 17 document -- do you -- and I want to ask the Staff this 18 also. Are you -- a lot of times argument will be 19 made, "Well, this is not the proper forum," or "this 20 is not the proper method." Are you -- what would you 21 say would be the appropriate way for REDL to 22 challenge the November 2003 document?
23 MR. REPKA: At the Department of Energy, 24 by whatever mechanism is available there, and if not 25 there then in federal court.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON. D.C. 20005-3701 www.nealrgross.com
821 1 CHAIR YOUNG: And is there a separate way 2 to do.that than -- with regard to the transportation 3 than the --
4 MR. REPKA: Well, certainly the --
5 CHAIR YOUNG: You're saying the statements 6 to DOE apart -- separate and apart from the export 7 license, you're just saying submit statements on --
8 comments on that portion of the EIS to DOE directly.
9 MR. REPKA: Correct. Although -- but I 10 don't know what the process was or is at the 11 Department of Energy, nor would I provide advice to 12 BREDL. My point, though, is that's a DOE document.
13 And if they have a problem with it, they need to 14 challenge it at DOE or in the federal courts.
15 CHAIR YOUNG: And your references to it 16 are merely informative; they're not required?
17 MR. REPKA: That's correct. I mean, you 18 know -- and, again, part of the focus of our response 19 was even if you did consider it somehow by some reason 20 that we can't conceive of in this forum, there is 21 still nothing there. And it still raises an issue 22 which the Commission has said is beyond the scope of 23 its NEPA responsibilities when it talks about 24 terrorism. So it's in that context that we raise --
25 we discuss it in our response.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
822 1 CHAIR YOUNG: Okay. We're going to have 2 to wrap up. Staff, something quickly? And then, Ms.
3 Curran, we'll let you reply, and then we're going to 4 have to go. So, Mr. Fernandez? Ms. Uttal?
5 MR. FERNANDEZ: We have nothing to add, 6 Your Honor.
7 CHAIR YOUNG: Okay. Well, where do you 8 think they should -- do you agree with Duke that BREDL 9 should take their comments --
10 MR. FERNANDEZ: If their argument is about 11 the sufficiency and the adequacy of what the 12 Department of Energy has done to date, the Board and 13 the NRC is in no position to tell the Department of 14 Energy how to conduct is NEPA business. And it should 15 be dealt with at the Department or with the Federal 16 Court of Appeals.
17 But this Board is in no position to grant 18 the remedy that would satisfy BREDL in making the DOE 19 redo their environmental impact statement. I mean, 20 the Commission, as a sister agency, can't tell the DOE 21 what to do.
22 CHAIR YOUNG: So, well, in the export 23 license case it can. But so you're saying -- you 24 agree with Duke that this -- this portion of the 25 environmental report that refers to transportation in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005.3701 www.nealrgross.com
823 1 the DOE EIS on that, you are saying that that's just 2 -- it wasn't necessary, didn't need to be in there.
3 MR. FERNANDEZ: Correct.
4 CHAIR YOUNG: Okay. Anything further from 5 you?
6 MS. CURRAN: Well, I just refer the Board 7 back to the National Environmental Policy Act, which 8 provides that in taking a major federal action that 9 would have a significant impact on the human 10 environment the Agency that takes this action has to 11 either prepare an environmental impact statement or an 12 environmental assessment. In other words, comply with 13 the requirements of NEPA.
14 So that the statute imposes on the NRC an 15 obligation to comply with NEPA that I don't think can 16 be avoided by saying another agency is going to do 17 this, and we are going to -- we are going to issue a 18 license without expressing any opinion or reaching any 19 judgment on whether there was an adequate NEPA 20 analysis to support our licensing action. That's our 21 position.
22 CHAIR YOUNG: You're saying -- if I 23 understand it, you're saying NRC has an independent 24 responsibility to look into the environmental impacts 25 of the transportation, and that applies -- whoever is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
824 1 in charge of the transportation, because you're 2 contending that it's related.
3 MS. CURRAN: Exactly.
4 CHAIR YOUNG: Okay.
5 MS. CURRAN: It's a related action that 6 falls within the scope of the NEPA analysis that has 7 to be done by the NRC here.
8 CHAIR YOUNG: Do you have anything 9 further?
10 MR. FERNANDEZ: One last thing. Even if 11 what Ms. Curran said today we took all to be true, the 12 one subject matter that she complains of in her 13 contention, that BREDL complains of, it's terrorism 14 with regards to NEPA. And we all know that the 15 Commission has already decided that issue.
16 So even if we were to decide, yes, these 17 are connected actions required to be analyzed in the 18 same EIS by NEPA, we would have to then go on to 19 address what she is actually complaining about, which 20 is an issue that the Commission has said that under 21 its own regulations and interpretation of the statute 22 is not something that -- it will be addressed in our 23 environmental reviews pursuant to that statutory 24 authority.
25 CHAIR YOUNG: Okay. And actually, he --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE.. N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
825 1 I think he sort of made a point here. I'm looking at 2 your footnote. You're distinguishing it by saying 3 that DOE and not NRC is responsible. And having 4 undertaken to evaluate -- I'm reading from your 5 footnote 4, having undertaken to evaluate these 6 impacts, DOE is subject to review for the 7 reasonableness of its analysis, that's sort of 8 different than what you were saying before.
9 So your terrorism distinction I'm not --
10 you know, you have one less thought to impart on that, 11 because that -- that sort of knocks down what you said 12 before. I mean, you -- I'm not sure that you can say 13 both. If you're directing it to NRC, and the only 14 distinction with the terrorism rulings that the 15 Commission has made is that DOE is the one that has 16 done it, and we can't tell DOE what to do in this 17 case, then I think we -- Mr. Fernandez may have a 18 point that your distinction with the terrorism ruling 19 sort of goes away.
20 MS. CURRAN: Well, that could be. I mean, 21 that's certainly a good argument. I also think -- I 22 said this before in the last argument, that in the end 23 the reasonableness of these two positions -- the 24 position taken by DOE and the position taken by the 25 NRC -- may wind up in the courts. And that it would NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234.4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
826 1 be better to -- to follow the DOE's lead in this 2 respect and do the broader analysis, especially if 3 Duke is in the hurry that it seems to be in.
4 CHAIR YOUNG: We are going to have to go.
5 I think that just one thing needs to be said, and that 6 is that we're limited, obviously, by the legal 7 authority that we have. And the terrorism rulings 8 have been made by the Commission. DOE is not before 9 us. I don't know what's going to happen down the 10 line, but I can't think of anything else.
11 Do either of you have any more questions?
12 I can't think of anything else we want to know from 13 you, unless there's some last thing. I think we 14 probably need to adjourn for today and just look 15 forward to seeing each other next Wednesday on the 16 security issues.
17 JUDGE BARATTA: Just bring your snowshoes 18 because they keep getting snow.
19 CHAIR YOUNG: All right. It's been a 20 pleasure to spend the day with you. We're adjourned.
21 (Whereupon, at 5:02 p.m., the proceedings 22 in the foregoing matter were adjourned.)
23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com
CERTIFICATE This is to certify that the attached proceedings before the United States Nuclear Regulatory Commission in the matter of:
Name of Proceeding: Duke Energy Corporation Catawba Nuclear Station Docket Number: 50-413/414-OLA; ASLBP No. 03-815-03-OLA Location: Charlotte, NC were held as herein appears, and that this is the original transcript thereof for the file of the United States Nuclear Regulatory Commission taken by me and, thereafter reduced to typewriting by me or under the direction of the court reporting company, and that the transcript is a true and accurate record of the foregoing proceedings.
Rebecca Davis Official Reporter Neal R. Gross & Co., Inc.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com