Attachment - VEGP U3 Amendment 163 (LAR-19-007)
ML19220B219
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/05/2019
From:
NRC/NRO/DLSE
To:
Southern Nuclear Operating Co
References
LAR 19-0097, EPID L-2019-LLA-0105
Download: ML19220B219 (8)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 163 TO FACILITY COMBINED LICENSE NO. NPF-91 DOCKET NO.52-025 Replace the following pages of the Facility Combined License No. NPF-91 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-91 REMOVE INSERT 7 7 Appendix C to Facility Combined License No. NPF-91 REMOVE INSERT C-459 C-459 C-460 C-460 C-461 C-461 C-462 C-462 C-463 C-463 C-478h C-478h

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 163, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 163

Table E.3.9-3 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 848 E.3.9.03.00.02 3.2 The means exists for 3.2 A test will be performed of 3.2 Communications are communications from the control the communications capabilities established from the control room, TSC, and EOF to the NRC from the control room, TSC and room, TSC, and EOF to the headquarters and regional office EOF to the NRC, including NRC headquarters and regional EOC, including establishment of ERDS. office EOC. The access port for the Emergency Response Data ERDS successfully completed a System (ERDS) between the transfer of data to the NRC onsite computer system and the Operations Center.

NRC Operations Center. [F.1.f]

E.3.9.4 Not used E.3.9.5 Emergency Facilities and Equipment Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 849 E.3.9.05.01.01 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.1 The TSC has at least technical support center (TSC) TSC and OSC will be performed, 2,175 square feet of floor space.

and an onsite operations support including a test of the center (OSC). [H.1] capabilities.

850 Not used.

851 Not used.

852 E.3.9.05.01.04 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.4 The TSC is located within technical support center (TSC) TSC and OSC will be performed, the protected area, and no major and an onsite operations support including a test of the security barriers exist between center (OSC). [H.1] capabilities. the TSC and the control room.

C-459 Amendment No. 163

Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 853 E.3.9.05.01.05 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.5 The OSC is located in the technical support center (TSC) TSC and OSC will be performed, Maintenance Support Building.

and an onsite operations support including a test of the center (OSC). [H.1] capabilities.

854 Not used.

855 E.3.9.05.01.07 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.7 A reliable and backup technical support center (TSC) TSC and OSC will be performed, electrical power supply is and an onsite operations support including a test of the available for the TSC.

center (OSC). [H.1] capabilities.

856 E.3.9.05.01.08 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.8 Controls and displays technical support center (TSC) TSC and OSC will be performed, exist in the TSC to control and and an onsite operations support including a test of the monitor the status of the TSC center (OSC). [H.1] capabilities. ventilation system including heating and cooling, and the activation of the HEPA and charcoal filter system upon detection of high radiation in the TSC.

857 Not used.

858 Not used.

E.3.9.6 Accident Assessment Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 859 Not used.

C-460 Amendment No. 163

Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 860 Not used.

861 Not used.

C-461 Amendment No. 163

Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 862 E.3.9.06.00.04 6.4 The means exists to acquire 6.4 A test will be performed to 6.4 The following parameters and evaluate meteorological verify the ability to access are displayed in the TSC and information. [I.5] meteorological information in control room:

the TSC and control room.

  • Wind speed (at 10 and 60 meters)
  • Wind direction (at 10 and 60 meters)
  • Standard deviation of horizontal wind direction (at 10 meters)
  • Vertical temperature difference (between 10 and 60 meters)
  • Ambient temperature (at 10 meters)
  • Dew-point temperature (at 10 meters)
  • Precipitation (at the tower base) 863 Not used.

C-462 Amendment No. 163

Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 864 Not used.

E.3.9.7 Protective Response Table E.3.9-7 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 865 Not used.

C-463 Amendment No. 163

E.3.9.9 Implementing Procedures Table E.3.9-9 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 873 Not used.

E.3.10 Backfill ITAAC Table E.3.10-1 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Design Commitment Inspections, Tests, Analyses Acceptance Criteria 874 E.2.5.04.05.05.01 Backfill material under Seismic Required testing will be A report exists that documents Category 1 structures is installed to performed during placement of that the backfill material under meet a minimum of 95 percent the backfill materials. Seismic Category 1 structures modified Proctor compaction. meets the minimum 95 percent modified Proctor compaction.

875 E.2.5.04.05.05.02 Backfill shear wave velocity is Field shear wave velocity A report exists and documents greater than or equal to 1,000 fps at measurements will be performed that the as-built backfill shear the depth of the NI foundation and when backfill placement is at the wave velocity at the NI below. elevation of the bottom of the foundation depth and below is Nuclear Island foundation and at greater than or equal to finish grade. 1,000 fps.

C-478h Amendment No. 163