Attachment - VEGP U4 Amendment 161 (LAR-19-007)
ML19220B683
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/05/2019
From:
NRC/NRO/DLSE
To:
Southern Nuclear Operating Co
Patel C
Shared Package
ML19213A288 List:
References
LAR 19-007, EPID L-2019-LLA-0105
Download: ML19220B683 (14)


Text

ATTACHMENT TO LICENSE AMENDMENT NO. 161 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-92 REMOVE INSERT 7 7 Appendix C to Facility Combined License No. NPF-92 REMOVE INSERT C-459 C-459 C-461 C-461 C-462 C-462 C-465 C-465 C-466 C-466 C-467 C-467 C-468 C-468 C-469 C-469 C-470 C-470 C-470a C-470a C-471 C-471 C-476 C-476

(7) Reporting Requirements (a) Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b) SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 161, are hereby incorporated into this license.

(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a) Environmental Qualification Program implemented before initial fuel load; (b) Reactor Vessel Material Surveillance Program implemented before initial criticality; (c) Preservice Testing Program implemented before initial fuel load; (d) Containment Leakage Rate Testing Program implemented before initial fuel load; (e) Fire Protection Program

1. The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7 Amendment No. 161

E.3.9.4 Not used E.3.9.5 Emergency Facilities and Equipment Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 849 Verified on VEGP Unit 3 850 Not used.

851 E.3.9.05.01.03 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.3 The plant parameters technical support center (TSC) TSC and OSC will be performed, listed in UFSAR Table 7.5-1, and an onsite operations support including a test of the Post-Accident Monitoring center (OSC). [H.1] capabilities. System, can be retrieved and displayed in the TSC.

852 E.3.9.05.01.04 5.1 The licensee has established a 5.1 An inspection of the as-built 5.1.4 The TSC is located within technical support center (TSC) TSC and OSC will be performed, the protected area, and no major and on onsite operations support including a test of the security barriers exist between center (OSC). [H.1] capabilities. the TSC and the control room.

853 Verified on VEGP Unit 3 854 Not used.

855 Verified on VEGP Unit 3 856 Verified on VEGP Unit 3 857 Not used.

858 E.3.9.05.02.02 5.2 The licensee has established 5.2 An inspection of the EOF 5.2.2 The plant parameters an emergency operations facility will be performed, including a listed in UFSAR Table 7.5-1, (EOF). [H.2] test of the capabilities. Post-Accident Monitoring System, can be retrieved and displayed in the EOF.

C-459 Amendment No. 161

E.3.9.6 Accident Assessment Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 859 Not used.

860 Not used.

861 Not used.

862 E.3.9.06.00.04 6.4 The means exists to acquire 6.4 A test will be performed to 6.4 The following parameters and evaluate meteorological verify the ability to access are displayed in the TSC and information. [I.5] meteorological information in control room:

the TSC and control room.

  • Wind speed (at 10 and 60 meters)
  • Wind direction (at 10 and 60 meters)
  • Standard deviation of horizontal wind direction (at 10 meters)
  • Vertical temperature difference (between 10 and 60 meters)
  • Ambient temperature (at 10 meters)
  • Dew-point temperature (at 10 meters)
  • Precipitation (at the tower base)

C-461 Amendment No. 161

Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 863 Not used.

864 Not used.

C-462 Amendment No. 161

E.3.9.8 Exercises and Drills Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 870 Not used.

C-465 Amendment No. 161

Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria C-466 Amendment No. 161

Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria C-467 Amendment No. 161

Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria C-468 Amendment No. 161

Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria C-469 Amendment No. 161

Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria C-470 Amendment No. 161

Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria C-470a Amendment No. 161

Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 871 Not used.

872 Not used.

C-471 Amendment No. 161

E.3.9.9 Implementing Procedures Table E.3.9-9 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Program Commitment Inspections, Tests, Analyses Acceptance Criteria 873 Not used.

E.3.10 Backfill ITAAC Table E.3.10-1 Inspections, Tests, Analyses, and Acceptance Criteria No. ITAAC No. Design Commitment Inspections, Tests, Analyses Acceptance Criteria 874 E.2.5.04.05.05.01 Backfill material under Seismic Required testing will be A report exists that documents Category 1 structures is installed to performed during placement of that the backfill material under meet a minimum of 95 percent the backfill materials. Seismic Category 1 structures modified Proctor compaction. meets the minimum 95 percent modified Proctor compaction.

875 E.2.5.04.05.05.02 Backfill shear wave velocity is Field shear wave velocity A report exists and documents greater than or equal to 1,000 fps at measurements will be performed that the as-built backfill shear the depth of the NI foundation and when backfill placement is at the wave velocity at the NI below. elevation of the bottom of the foundation depth and below is Nuclear Island foundation and at greater than or equal to finish grade. 1,000 fps.

C-476 Amendment No. 161