ATTACHMENT TO LICENSE AMENDMENT NO. 161 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Combined License No. NPF-92 REMOVE INSERT 7

7 Appendix C to Facility Combined License No. NPF-92 REMOVE INSERT C-459 C-459 C-461 C-461 C-462 C-462 C-465 C-465 C-466 C-466 C-467 C-467 C-468 C-468 C-469 C-469 C-470 C-470 C-470a C-470a C-471 C-471 C-476 C-476

(7)

Reporting Requirements (a)

Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).

(b)

SNC shall report any violation of a requirement in Section 2.D.(3),

Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.

(8)

Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 161, are hereby incorporated into this license.

(9)

Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).

(10)

Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:

(a)

Environmental Qualification Program implemented before initial fuel load; (b)

Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)

Preservice Testing Program implemented before initial fuel load; (d)

Containment Leakage Rate Testing Program implemented before initial fuel load; (e)

Fire Protection Program 1.

The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7

Amendment No. 161

C-459 Amendment No. 161 E.3.9.4 Not used E.3.9.5 Emergency Facilities and Equipment Table E.3.9-5 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria 849 Verified on VEGP Unit 3 850 Not used.

851 E.3.9.05.01.03 5.1 The licensee has established a technical support center (TSC) and an onsite operations support center (OSC). [H.1]

5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.

5.1.3 The plant parameters listed in UFSAR Table 7.5-1, Post-Accident Monitoring System, can be retrieved and displayed in the TSC.

852 E.3.9.05.01.04 5.1 The licensee has established a technical support center (TSC) and on onsite operations support center (OSC). [H.1]

5.1 An inspection of the as-built TSC and OSC will be performed, including a test of the capabilities.

5.1.4 The TSC is located within the protected area, and no major security barriers exist between the TSC and the control room.

853 Verified on VEGP Unit 3 854 Not used.

855 Verified on VEGP Unit 3 856 Verified on VEGP Unit 3 857 Not used.

858 E.3.9.05.02.02 5.2 The licensee has established an emergency operations facility (EOF). [H.2]

5.2 An inspection of the EOF will be performed, including a test of the capabilities.

5.2.2 The plant parameters listed in UFSAR Table 7.5-1, Post-Accident Monitoring System, can be retrieved and displayed in the EOF.

C-461 Amendment No. 161 E.3.9.6 Accident Assessment Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria 859 Not used.

860 Not used.

861 Not used.

862 E.3.9.06.00.04 6.4 The means exists to acquire and evaluate meteorological information. [I.5]

6.4 A test will be performed to verify the ability to access meteorological information in the TSC and control room.

6.4 The following parameters are displayed in the TSC and control room:

  • Wind speed (at 10 and 60 meters)
  • Wind direction (at 10 and 60 meters)
  • Standard deviation of horizontal wind direction (at 10 meters)
  • Vertical temperature difference (between 10 and 60 meters)
  • Ambient temperature (at 10 meters)
  • Dew-point temperature (at 10 meters)
  • Precipitation (at the tower base)

C-462 Amendment No. 161 Table E.3.9-6 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria 863 Not used.

864 Not used.

C-465 Amendment No. 161 E.3.9.8 Exercises and Drills Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria 870 Not used.

C-466 Amendment No. 161 Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria

C-467 Amendment No. 161 Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria

C-468 Amendment No. 161 Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria

C-469 Amendment No. 161 Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria

C-470 Amendment No. 161 Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria

C-470a Amendment No. 161 Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria

C-471 Amendment No. 161 Table E.3.9-8 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria 871 Not used.

872 Not used.

C-476 Amendment No. 161 E.3.9.9 Implementing Procedures Table E.3.9-9 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Program Commitment Inspections, Tests, Analyses Acceptance Criteria 873 Not used.

E.3.10 Backfill ITAAC Table E.3.10-1 Inspections, Tests, Analyses, and Acceptance Criteria No.

ITAAC No.

Design Commitment Inspections, Tests, Analyses Acceptance Criteria 874 E.2.5.04.05.05.01 Backfill material under Seismic Category 1 structures is installed to meet a minimum of 95 percent modified Proctor compaction.

Required testing will be performed during placement of the backfill materials.

A report exists that documents that the backfill material under Seismic Category 1 structures meets the minimum 95 percent modified Proctor compaction.

875 E.2.5.04.05.05.02 Backfill shear wave velocity is greater than or equal to 1,000 fps at the depth of the NI foundation and below.

Field shear wave velocity measurements will be performed when backfill placement is at the elevation of the bottom of the Nuclear Island foundation and at finish grade.

A report exists and documents that the as-built backfill shear wave velocity at the NI foundation depth and below is greater than or equal to 1,000 fps.