|
---|
Category:License-Operator
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22147A1882022-04-13013 April 2022 04 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis 2024-09-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22147A1882022-04-13013 April 2022 04 Public Forms ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18045A4902017-06-15015 June 2017 2017-06 - Final Retake Written Exam Outlines ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms 0CAN051701, Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.2017-05-0303 May 2017 Response to Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. 2024-09-09
[Table view] |
Text
1448 S.R. 333 Russellville,AR 72802 Tel 479-858-5000 September 19,2005 RER-05-00027 Mr. Mark Haire, Chief Examiner U.S. Nuclear Regulatory Commission 61 1 Ryan Plaza Drive, Suite 400 Arlington, TX 7601 1-8064
SUBJECT:
initial License -Written Examination Results for ANO, Unit 1 (B&W)
Dear Mr. Haire,
The written examination results for the Initial License Written Examination administered on September 9, 2005, are complete. All ES-403 required forms and attachments are enclosed.
The examination analysis and post-examination review caused two changes to the examination. Question number 16 contained two correct answers; therefore credit was given to candidates who chose either answer. Question number 73 did not have a correct answer and therefore was dropped from the examination totals.
There was one examination failure.
An examination review that included a discussion of missed questions was conducted with all candidates. There are no requested appeals of the examination grading from the candidates.
All examination materials shall be withheld from public disclosure until after examination administration is complete. Please call me at 479-858-6844 if you have any questions.
Sincerely,
@Jb=
Randal K. Martin Facility Representative Supervisor, Unit One Operations Training Arkansas Nuclear One Attachments cc w/o attachments: Sherrie Cotton Tom Mayfield Bob Byford Brad Berryman Steve Pullin John Cork Andrew Clinkingbeard Dan Smith Dale James ANO-DCC CMS File
A N 0 Unit 1 2005 RO/SRO License Exam Analysis
AN0 Unit 1 2005 RO/SRO License Exam Analysis Tot A's Tot B s Tot C's Tot D's 75 17 22 23 13 100 22 30 31 17
2005 ANO NRC RO/SRO Written Examination Analysis and Post-Exam Comments
- 2 RO and SRO QID #0324 8/13 missed (61.54%), all chose C The question gives conditions that place RCS subcooling margin as inadequate.
Thus, HPI flow can not be throttled as in answer C. The wording of the RCS pressure condition states pressure rising rapidly and the candidates assumed that subcooling margin would soon be restored. However, per the rules of examination administration the candidates should only assume the conditions as given and not how they would be in the future. No change to the key was made. Although the question is technically correct as written, we will revise this question prior to further use.
- 16 RO and SRO QID #0554 (RO Tier 1 Group 1) 10/13 missed (76.92%), all chose C Following further review of the reference material, it was determined there are two correct answers to this question, A and C. The question reference, 1203.028 step 10.A, refers to the primary reason for slowly restoring SW to the DH cooler (i.e., water hammer), but it also refers to thermal shock as a secondary concern in the note. Credit will therefore be given to all who chose A or C. The question will be corrected prior to future use.
- 73 RO and SRO QID #0579 (RO Tier 3)
After class review of the exam, it was determined that there was no correct answer due to a typo. The typo was in the correct answer C which states HPI vs. the system in the reference, 1202.010 step 13, which is LPI. The question was therefore dropped from the exam. The question will be corrected prior to future use.
- 82 SRO QID #0589 4/5 missed (80.0%), 2 chose A, one each chose B and C The distribution of incorrect answers leads us to believe the question does not have any construction problems. We also believe there are no training deficiencies.
- 83 SRO QID #0590 3/5 missed (60.0%), 2 chose C, one chose D The distribution of incorrect answers leads us to believe the question does not have any construction problems. We also believe there are no training deficiencies.
- 94 SRO QID #0601 (SRO Tier 3)
No misses, however, a comment was made on this question during the exam. The comment suggested that since the Tech Spec 3.2.4, Required Action A.1.2.2, states 2%,
then both C and D are correct. Answer C was listed as the correct answer as the QPT given exceeds the limit by 3% and 3 x 2 = 6. However, answer D is also correct since 8% is greater than 6%. The question will be corrected prior to future use.