Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.ML20040D032 |
Person / Time |
---|
Site: |
North Anna |
---|
Issue date: |
12/16/1981 |
---|
From: |
FRANKLIN INSTITUTE |
---|
To: |
NRC |
---|
Shared Package |
---|
ML20039A822 |
List: |
---|
References |
---|
CON-NRC-03-79-118, CON-NRC-3-79-118, RTR-NUREG-0737, RTR-NUREG-737, TASK-***, TASK-TM IEB-79-01B, IEB-79-1B, RFI-C5257-520, NUDOCS 8201290516 |
Download: ML20040D032 (14) |
|
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20101E5561995-08-31031 August 1995 TER on IPE Submittal Human Reliability Analysis, 940831 Draft Rept & 950831 Final Rept ML20101E2031995-08-31031 August 1995 TER of Plant IPE Back-End Submittal, Final Rept ML20101E1491995-08-31031 August 1995 TER on Individual Plant Exam Front End Analysis ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML20078B1551994-09-30030 September 1994 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,North Anna Power Station Units 1 & 2 ML20045D5891993-06-30030 June 1993 Trip Rept:Onsite Analysis of Human Factors of Event at North Anna 2 on 930416,Disabling Afs During Reactor Trip Recovery. ML20056C2041993-04-30030 April 1993 Pump & Valve IST Program,North Anna Power Station,Units 1 & 2, TER ML20116A3081992-10-31031 October 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the North Anna Nuclear Power Plants ML20091P3811992-01-31031 January 1992 Technical Evaluation Rept on Second 10-Yr Inservice Insp Program & Plan:Virginia Electric & Power Co,North Anna Power Station,Unit 1 ML20064A9721990-09-24024 September 1990 Technical Evaluation Rept,North Anna Power Station Units 1 & 2 Station Blackout Evaluation ML20214Q3811987-04-30030 April 1987 Conformance to Generic Ltr 83-28 Item 2.2.1 - Equipment Classification for All Safety-Related Components:North Anna 1 & 2, Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML20211N8071986-05-31031 May 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Indian Point 2,Kewaunee,North Anna 1 & 2 & Prairie Island 1 & 2 ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20128A5121985-05-14014 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities,' for North Anna Power Station,Units 1 & 2 ML20151K7491985-03-22022 March 1985 Masonry Wall Design,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20104B9571985-01-31031 January 1985 Conformance to Reg Guide 1.97,North Anna Power Station Units 1 & 2 ML20100F8811984-03-29029 March 1984 Technical Evaluation Rept on Seven Main Transformer Failures at North Anna Power Station,Units 1 & 2 ML20079Q6361983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20076D1811983-03-18018 March 1983 RETS Implementation (A-2), Technical Evaluation Rept ML20071M5291983-02-22022 February 1983 Control of Heavy Loads (C-10),Virginia Electric Power Co, North Anna Power Station Units 1 & 2, Draft Technical Evaluation Rept ML20076B6451982-09-27027 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements,North Anna Unit 1, Technical Evaluation Rept ML20083L7801982-09-17017 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20023A4761982-08-0404 August 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys (B-24), Technical Evaluation Rept ML20027D2191982-07-31031 July 1982 Adequacy of Station Electric Distribution Sys Voltages, North Anna Power Station,Units 1 & 2. ML20052A7291982-03-15015 March 1982 PWR Main Steam Line Break W/Continued Feedwater Addition, Vepco Units 1 & 2, Request for Addl Info ML20041A3081981-12-31031 December 1981 Technical Evaluation of Licensee Response to NUREG-0737 Item II.B.2,Design Review of Plant Shielding. ML20039A8211981-12-16016 December 1981 Equipment Environ Qualification Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20040D0321981-12-16016 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML19301A1621981-11-0303 November 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Vepco,North Anna Unit 1, Technical Evaluation Rept ML20009F1261981-06-30030 June 1981 Ser,Inservice Testing Program,North Anna Nuclear Power Station Unit 2. ML20011A5691981-05-31031 May 1981 Analysis of North Anna-1 Quadrant Power Tilt, Interim Rept ML19269E1851979-04-30030 April 1979 Results of Acceptance Tests of Outside Recirculating Spray Pump, Final Rept 1995-08-31
[Table view] Category:QUICK LOOK
MONTHYEARML20101E5561995-08-31031 August 1995 TER on IPE Submittal Human Reliability Analysis, 940831 Draft Rept & 950831 Final Rept ML20101E2031995-08-31031 August 1995 TER of Plant IPE Back-End Submittal, Final Rept ML20101E1491995-08-31031 August 1995 TER on Individual Plant Exam Front End Analysis ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML20078B1551994-09-30030 September 1994 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,North Anna Power Station Units 1 & 2 ML20045D5891993-06-30030 June 1993 Trip Rept:Onsite Analysis of Human Factors of Event at North Anna 2 on 930416,Disabling Afs During Reactor Trip Recovery. ML20056C2041993-04-30030 April 1993 Pump & Valve IST Program,North Anna Power Station,Units 1 & 2, TER ML20116A3081992-10-31031 October 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the North Anna Nuclear Power Plants ML20091P3811992-01-31031 January 1992 Technical Evaluation Rept on Second 10-Yr Inservice Insp Program & Plan:Virginia Electric & Power Co,North Anna Power Station,Unit 1 ML20064A9721990-09-24024 September 1990 Technical Evaluation Rept,North Anna Power Station Units 1 & 2 Station Blackout Evaluation ML20214Q3811987-04-30030 April 1987 Conformance to Generic Ltr 83-28 Item 2.2.1 - Equipment Classification for All Safety-Related Components:North Anna 1 & 2, Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML20211N8071986-05-31031 May 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Indian Point 2,Kewaunee,North Anna 1 & 2 & Prairie Island 1 & 2 ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20128A5121985-05-14014 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities,' for North Anna Power Station,Units 1 & 2 ML20151K7491985-03-22022 March 1985 Masonry Wall Design,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20104B9571985-01-31031 January 1985 Conformance to Reg Guide 1.97,North Anna Power Station Units 1 & 2 ML20100F8811984-03-29029 March 1984 Technical Evaluation Rept on Seven Main Transformer Failures at North Anna Power Station,Units 1 & 2 ML20079Q6361983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20076D1811983-03-18018 March 1983 RETS Implementation (A-2), Technical Evaluation Rept ML20071M5291983-02-22022 February 1983 Control of Heavy Loads (C-10),Virginia Electric Power Co, North Anna Power Station Units 1 & 2, Draft Technical Evaluation Rept ML20076B6451982-09-27027 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements,North Anna Unit 1, Technical Evaluation Rept ML20083L7801982-09-17017 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20023A4761982-08-0404 August 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys (B-24), Technical Evaluation Rept ML20027D2191982-07-31031 July 1982 Adequacy of Station Electric Distribution Sys Voltages, North Anna Power Station,Units 1 & 2. ML20052A7291982-03-15015 March 1982 PWR Main Steam Line Break W/Continued Feedwater Addition, Vepco Units 1 & 2, Request for Addl Info ML20041A3081981-12-31031 December 1981 Technical Evaluation of Licensee Response to NUREG-0737 Item II.B.2,Design Review of Plant Shielding. ML20039A8211981-12-16016 December 1981 Equipment Environ Qualification Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20040D0321981-12-16016 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML19301A1621981-11-0303 November 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Vepco,North Anna Unit 1, Technical Evaluation Rept ML20009F1261981-06-30030 June 1981 Ser,Inservice Testing Program,North Anna Nuclear Power Station Unit 2. ML20011A5691981-05-31031 May 1981 Analysis of North Anna-1 Quadrant Power Tilt, Interim Rept ML19269E1851979-04-30030 April 1979 Results of Acceptance Tests of Outside Recirculating Spray Pump, Final Rept 1995-08-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20101E5561995-08-31031 August 1995 TER on IPE Submittal Human Reliability Analysis, 940831 Draft Rept & 950831 Final Rept ML20101E2031995-08-31031 August 1995 TER of Plant IPE Back-End Submittal, Final Rept ML20101E1491995-08-31031 August 1995 TER on Individual Plant Exam Front End Analysis ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML20078B1551994-09-30030 September 1994 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,North Anna Power Station Units 1 & 2 ML20045D5891993-06-30030 June 1993 Trip Rept:Onsite Analysis of Human Factors of Event at North Anna 2 on 930416,Disabling Afs During Reactor Trip Recovery. ML20056C2041993-04-30030 April 1993 Pump & Valve IST Program,North Anna Power Station,Units 1 & 2, TER ML20116A3081992-10-31031 October 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the North Anna Nuclear Power Plants ML20091P3811992-01-31031 January 1992 Technical Evaluation Rept on Second 10-Yr Inservice Insp Program & Plan:Virginia Electric & Power Co,North Anna Power Station,Unit 1 ML20064A9721990-09-24024 September 1990 Technical Evaluation Rept,North Anna Power Station Units 1 & 2 Station Blackout Evaluation ML20214Q3811987-04-30030 April 1987 Conformance to Generic Ltr 83-28 Item 2.2.1 - Equipment Classification for All Safety-Related Components:North Anna 1 & 2, Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML20211N8071986-05-31031 May 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Indian Point 2,Kewaunee,North Anna 1 & 2 & Prairie Island 1 & 2 ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20128A5121985-05-14014 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities,' for North Anna Power Station,Units 1 & 2 ML20151K7491985-03-22022 March 1985 Masonry Wall Design,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20104B9571985-01-31031 January 1985 Conformance to Reg Guide 1.97,North Anna Power Station Units 1 & 2 ML20100F8811984-03-29029 March 1984 Technical Evaluation Rept on Seven Main Transformer Failures at North Anna Power Station,Units 1 & 2 ML20079Q6361983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20076D1811983-03-18018 March 1983 RETS Implementation (A-2), Technical Evaluation Rept ML20071M5291983-02-22022 February 1983 Control of Heavy Loads (C-10),Virginia Electric Power Co, North Anna Power Station Units 1 & 2, Draft Technical Evaluation Rept ML20076B6451982-09-27027 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements,North Anna Unit 1, Technical Evaluation Rept ML20083L7801982-09-17017 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20023A4761982-08-0404 August 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys (B-24), Technical Evaluation Rept ML20027D2191982-07-31031 July 1982 Adequacy of Station Electric Distribution Sys Voltages, North Anna Power Station,Units 1 & 2. ML20052A7291982-03-15015 March 1982 PWR Main Steam Line Break W/Continued Feedwater Addition, Vepco Units 1 & 2, Request for Addl Info ML20041A3081981-12-31031 December 1981 Technical Evaluation of Licensee Response to NUREG-0737 Item II.B.2,Design Review of Plant Shielding. ML20039A8211981-12-16016 December 1981 Equipment Environ Qualification Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20040D0321981-12-16016 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML19301A1621981-11-0303 November 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Vepco,North Anna Unit 1, Technical Evaluation Rept ML20009F1261981-06-30030 June 1981 Ser,Inservice Testing Program,North Anna Nuclear Power Station Unit 2. ML20011A5691981-05-31031 May 1981 Analysis of North Anna-1 Quadrant Power Tilt, Interim Rept ML19269E1851979-04-30030 April 1979 Results of Acceptance Tests of Outside Recirculating Spray Pump, Final Rept 1995-08-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20101E5561995-08-31031 August 1995 TER on IPE Submittal Human Reliability Analysis, 940831 Draft Rept & 950831 Final Rept ML20101E2031995-08-31031 August 1995 TER of Plant IPE Back-End Submittal, Final Rept ML20101E1491995-08-31031 August 1995 TER on Individual Plant Exam Front End Analysis ML18152A3451994-10-31031 October 1994 Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:North Anna-1/-2 & Surry-1/-2. ML20078B1551994-09-30030 September 1994 Technical Evaluation Rept,Pump & Valve Inservice Testing Program,North Anna Power Station Units 1 & 2 ML20045D5891993-06-30030 June 1993 Trip Rept:Onsite Analysis of Human Factors of Event at North Anna 2 on 930416,Disabling Afs During Reactor Trip Recovery. ML20056C2041993-04-30030 April 1993 Pump & Valve IST Program,North Anna Power Station,Units 1 & 2, TER ML20116A3081992-10-31031 October 1992 Auxiliary Feedwater System RISK-BASED Inspection Guide for the North Anna Nuclear Power Plants ML20091P3811992-01-31031 January 1992 Technical Evaluation Rept on Second 10-Yr Inservice Insp Program & Plan:Virginia Electric & Power Co,North Anna Power Station,Unit 1 ML20064A9721990-09-24024 September 1990 Technical Evaluation Rept,North Anna Power Station Units 1 & 2 Station Blackout Evaluation ML20214Q3811987-04-30030 April 1987 Conformance to Generic Ltr 83-28 Item 2.2.1 - Equipment Classification for All Safety-Related Components:North Anna 1 & 2, Informal Rept ML18150A1881987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components, North Anna Units 1 & 2 & Surry Units 1 & 2, Informal Rept ML18150A1191987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2, Final Informal Rept ML18152A5831987-04-30030 April 1987 Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML20211N8071986-05-31031 May 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Indian Point 2,Kewaunee,North Anna 1 & 2 & Prairie Island 1 & 2 ML20138H2181985-09-30030 September 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Beaver Valley Unit 1,North Anna Units 1 & 2 & Surry Units 1 & 2 ML20128A5121985-05-14014 May 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,Item 1.2, `Post-Trip Review:Data & Info Capabilities,' for North Anna Power Station,Units 1 & 2 ML20151K7491985-03-22022 March 1985 Masonry Wall Design,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20104B9571985-01-31031 January 1985 Conformance to Reg Guide 1.97,North Anna Power Station Units 1 & 2 ML20100F8811984-03-29029 March 1984 Technical Evaluation Rept on Seven Main Transformer Failures at North Anna Power Station,Units 1 & 2 ML20079Q6361983-10-31031 October 1983 Conformance to NRR Generic Ltr 82-16,North Anna Power Station Units 1 & 2, Technical Evaluation Rept ML20076D1811983-03-18018 March 1983 RETS Implementation (A-2), Technical Evaluation Rept ML20071M5291983-02-22022 February 1983 Control of Heavy Loads (C-10),Virginia Electric Power Co, North Anna Power Station Units 1 & 2, Draft Technical Evaluation Rept ML20076B6451982-09-27027 September 1982 ECCS Repts (F-47) TMI Action Plan Requirements,North Anna Unit 1, Technical Evaluation Rept ML20083L7801982-09-17017 September 1982 Inservice Insp Program, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20023A4761982-08-0404 August 1982 Override & Reset of Control Circuitry in Ventilation/Purge Isolation & Other ESF Sys (B-24), Technical Evaluation Rept ML20027D2191982-07-31031 July 1982 Adequacy of Station Electric Distribution Sys Voltages, North Anna Power Station,Units 1 & 2. ML20052A7291982-03-15015 March 1982 PWR Main Steam Line Break W/Continued Feedwater Addition, Vepco Units 1 & 2, Request for Addl Info ML20041A3081981-12-31031 December 1981 Technical Evaluation of Licensee Response to NUREG-0737 Item II.B.2,Design Review of Plant Shielding. ML20039A8211981-12-16016 December 1981 Equipment Environ Qualification Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML20040D0321981-12-16016 December 1981 Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. ML19301A1621981-11-0303 November 1981 Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Vepco,North Anna Unit 1, Technical Evaluation Rept ML20009F1261981-06-30030 June 1981 Ser,Inservice Testing Program,North Anna Nuclear Power Station Unit 2. ML20011A5691981-05-31031 May 1981 Analysis of North Anna-1 Quadrant Power Tilt, Interim Rept ML19269E1851979-04-30030 April 1979 Results of Acceptance Tests of Outside Recirculating Spray Pump, Final Rept 1995-08-31
[Table view] |
Text
' '
- REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT ENVIRONMENTAL QUALIFICATION (EEQ)
REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES -
FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT Virginia Power and Electric Company North Anna Potter Station Unit 2 NRC Docket ho. 50-339 December 16, 1981 NRC TAC No. 42540 Dmpa_ d 8 zot zRos%
. . Franklin Research Center A Division of The Franklin Institute The Benjamn Frank 5n Parkwey, PhiLs, Pa. 19103(215)448 1000
, .y_-, - - -- _ .-, , _m. -,
~*
+ .
RFI-C5257-520 .
BACKGROUND of Philadelphia, Pa. is providing assis-Franklin Research Center (FRC) for the equipment tance to the U.S. Nuclear Regulatory Commission (NRC)
FRC will environmental qualification (EEQ) review of operating reactors.
per orm an EEQ review of the Licensee's 90-day response to outstanding issues frca the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited The to safety-related equipment potentially exposed to a harsh environment.
results will be presented in the form of a technical evaluation report for each plant.
This request for additional information (RFI) is the result of an 4, 1981 (1),
evaluation of the information provided by letters dated September May 31, 1981 [2] , and December 1,1980 [3] .* FRC prev'iously requested TMI 31, 1981 [4].
Action Plan information by a telephone memorandum dated August In response, VEPCO transmitted the following information on September 11, 1981 and October 8,1981:
1.- FSAR Sections 6.2.3 and 6.2.1
- 2. VEPCO response to NUREG-0737, Post TMI requirem'ents dated 31-May-81
- 3. Qualification Documents:
a.
Babcock & Wilcox transmittal 86-1119091-00, Relief Valve Acoustical Monitoring
- b. Isomedix Inc. , Component Testing Division, Environmental Exposure of Liquid Level Sensor dated November 17, IS75, for GEMS level detector, plant ID ILT-DA110A & 'B. ,
c.
Environmental test report summaries of Foxboro products, the Foxboro Company transmitters, plant ID #PT-EM110A & B.
- d. Westinghouse Electric Corporation letter NS-SS-79287 da~ted November 28, 1979, subject, Qualification of Electrical Equipr ent for Near Term OL Plants.
- Numbers in brackets refer to citations.found in the list of references.
4bu FrankHn Research Center A Desman of The Frans6nInsmause
. . .e- . amiummmmamad e w=
._a. w..
,-,,,-y- , , , , - , - - - , , , - - , - , - - - g
RFI-C5257-520
- e. Letter from Milton Aron (DeLaval, GEMS Sensor Division) to Arthur Murphy, Stone & Wcebster Engineering Corporation dated 7' May 1974. '
f.
GEMS level transmitter, plant ID #LT-RS-151A & B (test reports) .
A. FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER Date Received by FRC**
Information Requested
- 1. In reference to the Licensee's 90-day response [1] to the NRC SER [5], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceed:
- a. Trexler, D. L. , General Cable Corporation to Wright, R. D. , Stone &
Webster Engineering Corporation, Subjects Cable Constructions, December 22, 197*.
- b. Chapman, L., Stone, J., Tests of Electrical Cables after Simulated Post Accident Reactor Containment Service, Cerro Wire and Cable Company, a Supplement to Franklin Institute Research Laboratories Final Report
~2 F-C2857, March 1971. .
- c. Chapman, L., Stone, J., Tests of Electrical Cables af ter Simulated Post-Accident Reactor Containment Service, Franklin Institute Research Laboratories, Cerro Wire and Cable ~
Company, a Supplement to Franklin Institute Research Laboratories Final Report F-C2750, March 1970. -
- d. Learn, J..R., Boston Insulated Wire and Cable Company to Wright, R. D. , Stone &
Webster Engineering Corporation, 300 V Instrument cables and 600 V Control
- Cables, January 17, 1972.
- This column will be completed by FRC as the requested information is received.'
M .A L Franklin Research Center A Ommen of The Fremen ensames i
. i 4*
- * - m .e # e um e
~ w.
m 4
RFI-C5257-520 .
Date Received by FRC_**
Marth, J. R. , Rockbestos Company, to
. e. Stone & Webster Heneberry, E.,
Engineering Corporation, Qualification of Cable for Operation During Main Steam Line Break, April 25, 1977.
Lasky, J. S., The Okonite Company, to f.
Barnhart, J. H. , Stone & Webster Engineering Corporation, Cable,
Cookinham, J. B., Westinghouse Corp.,,
- g. Jr., VEPCO, NUREG-0588 to Brown, S. C.,
Equipment Qualifics. tion, NAW-361, dated October 30, 1980.
- h. Electric Power Research Institute, Evaluation and Test of Improved Fire-Resistant Fluid Lubricants for Water Reactor Ccolant Pump Motors, Volume 1: Fluid Evaluation, Bearing Model Tests, Motor Tests, and-Fire
, Tests, NP-1447, Volume 1, Research Project 893-1, Interim Report, dated July 1980. .
Reilly, P., Stone & Webster Engineering 1.
Corporation, to Lenahan, B. , Okonite l Cable Corporation, Cable, August 12, 1980. .
\
- j. Broadway, N. J., Palinchak, S., Effects of Nuclear Radiation on Elastomeric and Plastic Components and Materials, Radiation Effect Information Center, ;
Report No. 21, Columbus, Ohio. . J
- i
'k . Sheets, M. W. , Tcpical Report on '
General Electric Vertical Induction !
Motors, Inside.. Containment l Recirculation Spray Pumps - Surry and 1 North Anna Stations - Third Addition to (
Cover Rebuilding Motors Using New l Bearings, Docket Numbers 50-280 and j 50-281, July 23, 1979. l nklin Research Center A Omason of The Frerwen m
RFI-CS257-520 Date Received by FRC**
- 1. Bell, C. E. , General Electric Corporation, to Bonner, J. , Stone ti Webster Engineering Corporation, pH for Recirculation Spray Pumps, October 28, 1980.
- m. Gould-Brown Boveri, Radiation Qualification Report, S.O., No.
33-54685-RR, North Anna Power Station Unit 2, Indoor Secondary Unit .
Substations, December 1980.
- n. Anderson, T. M. , Westinghouse Electric Corporation, to Stolz, J. F., Nuclear Regulatory Commission, NS-TMA-1950, September 29, 1978. Attachments include: Westinghouse Electric Corporation,. Sensor Qualification Program IEEE 323, 1971, Demonstrating Program, Final Test Report for the Barton/ITT Modified Pressure Transmitter (Proprietary).
- o. Anderson, T. M. , Westinghouse Electric .
Corporation, to Stolz', J. F., Nuclear ,
Regulatory Commission, NS-TMA-2120, September 14, 1979. Attachmerts ~
include: Westinghouse Electric Corporation, Supplemental Qualification Testing of Barton Lot 1 Pressure and Differential Pressure Transmitters
! (Proprietary).
- p. Stolz, J. F., Nuclear Regulatory i
Commission, to Anderson, T. M.,
Westinghouse Electric Corporation,
Subject:
Class lE Electrical and Control Equipment, January 15, 1979.
- q. Conax Corporation, Design Qualification .
i Test Report for a Conax. Low Voltage
- Control Service Classification Conductor Feedthrough Assembly, P/N '
7641-21001, Test Report No. IPS-353.2, June 18, 1979.~
s A Dhamen of The Fremen ansensee -
5 RFI-CS257-520 Date Received by FRC**
- r. Federic"k, W. C., Conax Corporation, to Reilly, P., Stone & Webster Engineering Corporation,
Subject:
Environmental
- Qualification Electrical Penetrations, North Anna Units 1 and 2, January 8, 1981.
- s. Sheets, M. W., Topical Report on General Electric Vertical Indaction Motors, Inside Containment Recirculation Spray Pump Motors - Surry Power Station - Second Addendum to Cover Heat Aging, Radiation Exposure, .
Vibration, and Steam / Chemical Spray
- Exposure Qualification Test, NRC Docket Nos. 50-280 and 50-281, June 12, 1973.
- t. Drab, J. B., Limitorque Corporation, to Reilly, P. , Stone & Webster Engineering Corporation, Motor Operated valves,
. September 19, 1980. Possible attachments include: Reilly, P., Stone
& Webster Engineering Corporation, to Drab, J. Limitorque Corporation, two letters, October 10, 1980 and August 29, 1980.
- u. Drab, J. B. , Limitorque Corporation, to Reilly, P., Stone & Webster Engineering Corporation, Motor Operated Valves, ,
October 21, 1980.
- v. Excerpt from Raychem Report RT 1508/1, October 12, 1978,
- w. Maire, 'D. G. , Westinghouse. Electric .
Corporation, to Brown, S. C., Virginia ,
Electric and Power Company, CH/SI Pump Motors, S.O.,.VRA/VGB-460, August 19, 1980. -
x... Bell, C. , General Electric, telecom to Walker, F. P., Stone & Webster Engineering Corporation, Outside Recirculation Spray Motors, April 10, 1979.
, b Franklin Research Center A om.on w The newn w
---__=J-________________________
- s. .. .
RFI-C5257-520
~
Date Received by TRC**
- y. Devin, P. E. , Raychem Corporation, to Bonner, J., Stone & Webster Engineering ,
Corporation, April 24, 1979.
- z. Al-75-2 Rev. 3 (P) - Thermal Hydrogen Recombiner System for Water-Cooled Reactors aa. Al-72 Thermal Recombiner Demonstration Test bb. Al-73 Hydrogen Recombiner for PWR Post-LOCA Applica' tion cc. 'Newcomb, R., Virginia Electric and Power Company, to' MacFarlane, I. , Stone
& Webster Engineering Corporation, Memo concerning oil in CH/SI Pumps, dated December 31, 1980, dd. Lasky, J. S., The Okonite Company, to Reilly, P., Stone & Webster Engineering Corpcration, August 21, 1980, ee. Drab, J. B., Limitorque Corporation, to Bonner, J. , Stone & Webster Engineering Corporation, Telecom concerning Motor '
Operated Valves, October 16, 1980.
ff. Rockwell International Report AI-ESGN139TIl20010 - Operational Experience of Thermal Hydrogen Recombiner Systems and Components for .
PWR and BWR Mark III Reactor Systems.
gg. Rockwell' International Report AI-ESGN139TI120002 - PWR Hydrogen Recombiner Radiation Resistance.
hh. Rockwell' International Report AI-ESGN019PP120007 - Environmental .
Qualification Plan for Hydrogen Recombiner Motor / Blower Assembly.
ii. Rockwell International Report AI-ESGN019PP120009 - Environmental Qualification Plan for Hydrogen Recombiners, PWR.
- i 400hu klinFranResearch Center
% a m roi.an m .
j
% , e- -
. }
s
. RFI-CS257-520 Date Received by'FRC**
jj. Rockwell International Report AI-ESGN00lTP0000ll - Functional Checkout for Class lE Motor / Blower Assemoly.,
kk. Rockwell International Report AI-ESGN00lTP000013 - Functional Checkout for Class lE Components Undergoing IEEE 323-1974 Qualification Testing.
- 11. Brindley, J. H., Rockwell International, to Reilly, P., Stone &
Webster Engineering Corp. , Hydrogen Recombiner, July 17, 1980.
mm. Wheeler, L. W., Rockwell International, to Bechet, C. T., Stone & Webster Engineering Corporation, reply to 81 ESG-3176, May 19, 1981.
nn. Wyle Laboratories, Final Qualification Plan for Motor / Blower Assemblies for Rockwell International, Energy Systems Group for use in Nuclear Power Station, Qualification Plan NES-57553, Rev. C, July 27,1979.
oo. American Environmental Company, Abnormal Environment Qualification Test
- Report on Series 170 Motor Control Centre for Klockner-Moeller Limited,.
Natick, Mass., Report STR-132778-1, Februsty 5,1979.
pp. Stone, L. R. , Rockwell International, *
-to Stoll, S. , Stone & Webster -
Engineering Corporation, Hydrogen Recombiner, May 20, 1980.
qq. Blackwood, J. A. , Foxboro Company, to
- Barachewicz, J., Stone & Webst'er.
Engineering Corporation, October 27, 1980.
-7
, 000 Franklin Research Center 4 % wn.rr.nma =
%= ,
RFI-C5257-520 Date Received by FRC**
tr. Conax Corporation, Qualification Report for Electric Penetration Assemblies for North Anna Power Station - Units 1 & 2, Virginia Electric and Power Company, Conax W/O 7-02100, IPS-601, October 1980. -
ss. Drab, J. B., Limitorque Corporation, to Reilly, P., Stone & Webster Engineering Corporation, October 22, 1980.
tt. Bartolucci, E. J., LOCA Qualification Report for Okoguard Insulated Cables and T-95 and No. 35 Splicing Tapes, Okonite Company, June 23, 1980.
uu. Federick, W. C., Conax Corporation, to Reilly, P., Stone & Webster Engineering Corporation, November 19, 1980.
vv. Lasky, J. S., The Okanite Company, to MacFarlen, I., Sc.ne & Webster Engineering Corporation, Cable, October 10, 1980. ,
ww. Grisdale, R. T., Stone & Webster Engineering Corporation to Whom It May .
Concern, December 18, 1980.
xx. GE Radiation Resistance,Section III.
yy. Sears, J. A. and Ramsell, Radiation Test of E10 Series Amplifiers, Standard -
and Radiation Resistant Types, Foxboro Company, Test Report No. T3-1097, November 1973.
- z. Conax Corporation, Desight Qualification
. Report for A 42 Conductor No. 18 AWG, Conax Low Voltage Service
- l Classification Conductor Feedthrough . ,
Assembly Consistent with the l
! Requirements of IEEE Standard 317-1976 (NRC Regulatory Guide 1.63, July 1978). IPS 353.10, November 17, 1980 (Proprietary).
l l
l nk!!n Research Center A Ohnmen af The Fruruen kuumme
_____._._ ___--__.__._-__a__-- . _ _ _._a__ _ __--__._ -_ _
RFI-C5257-520 Date Received by FRC**
ama. Limitorciue Corporation, Nuclear i Qualification Data Sheet, November 1, 1979.
bbb. Federick,LW. C., Conax Corporation, to .
Bonner, J., Stone & Webster Engineering Corporation, January 5, 1980, ccc. McCarthy, P. T., Klockner-Moeller.
Corporation to ,Bradley, C., Stone &
Webster Engineering Corporation, April 3, 1981.
ddd. McCarthy, P. T., Klockner-Moeller Corporation to Bonner, J., Stone &
Webster Engineering Corporation, January 13, 1981.
eee. Lewicki, Reginald, Reliance Electric Company, to Barnhart, J. H. , Stone &
Webster Engineering Corporation, November 14, 1980.
fff. Buckley, R. , Radiation Technology, Inc., to McIntire, D., Gilbert Associates, Inc. , Letter dated June 8',
1981.
ggg. Devin, P.E. , Raychem Corp to D.
McIntire, Gilbert Associates Inc., May -
7, 1981.
, hhh. Okonite Company, Qualification of Okonite Ethylene - Propylene Rubber Insulation for Nuclear Plant Seitvice, July 3,1978. .
+
iii. Bell, C. E. , General Electric, to J. H.
Barnhart, Stone & Webster Engr. Corp.
March 12, 1981, with Attachment -
Qualification Report of General Electric Vertical Induction Motors for Class lE Recirculation Spray Pumps for the North Anna Power Station, by M. W.
Sheets, January 28,1981, 492HA289.
-9_
0I Franklin Resear ch Center 4 %.#Th.Fr . in
s .
- e ; e ,
RFI-C5257-520 Date Received by FRC**
jjj. Raychem Corp. , A Life Assessment of Raychem Heat Shrinkable High Voltage Terminators, Report No. EDR5018, March 28, 1980..
kkk. J. B. Drab, Limitorque Corp. ,. to R. R. -
Champagne, VEPCO, June 15, 1981.
111. Rahman, R. , Raychem Corp. , to D.
McIntire, Gilbert Assoc. Inc., June 25, 1981.
mmm. General Cable Corp., General Cable Corporation Report on Radiation
- Resistance of Material Used in Nuclear Power and Control Cable, M. A. Durakis, May 24, 1972.
nnn. VEPCO, Letter and Attachments,.
Environmental Qualification of Class lE Equipment, North Anna Power Station, Containment Electrical Penetrations, Conax Field Splices (Includes Termination Procedure) A. L. Parrish, .
III, July 6, 1981.
~
ooo. Maximum Emergency Environment Test "
Report, Conax IPS-73.4 Rev. A, 5/13/75:
SCEW 24A ppp. Conax Test Procedure IPS-72, Rev. A, 9/24/73 SCEW 24A qqq. Okonite Report NQRN-3, 5-11-81 .
rrr, Geruld-Boveri Letters 4-29-79 and 6-11-81 ,
sss. Limitorque/GAI Letter 3-3-81 ttt. Stone and Webster Calculation ES/180; .
SCEW 33a l uuu. Stone and Webster Letter 8-29-80; ,
SCEW W-5 vvv. Stone and Webster Calculation 12050-RP-122-03 SCEW W-42 l nklin Research Center i
A Denman of Die Frenten wisunne f
n - - y... , , . - ,_.L.---..- --,--,-.--,.,e
. . Uo '
a e i . g.
EFI-CS257-520 www. Raychem Letter 4-21-81 with attached' ENQC-126; 10/78
- 2. Many SCEWs pertaining to Limitorque motor- '
operated valves were missing information necessary for the FRC review to proceed (model no. motor make, model, and current -
c typer insulation typer brake model and manufacturer). FRC requests this information.
B. FRC REVIEW OF INSTALLED TMI ' ACTION PLAN ITEMS Information Requested Date Received by FRC**
- 1. Reference 7 does not provide adequate detail with respect to identification of TMI Action
~
Plan equipment installed after 1/1/81.
- a. Identification of TMI Action Plan equipment installed with implementation dates after 1/1/81 is requested,
- b. The correlation of these equipment items with the specific sections of NUREG-0737
[7] is requested.
(The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a TMI Action Plan item, are the cable and terminal blocks associated with the device also identified?]
- c. For all installed TMI Acticn Plan
' equipment . identified and not submitted in
- Reference 3, a System Component j
Evaluation Worksheet (SCEW) (in -
accordance with 79-OlB format) is requested. ,
- d. . The approicimate installation date for the TMI Action Plan equipment items is requested so that the appropriate l
qualification criteria (NUREG-0588 or. DOR Guidelines) can be used in the ED2
. evaluation.
6 e nk!!n Research Center A Ohnmen af The Frusen basame
" ~
i <
RFI-CS257-520
- 2. The qualification documents, e.g., the actual e G1 -
test reports and associated corresponde. ace
- cited as evidence of qualification listed on ,
the SCEW sheets, for all identified TMI -
Action Plan equipment are requested. (The identification of these reports considered.to
. be proprietary is requerted so that proper control of documents can be maintained.]
- 3. Where the Licensee has a standard Owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of ,
implementation dates, this information is requested in order to it. corporate it into the review. -
oo G
e e
G W
O e
8 11-4
-vm - - . . %
w
s **
)' C . ,
RFI-C5257-520 .
REFERENCES
, l~. R. H. Leasburg Letter to H. R. Denton and R. A. Clark, NRC.
Subject:
Response to Safety Evaluation Report /NUREG-0588, 90-Day Review for North Anna Power Station Unit 2 Virginia Electric & Power Co., 04-Sep-81 Serial No. 355 Virginia Electric and Power Company 2.
Response to NUREG-0737 Post 'IMI-Requirements Rev. 1, 31-May-81
- 3. B. R. Sylvia Letter to H. R. Denton, NRC.
Subject:
North Anna Power Station Unit No. 2, Response to NUREG-0588, December 1980 Revision Virginia Electric & Power. Co. , 01-Dec-80 Serial No. 958
- 4. Telephone Memorandum C. J. Crane, J. Murphy, K. Iepson, B. Krapf (FRC) Conversation with
- L. Engle (NRC-PM) , D. Smith, D. Wood (VEPCO)
Subject:
Request for Information, North Anna 1 31-Aug-81
- 5. Office of Nuclear Reactor Regulation Safety Evaluation Report for North Anna Unit 2 Environmental Qualification of Safety-Related Electrical Equipment NRC, 3-June-1981
- 6. Virginia Electric and Power Company ,
Response to NUREG-0737 Post TMI-Requirements, Rev. 1 31-May-81
- 7. NUREG-0737, " Clarification of TMI Action Plan. Requirements" NRC, November 1980