Hurricane Ivan

From kanterella
Revision as of 19:44, 11 February 2018 by StriderTol (talk | contribs) (Created page with "{{hurricane-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

15 September 2004

See also: Hurricane

Scrams (0)

General

 Start dateSiteTitle
ML23285A15412 October 2023HermesOfficial Exhibit - NRC-005B-MA-CM01 - Kairos Power LLC, Construction Permit Application - Preliminary Safety Analysis Report (Psar), Revision 3 (May 31, 2023)
ML23285A15712 October 2023HermesOfficial Exhibit - NRC-005E-MA-CM01 - Kairos Power LLC, Construction Permit Application - Environmental Report, Revision 1 (March 30, 2023)
ML23151A74531 May 2023HermesEnclosure 1 - Preliminary Safety Analysis Report
NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes31 May 2023NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes
ML23089A38831 March 202399902069
Hermes
Kairos Power LLC, Environmental Report HER-ER-001 for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1
ML23055A67424 February 2023HermesHER-PSAR-001, Revision 2, Hermes Non?Power Reactor Preliminary Safety Analysis Report
ML23034A2143 February 2023HermesKairos Power LLC, Changes to Preliminary Safety Analysis Report (Psar), Revision 1, Chapter 2
ML22272A59529 September 2022HermesEnclosure 1: HER-PSAR-001, Preliminary Safety Analysis Report, Rev. 1
NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas30 June 2022NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas
ML21139A34419 May 2021Advanced Reactors GEIS Docs - the Deadliest, Costliest, and Most Intense United States Tropical Cyclones from 1851 to 2010
ML20366A01629 December 2020NRC-2017-000688 (Formerly FOIA/PA-2017-0690) - Resp 5 - Final, Agency Records Subject to the Request Are Enclosed, Part 8 of 15
ML19030A40618 January 2019Clinch RiverPart 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.07.03 - Severe Weather
ML19029A53718 January 2019Clinch RiverPart 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology
ML19030A28618 January 2019Clinch RiverPart 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology
ML17289B1488 November 2018Clinch RiverClinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.3
ML17362A26315 December 2017Clinch RiverPart 02 Ssar (Rev. 1) - Part 2 - Ssar - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology
ML18003A31115 December 2017Clinch RiverPart 02 Ssar (Rev. 1) - Part 2 - Ssar - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology
ML18003A43515 December 2017Clinch RiverPart 03 Environmental Report (Rev. 1) - Part 3 - Er - Chapter 2 - Environmental Description - Section 2.7.3 - Severe Weather
ML17276B2182 November 2017Three Mile IslandStaff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-Evaluation (Public)
ML17284A03530 October 2017Peach BottomStaff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-evaluation (Public)
ML17255A52425 September 2017Peach BottomNRC Report for the Audit of Exelon Generating Company Llc'S Flood Hazard Reevaluation Report Submittal Relating to the NTTF Recomendation 2.1--Flooding for Peach Bottom Atomic Power Station, Units 2 and 3-Public Redacted
L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 1096 February 2015Saint Lucieto FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109
ML13095A19611 March 2013Turkey PointFlood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 1 of 2
ML13079A80811 March 2013South TexasEnclosuflooding Hazard Reevaluation Report, Cover Through Page 2.3-1 Through End
ML14286A01231 December 2010Bell BendTN638 - Mcgonigal 2010 - Nutrients and Suspended Sediment in the Susquehana River, 2009
ML12089A56231 October 2008Indian PointEntergy Pre-Filed Evidentiary Hearing Exhibit ENT000298 - NUREG CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations
ML12338A61231 October 2008Indian PointOfficial Exhibit - ENT000298-00-BD01 - NUREG/CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations
ML08133059524 March 2008Millstone
Kewaunee
Surry
North Anna
07200002
ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2 and ISFSI, Proof of Financial Protection, Guarantee of Payment of Deferred Premiums and Submission of Annual Financial Report
ML18019B17022 December 2006Clinch RiverCDC - 2017- TN4902, Morbidity and Mortality Weekly Report
ML18019A90022 December 2006Clinch RiverCDC 2017- TN4902--CDC 2017 Mmwr
ML06236026631 May 2006SaxtonIndependent Inspection Program for the Decommissioning of the Saxton Nuclear Reactor Final Report
ML06129014826 April 2006FarleyAnnual Submission Reports
PLA-5890, 2004 Annual Environmental Operating Report (Non - Radiological)28 April 2005Susquehanna2004 Annual Environmental Operating Report (Non - Radiological)
GNRO-2005/00022, Annual Report19 April 2005Grand GulfAnnual Report
ML05118014515 April 2005FarleyAnnual Submission Reports
ML0510504761 April 2005Millstone. 2. and 3 and ISFSI Annual Reporting of Financial Information
E910-05-029, Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL829 March 2005SaxtonCalculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8
ML06362021628 February 2005FitzPatrickJAFNPP Er Ref 8-17 Energy Outlook 2005, with Projections to 2025
IR 05000369/200400613 January 2005Mcguire
McGuire
IR 05000369-04-006, IR 05000370-04-006; 09/12/2004 - 12/31/2004; McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection Report
ML05137058131 December 2004OconeeAnnual Radiological Environmental Operating Report, Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3
ML0433703862 December 2004Grand Gulf
Arkansas Nuclear
River Bend
Waterford
Management Meeting with NRC Re Performance of Arkansas Nuclear One and Grand Gulf Nuclear Station
IR 05000387/200400412 November 2004SusquehannaIR 05000387-04-004, IR 05000388-04-004, on 07/01/2004 - 09/30/2004, Susquehanna Steam Electric Station, Units 1 and 2; Maintenance Implementation, Post Maintenance Test, Identification and Resolution of Problems
IR 05000458/200400412 November 2004River BendIR 05000458-04-004, on 07/01/2004 - 09/30/2004, River Bend Station; Problem Identification and Resolution
IR 05000334/20040059 November 2004Beaver ValleyIR 05000334-04-005 and IR 05000412-04-005, on 07/01/2004 - 09/30/2004 for Beaver Valley Power Station, Units 1 & 2; Flood Protection Measures; Licensed Operator Requalification Program; Operability Evaluations
IR 05000289/20040048 November 2004Three Mile IslandIR 05000289-04-004; 07/01/2004 - 09/30/2004; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Surveillance Testing and Operability Evaluations
ML04310056928 October 2004SalemReport of Impingement of Shortnose Sturgeon
IR 05000302/200400522 October 2004Crystal RiverIR 05000302-04-005, on 06/27/2004 - 09/25/2004; Crystal River Unit 3; Equipment Alignment, Fire Protection, Event Followup
NL-04-1971, September 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant11 October 2004FarleySeptember 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant
ENS 4104917 September 2004 09:00:00Watts BarLoss of Emergency Siren Capability and Notification of Offsite Agency
PNO-IV-04-025, A: Entergy Operations, Inc.: River Bend Station and Waterford-3 - Update to Region IV Response to Hurricane Ivan16 September 2004River Bend
Waterford
PNO-IV-04-025A: Entergy Operations, Inc.: River Bend Station and Waterford-3 - Update to Region IV Response to Hurricane Ivan
... further results