Hurricane Ivan
Jump to navigation
Jump to search
15 September 2004
- See also: Hurricane
Scrams (0)
General
Start date | Site | Title | |
---|---|---|---|
ML23285A154 | 12 October 2023 | Hermes | Official Exhibit - NRC-005B-MA-CM01 - Kairos Power LLC, Construction Permit Application - Preliminary Safety Analysis Report (Psar), Revision 3 (May 31, 2023) |
ML23285A157 | 12 October 2023 | Hermes | Official Exhibit - NRC-005E-MA-CM01 - Kairos Power LLC, Construction Permit Application - Environmental Report, Revision 1 (March 30, 2023) |
ML23151A745 | 31 May 2023 | Hermes | Enclosure 1 - Preliminary Safety Analysis Report |
NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes | 31 May 2023 | NUREG/CR-7290, Convection-Permitting Modeling for Intense Precipitation Processes | |
ML23089A388 | 31 March 2023 | 99902069 Hermes | Kairos Power LLC, Environmental Report HER-ER-001 for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 |
ML23055A674 | 24 February 2023 | Hermes | HER-PSAR-001, Revision 2, Hermes Non?Power Reactor Preliminary Safety Analysis Report |
ML23034A214 | 3 February 2023 | Hermes | Kairos Power LLC, Changes to Preliminary Safety Analysis Report (Psar), Revision 1, Chapter 2 |
ML22272A595 | 29 September 2022 | Hermes | Enclosure 1: HER-PSAR-001, Preliminary Safety Analysis Report, Rev. 1 |
NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas | 30 June 2022 | NUREG/CR-7132, Application of Radar-Rainfall Estimates to Probable Maximum Precipitation in the Carolinas | |
ML21139A344 | 19 May 2021 | Advanced Reactors GEIS Docs - the Deadliest, Costliest, and Most Intense United States Tropical Cyclones from 1851 to 2010 | |
ML20366A016 | 29 December 2020 | NRC-2017-000688 (Formerly FOIA/PA-2017-0690) - Resp 5 - Final, Agency Records Subject to the Request Are Enclosed, Part 8 of 15 | |
ML19030A406 | 18 January 2019 | Clinch River | Part 03 Environmental Report (Rev. 2) - Part 03 - Environmental Report - Chapter 02 - Section 02.07.03 - Severe Weather |
ML19029A537 | 18 January 2019 | Clinch River | Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology |
ML19030A286 | 18 January 2019 | Clinch River | Part 02 Ssar (Rev. 2) - Part 02 - Ssar - Chapter 02 - Site Characteristics - Section 02.03 - Meteorology |
ML17289B148 | 8 November 2018 | Clinch River | Clinch River Nuclear Site Early Site Permit Application Safety Evaluation with No Open Items, Section 2.3 |
ML17362A263 | 15 December 2017 | Clinch River | Part 02 Ssar (Rev. 1) - Part 2 - Ssar - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology |
ML18003A311 | 15 December 2017 | Clinch River | Part 02 Ssar (Rev. 1) - Part 2 - Ssar - Chapter 2 - Site Characteristics - Section 2.3 - Meteorology |
ML18003A435 | 15 December 2017 | Clinch River | Part 03 Environmental Report (Rev. 1) - Part 3 - Er - Chapter 2 - Environmental Description - Section 2.7.3 - Severe Weather |
ML17276B218 | 2 November 2017 | Three Mile Island | Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-Evaluation (Public) |
ML17284A035 | 30 October 2017 | Peach Bottom | Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Re-evaluation (Public) |
ML17255A524 | 25 September 2017 | Peach Bottom | NRC Report for the Audit of Exelon Generating Company Llc'S Flood Hazard Reevaluation Report Submittal Relating to the NTTF Recomendation 2.1--Flooding for Peach Bottom Atomic Power Station, Units 2 and 3-Public Redacted |
L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 | 6 February 2015 | Saint Lucie | to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 |
ML13095A196 | 11 March 2013 | Turkey Point | Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 1 of 2 |
ML13079A808 | 11 March 2013 | South Texas | Enclosuflooding Hazard Reevaluation Report, Cover Through Page 2.3-1 Through End |
ML14286A012 | 31 December 2010 | Bell Bend | TN638 - Mcgonigal 2010 - Nutrients and Suspended Sediment in the Susquehana River, 2009 |
ML12089A562 | 31 October 2008 | Indian Point | Entergy Pre-Filed Evidentiary Hearing Exhibit ENT000298 - NUREG CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations |
ML12338A612 | 31 October 2008 | Indian Point | Official Exhibit - ENT000298-00-BD01 - NUREG/CR-6981, Assessment of Emergency Response Planning and Implementation for Large Scale Evacuations |
ML081330595 | 24 March 2008 | Millstone Kewaunee Surry North Anna 07200002 | ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2 and ISFSI, Proof of Financial Protection, Guarantee of Payment of Deferred Premiums and Submission of Annual Financial Report |
ML18019B170 | 22 December 2006 | Clinch River | CDC - 2017- TN4902, Morbidity and Mortality Weekly Report |
ML18019A900 | 22 December 2006 | Clinch River | CDC 2017- TN4902--CDC 2017 Mmwr |
ML062360266 | 31 May 2006 | Saxton | Independent Inspection Program for the Decommissioning of the Saxton Nuclear Reactor Final Report |
ML061290148 | 26 April 2006 | Farley | Annual Submission Reports |
PLA-5890, 2004 Annual Environmental Operating Report (Non - Radiological) | 28 April 2005 | Susquehanna | 2004 Annual Environmental Operating Report (Non - Radiological) |
GNRO-2005/00022, Annual Report | 19 April 2005 | Grand Gulf | Annual Report |
ML051180145 | 15 April 2005 | Farley | Annual Submission Reports |
ML051050476 | 1 April 2005 | Millstone | . 2. and 3 and ISFSI Annual Reporting of Financial Information |
E910-05-029, Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8 | 29 March 2005 | Saxton | Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8 |
ML063620216 | 28 February 2005 | FitzPatrick | JAFNPP Er Ref 8-17 Energy Outlook 2005, with Projections to 2025 |
IR 05000369/2004006 | 13 January 2005 | Mcguire McGuire | IR 05000369-04-006, IR 05000370-04-006; 09/12/2004 - 12/31/2004; McGuire Nuclear Station, Units 1 and 2; Quarterly Integrated Inspection Report |
ML051370581 | 31 December 2004 | Oconee | Annual Radiological Environmental Operating Report, Duke Power Company Oconee Nuclear Station, Units 1, 2, and 3 |
ML043370386 | 2 December 2004 | Grand Gulf Arkansas Nuclear River Bend Waterford | Management Meeting with NRC Re Performance of Arkansas Nuclear One and Grand Gulf Nuclear Station |
IR 05000387/2004004 | 12 November 2004 | Susquehanna | IR 05000387-04-004, IR 05000388-04-004, on 07/01/2004 - 09/30/2004, Susquehanna Steam Electric Station, Units 1 and 2; Maintenance Implementation, Post Maintenance Test, Identification and Resolution of Problems |
IR 05000458/2004004 | 12 November 2004 | River Bend | IR 05000458-04-004, on 07/01/2004 - 09/30/2004, River Bend Station; Problem Identification and Resolution |
IR 05000334/2004005 | 9 November 2004 | Beaver Valley | IR 05000334-04-005 and IR 05000412-04-005, on 07/01/2004 - 09/30/2004 for Beaver Valley Power Station, Units 1 & 2; Flood Protection Measures; Licensed Operator Requalification Program; Operability Evaluations |
IR 05000289/2004004 | 8 November 2004 | Three Mile Island | IR 05000289-04-004; 07/01/2004 - 09/30/2004; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Surveillance Testing and Operability Evaluations |
ML043100569 | 28 October 2004 | Salem | Report of Impingement of Shortnose Sturgeon |
IR 05000302/2004005 | 22 October 2004 | Crystal River | IR 05000302-04-005, on 06/27/2004 - 09/25/2004; Crystal River Unit 3; Equipment Alignment, Fire Protection, Event Followup |
NL-04-1971, September 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant | 11 October 2004 | Farley | September 2004 Monthly Operating Reports for Joseph M Farley Nuclear Plant |
ENS 41049 | 17 September 2004 09:00:00 | Watts Bar | Loss of Emergency Siren Capability and Notification of Offsite Agency |
PNO-IV-04-025, A: Entergy Operations, Inc.: River Bend Station and Waterford-3 - Update to Region IV Response to Hurricane Ivan | 16 September 2004 | River Bend Waterford | PNO-IV-04-025A: Entergy Operations, Inc.: River Bend Station and Waterford-3 - Update to Region IV Response to Hurricane Ivan |
... further results |