IR 05000607/2013201

From kanterella
Revision as of 16:43, 6 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000607/2013-201 on January 14-16, 2012 at University of California, Davis - NRC Routine Inspection Report No. 50-607/2013-201
ML13024A187
Person / Time
Site: University of California-Davis
Issue date: 02/12/2013
From: Bowman G T
Research and Test Reactors Branch B
To: Klein B M
McClellan Nuclear Research Center
Bassett, Craig
References
IR-13-201
Download: ML13024A187 (21)


Text

February 12, 2013

Dr. Barry M. Klein, Reactor Director 5335 Price Avenue, Bldg. 258 McClellan AFB, CA 95652-2504

SUBJECT: UNIVERSITY OF CALIFORNIA-DAVIS - NRC ROUTINE INSPECTION REPORT NO. 50-607/2013-201

Dear Dr. Klein:

From January 14 to 16, 2013, the U.S. Nuclear Regulatory Commission (NRC or the Commission) conducted an inspection at your University of California-Davis/McClellan Nuclear Research Center. The enclosed report documents the inspection results, which were discussed on January 16, 2013, with members of your staff, including Walter Steingass, Associate Director for Reactor Operations, and David Reap, Health Physics Technician.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.

No response to this letter is required.

In accordance with Title 10 of the Code of Federal Regulations Section 2.390, "Public inspections, exemptions, and requests for withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this inspection, please contact Craig Bassett at (301) 466-4495 or by electronic mail at Craig.Bassett@nrc.gov.

Sincerely,/RA/ Gregory T. Bowman, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No. 50-607 License No. R-130

Enclosure:

NRC Inspection Report No. 50-607/2013-201 cc: w/encl: Please see next page University of California - Davis/McClellan MNRC Docket No. 50-607 cc: Dr. Wesley Frey, Radiation Safety Officer 5335 Price Avenue, Bldg. 258 McClellan AFB, CA 95652-2504

Mr. Walter Steingass, Associate Director for Reactor Operations 5335 Price Avenue, Bldg. 258 McClellan AFB, CA 95652-2504

California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814

Radiological Health Branch P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611

Dr. Barry