ML13107A190

From kanterella
Revision as of 14:24, 6 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Palo Verde Nuclear Generating Station - Notification Of Ti-186 Inspection (NRC Inspection Report 05000528-13-406, 05000529-13-406, 05000530-13-406) And Request For Information
ML13107A190
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/16/2013
From: Vincent Gaddy
Operations Branch IV
To: Edington R K
Arizona Public Service Co
References
Download: ML13107A190 (4)


See also: IR 05000528/2013406

Text

April 16, 2013

Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION - NOTIFICATION OF TI-186 INSPECTION (NRC INSPECTION REPORT 05000528, 529, 530/2013406) AND REQUEST FOR INFORMATION

Dear Mr. Edington:

From May 21 to May 23, 2013, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will be onsite to perform the Temporary Instruction (TI)-186, "Inspection of Procedures and Processes for Responding to Potential Aircraft Threats." In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Also, in order to demonstrate compliance with TI-186, we ask that you have the necessary staff members available to the inspection team to assist in any plant walk-throughs, interviews, and/or simulator demonstrations.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Sean Hedger at (817) 200-1556 (Sean.Hedger@nrc.gov) or Gabriel Apger (Gabriel.Apger@nrc.gov).

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety

Docket: 50-528, 50-529, 50-530 License: NPF-41, NPF-51, NPF-74

Enclosure:

Inservice Inspection Document Request

cc: Electronic Distribution for Palo Verde Nuclear Generating Station