ML20054B910

From kanterella
Revision as of 14:04, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Testimony of W Lindbald Before or Energy Facility Siting Council Withdrawing Application for Site Certificate
ML20054B910
Person / Time
Site: 05000514, 05000515
Issue date: 04/09/1982
From: Lindblad W
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20054B905 List:
References
NUDOCS 8204190307
Download: ML20054B910 (1)


Text

.

APRIL 9, 1982 STATEMENT OF WILLIAM LINDBLAD, PRESIDENT OF PORTLAND GE*1ERAL ELECTRIC COMPANY BEFORE TliE OREGON ENERGY FACILITY SITING COUNCIL Mr. Chairman, Meml;ers of the Council, I am Bill Lindblad, President of Portland General Elactric Comnan't. .

The Coo any e .

has been continuously reviewing the status of the proposed Pebble Springs project which is still pending before the Council as the subject of an application for a site certificate.

The record in that application was established at a time st".en circumstances were different than they are today.

A majcr change in circumstr.nces was the passage of Eallot Measure 7. Other chances include re';1.=cd energv load growt?

forecasts in Oreaon s. d the reaien, ' h passage of the Regional Power Bill, events in c o l'c. m the Fashington Public Pe.er Supply

  • stan, a:;f t"s cast of maintcinina licensic.g of i

. r o j c. c t s ',ti t h d i s t a n t corrlatior dates. *:e have been n' ci. sea b' cur General Counsel that, in ;is cpinion, such changes in circumstancce af fcet ratters contair.ed in the record for j this a;p_icatien.

(

l i

We have therefore ccncluded that it is in the best interests of our custo ers., c'.ners and the State of Orecor.

tc withdraw our apnlicatica for a site certificate.

8204190307 820412 PDR ADOCK 05000514 G PDR

_ _