EPID:L-2018-LLA-0498, Vegp Units 3 and 4 - Request for Alternative: Alternative Requirements for Preservice Testing of Explosively Activated Valve (Vegp 3 & 4-PST-ALT-01) (Approved, Closed) |
|
|
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARNL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report NL-24-0031, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R23 NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0584, Preservice Inspection Program Owners Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owners Activity Report NL-23-0541, Inservice Inspection Program Owner’S Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owner’S Activity Report for Outage 1R24 NL-22-0778, Refueling Outage 2R22 Steam Generator Tube Inspection Report2022-09-30030 September 2022 Refueling Outage 2R22 Steam Generator Tube Inspection Report NL-22-0512, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R222022-07-0101 July 2022 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R22 ML22180A2612022-06-29029 June 2022 Proposed Inservice Testing Alterative ALT-VR-01 ND-22-0253, Submittal of Preservice Test Plan - Version 4.02022-04-0707 April 2022 Submittal of Preservice Test Plan - Version 4.0 ND-22-0254, Submittal of Inservice Testing Program Plan - 1st Interval, Version 2.02022-04-0707 April 2022 Submittal of Inservice Testing Program Plan - 1st Interval, Version 2.0 NL-22-0227, Refueling Outage 1R23 Steam Generator Tube Inspection Report2022-04-0101 April 2022 Refueling Outage 1R23 Steam Generator Tube Inspection Report NL-21-1130, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R232022-01-0303 January 2022 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R23 NL-21-0767, Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the 4th 10-Year Inservice Inspection Internal (VEGP-ISI-ALT-04-05, Version 1.0)2021-09-10010 September 2021 Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the 4th 10-Year Inservice Inspection Internal (VEGP-ISI-ALT-04-05, Version 1.0) NL-21-0381, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R212021-04-26026 April 2021 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R21 NL-20-1329, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R222020-11-23023 November 2020 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R22 NL-20-1312, Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.02020-11-23023 November 2020 Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 NL-20-1086, Refueling Outage 1R22 Steam Generator Tube Inspection Report2020-09-17017 September 2020 Refueling Outage 1R22 Steam Generator Tube Inspection Report NL-20-1011, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.02020-09-0909 September 2020 Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 ND-20-0645, Submittal of Preservice Test Plan - Version 3.02020-06-0303 June 2020 Submittal of Preservice Test Plan - Version 3.0 ND-20-0601, Submittal of Inservice Testing Program Plan - 1st Interval2020-05-21021 May 2020 Submittal of Inservice Testing Program Plan - 1st Interval ND-19-1416, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report2019-12-0909 December 2019 Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report NL-19-1094, Refueling Outage 2R20 Steam Generator Tube Inspection Report2019-09-10010 September 2019 Refueling Outage 2R20 Steam Generator Tube Inspection Report ND-19-0747, Preservice Test Plan, Version 2.02019-07-24024 July 2019 Preservice Test Plan, Version 2.0 NL-19-0712, Submittal of Inservice Inspection Program Owner'S Activity Report for Outage 2R202019-06-26026 June 2019 Submittal of Inservice Inspection Program Owner'S Activity Report for Outage 2R20 NL-19-0204, R21 Steam Generator Tube Inspection Report2019-03-21021 March 2019 R21 Steam Generator Tube Inspection Report NL-18-1571, Proposed ISI Alternative VEGP-ISI-ALT-19-01 for Tendon Inservice Inspection Extension2019-02-18018 February 2019 Proposed ISI Alternative VEGP-ISI-ALT-19-01 for Tendon Inservice Inspection Extension NL-18-1565, Inservice Inspection Program Owner'S Activity Report for Outage 1R212019-01-0303 January 2019 Inservice Inspection Program Owner'S Activity Report for Outage 1R21 ND-18-1504, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report2018-12-0707 December 2018 Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report ND-18-1401, Request for Alternative: Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01)2018-11-29029 November 2018 Request for Alternative: Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01) ND-18-1185, Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06)2018-10-19019 October 2018 Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06) ND-18-1014, Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4 - PSI/ISI-ALT-10)2018-07-26026 July 2018 Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4 - PSI/ISI-ALT-10) NL-17-2128, Inservice Inspection Program Owner'S Activity Report for Outage 2R192017-12-21021 December 2017 Inservice Inspection Program Owner'S Activity Report for Outage 2R19 NL-17-1197, Fourth Ten-Year Interval Lnservice Testing Program Update2017-10-23023 October 2017 Fourth Ten-Year Interval Lnservice Testing Program Update NL-17-1641, Submittal of 1R20 Steam Generator Tube Inspection Report2017-09-27027 September 2017 Submittal of 1R20 Steam Generator Tube Inspection Report NL-17-1157, Transmittal of 1R20 ISI Report Summary2017-06-30030 June 2017 Transmittal of 1R20 ISI Report Summary NL-17-0659, Response to Request for Additional Information Re VEGP-ISI-ALT-13 Category B-N-2 and B-N-3 Examination Extension from 10 to 20 Years2017-04-20020 April 2017 Response to Request for Additional Information Re VEGP-ISI-ALT-13 Category B-N-2 and B-N-3 Examination Extension from 10 to 20 Years NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule2017-01-26026 January 2017 Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule NL-16-1609, Refueling Outage 2R18 Steam Generator Tube Inspection Report2016-09-13013 September 2016 Refueling Outage 2R18 Steam Generator Tube Inspection Report NL-16-1329, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.02016-08-0404 August 2016 Proposed Inservice Inspection Alternative VEGP-ISI-ALT-11, Version 2.0 and Proposed Inservice Inspection Alternative FNP-ISI-ALT-19, Version 2.0 NL-16-1242, Submittal of the Inservice Testing Program Relief Request and Alternatives for Pumps and Valves - Fourth Ten-Year Interval2016-07-28028 July 2016 Submittal of the Inservice Testing Program Relief Request and Alternatives for Pumps and Valves - Fourth Ten-Year Interval NL-16-0927, 2R18 Lnservice Inspection Report Summary2016-06-27027 June 2016 2R18 Lnservice Inspection Report Summary NL-16-0081, Submittal of 1R19 Inservice Inspection Report Summary2016-01-20020 January 2016 Submittal of 1R19 Inservice Inspection Report Summary NL-15-0058, 2R17 Inservice Inspection Report Summary2015-01-12012 January 2015 2R17 Inservice Inspection Report Summary NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code NL-14-1081, R18 Inservice Inspection Report Summary2014-07-11011 July 2014 R18 Inservice Inspection Report Summary NL-13-2036, Sixteenth Maintenance / Refueling Outage Steam Generator Tube Inspection Report2013-09-26026 September 2013 Sixteenth Maintenance / Refueling Outage Steam Generator Tube Inspection Report ML13184A2692013-07-0202 July 2013 R16 Inservice Inspection Report Summary NL-13-0090, 1R17 Inservice Inspection Report Summary2013-01-16016 January 2013 1R17 Inservice Inspection Report Summary 2024-07-03
[Table view] Category:Letter type:ND
MONTHYEARND-24-0103, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2024-04-26026 April 2024 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-24-0114, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-04-0101 April 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-24-0046, (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance2024-03-18018 March 2024 (Vegp), Unit 3, Condition Prohibited by Technical Specification Limiting Condition of Operation 3.1.6 Control Bank Overlap Limits Exceeded Due to Inadequate Procedure Guidance ND-24-0059, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-03-0404 March 2024 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0693, Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests2024-02-15015 February 2024 Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests ND-23-0690, Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests2024-02-0808 February 2024 Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests ND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) 2024-04-26
[Table view] |
Text
B. H. Whitley Southern Nuclear Director Operating Company, Inc.
Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 Tel 205.992.7079 November 29, 2018 Docket Nos.: 52-025 ND-18-1401 52-026 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Request for Alternative:
Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01)
Ladies and Gentlemen:
Pursuant to 10 CFR 50.55a(z)(1), Southern Nuclear Operating Company (SNC) hereby requests NRC authorization to use an alternative to the requirements of the ASME OM Code, 2012 Edition (Code of Record) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4. The proposed request for alternative is applicable to testing of charges associated with explosively actuated valves.
The details of the 10 CFR 50.55a(z)(1) request are contained in the Enclosure to this letter.
Approval is requested by May 30, 2019 to support preservice testing of the squib valves charges scheduled for June 2019.
SNC facilitated a presubmittal meeting on November 15, 2018 with the NRC staff on the proposed Code alternative.
This letter contains no regulatory commitments. This letter has been reviewed and confirmed to contain no security-related information. Should you have any questions, please contact Mr. Corey Thomas at (205) 992-5221.
U.S. Nuclear Regulatory Commission ND-18-1401 Page 2 of 4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 29th of November 2018.
Respectfully submitted, Brian H. Whitley Director, Regulatory Affairs Southern Nuclear Operating Company
Enclosure:
Vogtle Electric Generating Plant (VEGP) Units 3 and 4- Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Ait-01)
U.S. Nuclear Regulatory Commission ND-18-1401 Page 3 of 4 cc:
Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosure)
Mr. D. G. Bost (w/o enclosure)
Mr. M. D. Meier (w/o enclosure)
Mr. D. H. Jones (w/o enclosure)
Mr. J. B. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o enclosure)
Mr. T. W. Yelverton (w/o enclosure)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Yox Mr. C. T. Defnall Mr. J. Tupik Mr. W. A. Sparkman Ms. A. C. Chamberlain Ms. A. L. Pugh Mr. E. Riffle Ms. K. Roberts Document Services RTYPE: VND.LI.L00 File AR.01.02.06 Nuclear Regulatory Commission Mr. W. Jones (w/o enclosure)
Ms. J. Dixon-Herrity Mr. C. Patel Ms. J. M. Heisserer Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. C. J. Even Mr. A. Lerch Mr. S. Walker State of Georgia Mr. R. Dunn
U.S. Nuclear Regulatory Commission ND-18-1401 Page 4 of 4 Oglethorpe Power Corporation Mr. M. W. Price Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Mr. L. Oriani (w/o enclosure)
Mr. C. Churchman (w/o enclosure)
Mr. M. Corletti Mr. M. L. Clyde Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light
Southern Nuclear Operating Company ND-18-1401 Enclosure Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01)
(This Enclosure consists of 4 pages, including this cover page)
ND-18-1401 Enclosure Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01)
Vogtle Electric Generating Plant (VEGP) - Units 3 and 4 Plant Site-Unit:
Interval-Interval Applies to the preservice testing period.
Dates:
Requested Date for Authorization is requested by May 30, 2019.
Approval:
ASME Code Components ASME Class 1 and 3 Explosively Actuated Valves.
Affected:
Applicable Code Edition ASME OM Code, 2012 Edition (Code of Record).
and Addenda:
ASME OM Code, ISTC-3100(d)(2) requires that for post-2000 plants, Category D explosively actuated valves shall be preservice tested as follows:
Applicable Select a sample of at least 20% of the pyrotechnic charges in all valves Code to be tested. Test each selected charge either in the valve, or a qualified Requirements: test fixture to confirm the capability of each sampled charge to provide the necessary motive force to operate the valve to perform its intended function without damage to the valve body or connected piping. The sampling must include at least one explosively actuated valve from each redundant safety train.
Based on the ASME OM Code definition of preservice test, which states test performed after completion of construction activities Reason for related to the component, and the statement in ISTC-3100(d)(2)
Request: that Pyrotechnic charges in all valves, it is implied that the charges must be installed in the valves, and the valves be installed in the system, prior to selection of the charges for testing. Handling of explosive charges exposes personnel to significant risks. Since the charges are fabricated and shipped separately, and the testing will be 2 of 4
ND-18-1401 Enclosure Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01) done by the vendor or another offsite test facility, the current requirements would involve shipping of the charges to the site, installation of the charges in the valves (which would be installed in the piping, in containment), removal of the charges, and shipment of the charges back to the vendor or other test facility.
To minimize handling and transportation of explosive charges, it is proposed to select the charges after fabrication and retain for testing at the vendor, or in the worst case, ship them from the vendor to a separate facility for testing.
Proposed Alternative:
In lieu of the requirements of ISTC-3100(d)(2), perform the following:
Select a sample of pyrotechnic charges, following fabrication for testing; this may include charges used for qualification of the batch. The sample shall include a quantity of charges equal to at least 20% of the number of charges of each size installed in the plant and shall include at least one from each manufacturer batch. A description of SNCs planned testing relative to the Code requirements is shown in Table 1 below. Each selected charge shall be tested in a qualified test fixture to confirm the capability of each sampled charge to provide the necessary motive force to operate the valve to perform its intended function without damage to the valve body or connected piping.
Proposed Alternative and Basis for Use:
Basis for Use:
The proposed alternative provides an equivalent level of safety as it ensures the charges are tested to the same criteria, and that the charges are tested from each batch (manufacturer, lot and size). The allowance of crediting the qualification samples is equivalent to or better than ISTC-5260(d), which only requires test firing of one charge per batch prior to installation as a replacement charge.
The requirement regarding inclusion of one test sample from each train is not applicable, because the charges are selected for testing prior to installation in the valve. However, the selection of charges for installation in valves of each train is random; therefore, the level of testing is equivalent.
3 of 4
ND-18-1401 Enclosure Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01)
The proposed alternative provides improved personnel safety by minimizing the transportation and handling of explosive charges.
Because the proposed alternative tests an equivalent number of pyrotechnic charges to the same criteria, this proposed alternative provides an acceptable level of quality and safety in accordance with 10 CFR 50.55a(z)(1).
Duration of Proposed Preservice testing conducted prior to commercial operation.
Alternative:
References:
None.
Status: Awaiting NRC authorization Table 1: Vogtle 3&4 Planned Explosively Actuated Valve Charge Testing per Purchase Specification Number in plants (number Charge per unit x IST IST Number to Number Batch size units) (20%) (1/train) be Tested Fabricated A 14 valves 8 (4 x 2) 2 4 8 16 B 8 valves - 12 (6 x 2) 3 6 8 20 high C 8 valves - 4 (2 x 2) 1 2 8 12 low Notes:
- 1. Each charge size is a single batch
- 2. There are two sizes of charges for the 8 explosively actuated valves, high energy and low energy 4 of 4