ML20045D782

From kanterella
Revision as of 12:37, 26 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Washington State University Modified Triga Reactor: Nuclear Science Center Emergency Plan Updates - Summary of Changes (Revision 1/2020)
ML20045D782
Person / Time
Site: Washington State University
Issue date: 02/14/2020
From: Hines C
Washington State Univ
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML20045D782 (2)


Text

WASHINGTON STATE Nuclear Science Center

" lJNIVERSI1Y February 14, 2020 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Reference:

Washington State University Modified TRIGA Reactor License No. R-76; Docket No.50-027

Subject:

Nuclear Science Center Emergency Plan Updates - Summary of Changes (Revision 1/2020)

To Whom It May Concern:

This letter summarizes changes to update the Nuclear Science Center Emergency Preparedness Plan for the Washington State University Modified TRIGA Reactor performed in accordance with 10 CFR 50.54(q) reported under 10 CFR 50.4. The safety analysis, which is retained on file at the facility, concludes that the changes will not result in a reduction in the effectiveness in response to or in planning for an emergency. The WSU Reactor Safeguards Committee reviewed the safety analysis and approved the changes to the plan on 1/29/2020.

The changes to the NSC Emergency Plan were changes related to font style and general editing, departmental names, location of departments, equipment names, figure updates to reflect the current facility and university campus, clarification of organizational responsibilities, updated references to protective action guidelines, event class emergency action level clarification, and updated references to the most recent safety evaluation report that was issued as part of the 2011 facility license renewal.

If you have any questions, please do not hesitate to contact me.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 2/14/2020 .

Best regards, C. Corey Hines Director PO Box 641 300, Pullman, WA 99164-1 300 509-335-8641 I nsc.or.wsu.edu

WSU EP Updates, Rev. 1/2020 Page 2 of 2 cc: Mr. Duane Hardesty, Sr. Project Manager U.S. Nuclear Regulatory Commission Mr. Craig Bassett, Inspector U.S. Nuclear Regulatory Commission