MONTHYEARIR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update 2024-09-25
[Table view] Category:License-Operator
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21307A2892021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) 2024-01-22
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23227A0892023-07-18018 July 2023 Final QA Related Forms ML23356A1592023-03-17017 March 2023 Final QA Related Forms SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters ML22173A0572022-06-22022 June 2022 Senior Reactor and Reactor Operator Initial License Examinations L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20254A2722020-09-10010 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3).pdf ML20254A1282020-09-10010 September 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20268C1972020-09-0707 September 2020 Miscellaneous Exam Material (Folder 1) ML21025A4032020-09-0707 September 2020 Final QA Related Forms (Folder 1) ML21026A2282020-09-0707 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML21025A4052020-09-0707 September 2020 Form ES-401-6 (Folder 1) ML20267A3982020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20268A3222020-09-0707 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20267A3992020-09-0707 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20268B4372020-08-10010 August 2020 Handouts to Applicants (Folder 3) ML20267A3922020-06-0909 June 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20267A1582020-06-0303 June 2020 Draft Written Examination (Folder 2) ML19352E3032019-12-17017 December 2019 Senior Reactor and Reactor Operator Initial License Examinations: Seabrook Station Unit No. 1 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 SBK-L-18082, Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML18058A0592018-02-27027 February 2018 Initial Operator Licensing Written Examination Approval - Seabrook Station, Unit 1 ML18047A2502018-02-15015 February 2018 Initial Operator Licensing Operating Test Approval - Seabrook Station Unit No. 1 ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18120A2362017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) SBK-L-17151, Miscellaneous Exam Material (Folder 1)2017-09-22022 September 2017 Miscellaneous Exam Material (Folder 1) ML17180A2242017-06-28028 June 2017 Senior Reactor and Reactor Operator Initial License Examinations - Seabrook Station, Unit No. 1 SBK-L-17086, NRC Form 536 Operator Licensing Examination Data2017-05-19019 May 2017 NRC Form 536 Operator Licensing Examination Data ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 SBK-L-16121, Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations2016-07-20020 July 2016 Response to RIS-16-09, Preparation and Scheduling of Operator Licensing Examinations ML16194A0092016-07-11011 July 2016 NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter, Enclosures Withheld from Public) ML15274A2802015-10-0101 October 2015 Requalification Program Inspection - Seabrook Station, Unit 1 ML15119A3062015-04-28028 April 2015 Final Qa/Related Forms (Folder 1) ML15119A3102015-04-0202 April 2015 Miscellaneous Exam Material (Folder 1) ML15098A1012015-03-23023 March 2015 Handouts to Applicants (Folder 3) ML15103A5662015-03-23023 March 2015 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML15098A0592015-03-23023 March 2015 Seabrook - Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15098A0552015-03-19019 March 2015 Final Outlines (Folder 3) ML15076A0912015-03-17017 March 2015 Initial Operator Licensing Written Examination Approval (Seabrook Station, Unit 1) ML15098A1262015-03-0909 March 2015 Final Operating Exam (Sections a, B and C) (Folder 3) ML15103A5652015-02-20020 February 2015 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML15103A5692015-02-0505 February 2015 Draft Written Exam (Folder 2) ML15104A0692015-01-22022 January 2015 Draft Operating Exam (Sections a, B, and C) (Folder 2) ML15103A5672014-12-22022 December 2014 Draft Outlines (Folder 2) ML13255A0022013-09-10010 September 2013 Requalification Program Inspection - SB 1 IR 05000443/20133012013-08-14014 August 2013 Er 05000443-13-301; 7-15-2013 to 7-24-2013; Seabrook Station, Unit No. 1 Initial Operator Licensing Examination Report ML13295A5462013-07-31031 July 2013 Seabrook - Final Qa/Related Forms (Folder 1) ML13207A1472013-07-22022 July 2013 June 5, 2013, NRC Generic Fundamentals Examination Results for Seabrook Station (Cover Letter) ML13206A3502013-07-11011 July 2013 Seabrook - Final Operating Exam (Section a, B, and C) (Folder 3) 2024-01-22
[Table view] |
Text
f\.JE:<Tera ENE..BQX~ WRITTEN EXAMINATION ITEM REVIEW Page 1 of 2
,. ,,,.. *"'"""' - NUCLEAR mrr Directions: (Refer to TR-AA-230-1004 SAT Implementation)
Complete this analysis for each question missed by ~ 40% of the students.
Evaluation Title/Number: 2015 LOIT NRC exam Date the examination was administered: 3/31/15 Number of questions on the examination: 100 Number of questions that were missed by ~ 30% of the 5
students:
Number of students evaluated: 9 Number of students who failed the exam: 0 Percent of students who failed the examination: 0 Complete page 2 of this form.
Indicate AR number(s) generated as a result of this analysis (or indicate "NONE"):
Review performed by:
Date:
Approved by:
TR-M-230-~. Revision 1
i'Jr:-)<1*era'*
EN_§_f=3.~ . . WRITTEN EXAMINATION ITEM REVIEW Page 2 of 2 f *
,. ,""" NUClEAR FLEET
~IST EACH QUESTION THAT WAS MISSED BY~ 30% OF THE STUDENTS Review Conclusions Comment Section
% of # of students Question students who missed the Include a comment for each Number who missed question ANO A. B. c. D. E. F. G. H. "NO" answer. If a corrective action is the question failed the exam generated, list the corrective action number on the front page.
[8]Y rg]Y rg]Y [8]Y [8]Y [8]Y [8]Y [8]Y 11 54 0 ON ON ON ON ON ON ON ON
[8]Y rg]Y rg]Y [8]Y [8]Y IZ!Y IZ!Y IZ!Y 17 45 0 ON ON ON ON ON ON ON ON 31 54 0 IZ!Y [8]Y [8]Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y ON ON ON ON ON ON ON ON 61 33 0 IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y ON ON ON ON ON ON ON ON DY DY DY DY IZ!Y IZ!Y IZ!Y IZ!Y This is a KIA based question from IZI N IZI N !ZIN ~N ON ON ON ON the NRC exam. There is no 97 60 0 specific learning objective but it is a KIA match from random selection process for the exam.
DY DY DY DY DY DY DY DY ON ON ON ON ON ON ON ON DY DY DY DY DY DY DY DY ON ON ON ON ON ON ON ON Review
Conclusions:
Review the question for each of the areas A. Does the test question tie directly to the learning objective(s)?
identified in A through H and check a "Y" for "Yes" or "N" for "No" to B. Is the test question at the same cognitive level as the tested objective(s)?
determine if there is a discrepancy with the question. For any 'NO' C. Does the lesson plan/ instructor guide provide information to support the objective(s)?
response(s) to A-H, initiate a corrective action if needed to define D. Is the training material content correct regarding the exam answer (that is, does the material support the answer or does it lead to an incorrect answer)?
the issues and document the corrective action number on the front E. Is there ONLY one correct answer provided on the exam?
page. Attach this form electronically to the corrective action (if F. Does the exam answer key indicate the correct answer?
written) and file the paper copy with the exam key. One corrective G. Does the test question meet the guidance in TR-AA-230-1002 SAT Design Phase?
action may be used to document multiple issues. H. Is this an acceptable test question per response of A-G (i.e. all 'YES' responses)?
Verify response to column H is 'YES' if no corrective action is indicated.
TR-AA-230-1004-F02, Revision 1
Standard Item Analysis Report On NRCl Version A Course#: 2013-2015 LOIT Instructor:
Course
Title:
2013-2015 LOIT Description 2013-2015 LOIT Day/Time: TermNear:
Total Possible Points: 75.00 Median Score: 69.33 Highest Score: 73.00 Standard Deviation: 1.81 Mean Score: 69.78 Lowest Score: 67.00 Student in this group: 9 Reliability Coefficient (KR20): 0.01 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -
- indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 1 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 2 77.78% 100.00% 50.00% 0.52 D 0 0 2 *7 AB 3 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 4 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 5 66.67% 50.000/o 50.00% 0.17 B 0 *6 I 2 A 6 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 7 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 8 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 9 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 10 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 11 44.44% 0.00% 50.00% -0.38 B 0 *4 1 4 A 12 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 13 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 14 100.00% 100.00% 100.000/o 0.00 A *9 0 0 0 BCD 15 88.89% 100.00% 50.00% 0.54 A *8 0 1 0 BD 16 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 17 55.56% 100.00% 50.00% 0.51 c 0 0 *5 4 AB 18 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 19 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 20 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 21 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 22 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 23 88.89% 100.00% 50.00% 0.54 D 0 1 0 *8 AC 24 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 25 88.89% 100.00% 50.00% 0.35 A *8 1 0 0 CD 26 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 27 100.000/o 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 28 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 29 77.78% 100.00% 50.00% 0.52 B 1 *7 1 0 D 30 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 31 44.44% 100.00% 50.00% 0.36 D 1 1 3 *4 32 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 33 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 34 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 35 88.89% 100.00% 100.00% -0.04 c 1 0 *8 0 BD 36 77.78% 1(1').00% 100.00% 0.23 A *7 1 0 1
- c 37 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 38 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD Page I of2 03/31/15
Standard Item Analysis Report On NRCl Version A Course#: 2013-2015 LOIT Instructor:
Course
Title:
2013-2015 LOIT Description 2013-2015 LOIT Day/Time: Term/Year:
Total Possible Points: 75.00 Median Score: 69.33 Highest Score: 73.00 Standard Deviation: 1.81 Mean Score: 69.78 Lowest Score: 67.00 Student in this group: 9 Reliability Coefficient (KR20): 0.01 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -
- indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 39 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 40 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 41 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 42 100.00°/o 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 43 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 44 77.78% 50.00% 50.00% -0.21 B 0 *7 2 0 AD 45 77.78% 50.00% 50.00% -0.07 B 0 *7 0 2 AC 46 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 47 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 48 88.89% 100.00% 100.00% -0.04 D 1 0 0 *8 BC 49 88.89'1/o 100.00% 100.00% 0.15 A *8 I 0 0 CD 50 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 51 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 52 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 53 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 54 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 55 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 56 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 57 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 58 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 59 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 60 77.78% 100.00% 100.00% -0.21 A *7 1 0 1 c 61 66.67% 100.00% 50.00% 0.30 D 1 0 2 *6 B 62 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 63 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 64 77.78% 100.00% 100.00% -0.07 A *7 1 0 1 c 65 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 66 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 67 88.89'1/o 100.00% 100.00% 0.15 D 1 0 0 *8 BC 68 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 69 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 70 88.89% 100.00% 100.00% 0.15 B 0 *8 1 0 AD 71 88.89% 100.00% 100.00% 0.15 B 0 *8 0 I AC 72 88.89'1/o 100.00% 50.00% 0.54 c 0 0 *8 1 AB 73 88.89% 100.00% 50.00% 0.35 A *8 1 0 0 CD 74 100.00% 100.00% IOQ.00% 0.00 A *9 0 0 0
- BCD 75 77.78% 100.00% 50.00% 0.38 B 0 *7 0 2 AC Page 2 of2 03/31115
Standard Item Analysis Report On NRCSRonll Version A Course#: 2013-2015 LOIT Instructor:
Course
Title:
2013-2015 LOIT Description 2013-2015 LOIT Day/Time: TennNear:
Total Possible Points: 25.00 Median Score: 23.25 Highest Score: 24.00 Standard Deviation: 0.75 Mean Score: 23.20 Lowest Score: 22.00 Student in this group: 5 Reliability Coefficient (KR20): 0.00 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -
- indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 1 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 2 0.00% 0.00% 0.00% 0.00 x 0 0 1 4 AB 3 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 4 0.000/o 0.00% 0.00% 0.00 x 0 5 0 0 ACD 5 0.00% 0.00% 0.00% 0.00 x 0 3 1 1 A 6 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 7 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 8 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 9 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 10 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 11 0.00% 0.000/o 0.000/o 0.00 x 0 2 0 3 AC 12 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 13 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 14 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 15 0.00% 0.00% 0.00% 0.00 x 4 0 1 0 BD 16 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 17 0.000/o 0.00% 0.00% 0.00 x 0 0 3 2 AB 18 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 19 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 20 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 21 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 22 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 23 0.00% 0.00% 0.00% 0.00 x 0 1 0 4 AC 24 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 25 0.00% 0.00% 0.00% 0.00 x 4 1 0 0 CD 26 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 27 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 28 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 29 0.00% 0.00% 0.00% 0.00 x 1 3 1 0 D 30 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 31 0.00% 0.00% 0.00% 0.00 x 0 1 0 4 AC 32 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 33 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 34 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 35 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 36 O.Q<>o/o 0.00% 0.00% 0.00 x 5 0 0 ,o BCD 37 0.000/o 0.00% 0.00% 0.00 x 0 0 0 5 ABC 38 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD Page 1 of3 03/31/15
Standard Item Analysis Report On NRCSRonll Version A Course#: 2013-2015 LOIT Instructor:
Course
Title:
2013-2015 LOIT Description 2013-2015 LOIT Day/Time: TermNear:
Total Possible Points: 25.00 Median Score: 23.25 Highest Score: 24.00 Standard Deviation: 0.75 Mean Score: 23.20 Lowest Score: 22.00 Student in this group: 5 Reliability Coefficient (KR20): 0.00 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies *
- indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 39 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 40 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 41 0.000/o 0.00% 0.00% 0.00 x 0 5 0 0 ACD 42 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 43 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 44 0.000/o 0.00% 0.00% 0.00 x 0 3 2 0 AD 45 0.00% 0.00% 0.00% 0.00 x 0 3 0 2 AC 46 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 47 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 48 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 49 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 50 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 51 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 52 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 53 0.00% 0.000/o 0.00% 0.00 x 0 5 0 0 ACD 54 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 55 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 56 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 57 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 58 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 59 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 60 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 61 0.00% 0.00% 0.00% 0.00 x 0 0 1 4 AB 62 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 63 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 64 0.00% 0.00% 0.00% 0.00 x 4 1 0 0 CD 65 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 66 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 67 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 68 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 69 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 70 0.00% 0.00% 0.00% 0.00 x 0 4 1 0 AD 71 0.00% 0.00% 0.00% 0.00 x 0 4 0 1 AC 72 0.000/o 0.00% 0.00% 0.00 x 0 0 4 1 AB 73 0.00% 0.00% 0.00% 0.00 x 4 I 0 0 CD 74 0.00% 0.0~ 0.00% 0.00 x 5 0 0 0
- BCD 75 0.00% 0.00% 0.00% 0.00 x 0 3 0 2 AC 76 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD Page 2 of3 03/31/15
Standard Item Analysis Report On NRCSRonll Version A Course#: 2013-2015 LOIT Instructor:
Course
Title:
2013-2015 LOIT Description 2013-2015 LOIT Day/Time: Term/Year:
Total Possible Points: 25.00 Median Score: 23.25 Highest Score: 24.00 Standard Deviation: 0.75 Mean Score: 23.20 Lowest Score: 22.00 Student in this group: 5 Reliability Coefficient (KR20): 0.00 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -
- indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 77 100.00% 100.00% 100.00% 0.00 c 0 0 *5 0 ABO 78 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 79 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 80 80.00% 100.00% 0.00% 0.80 B 1 *4 0 0 CD 81 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC 82 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 83 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 84 80.00% 100.00% 100.00% 0.13 B 0 *4 1 0 AD 85 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC 86 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 87 80.00% 0.00% 100.00% -0.53 A *4 I 0 0 CD 88 80.00% 100.00% 0.00% 0.80 c 0 1 *4 0 AD 89 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 90 100.00% 100.00% 100.00% 0.00 c 0 0 *5 0 ABD 91 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 92 100.00% 100.00% 100.00% 0.00 c 0 0 *5 0 ABD 93 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC 94 80.00% 100.00% 100.00% -0.53 A *4 1 0 0 CD 95 80.00% 100.00% 100.00% 0.13 c 0 0 *4 1 AB 96 100.00% 100.00"A. 100.00% 0.00 A *5 0 0 0 BCD 97 40.00% 100.00% 0.00% 0.87 B 2 *2 0 1 c 98 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 99 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 10 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC Page 3 of3 03/31115
2015 Written Exam questions and responses.
Question Student 5 * , ' Question: What does pressure boundary mean?
Reply: Means pressure boundary of #2 seal.
8 Question: Does this question assume this is how we operate now?
Reply: Yes.
14 Question: Should I assume normal controller alignemt?
Reply: Yes 16 Question: Answer A and C would both require the reactor to be tripped.
A would be faster. Should we answer based on no operator action?
Reply: I cannot give you any information.
23 Question: Should IR level be in amps?
Reply: Correct as written.
46 Question: What is the meaning of "current"?
Reply: Means all bulleted items has occurred and time is now.
44 Question: Should I assume its the controlling channel?
Reply: Yes 45 Question: "5" Hg back pressure" is it absolute?
Reply: Called NRC, Chris Lally. Decided to add A the Hg. (hgA) to indicate it is absolute. Made change to master exam. Wrote on white board and called attention to entire class.
97 Question: Did rest of surveillance get completed. Cycling of PORV is part of RC-OT004. (Note, this is incorrect and was not told to student.)
Reply: Called NRC, Chris Lally. Decided to tel student that they have all information required.
71 Question: Is the time, 15 minutes, the time taken to install and remove the shielding?
Reply: Answer question as written.
44 Question: What does initially mean?
Reply: Right then.
85 Question: How can you answer question without P fig 2 Reply: You have all the information you need.
87 Question: Were you successful in E-2?
Reply: If it were unsuccessful it would be specified.
71 Question: Is this after 6 or 12 seconds?
Reply: Answer what's going to happen?
PROCTOR SRO RO SRO RO SRO RO SRO RO SRO
era ENERGY- SEABROOK December 22, 2014 Docket 50-443 SBK-L-14238 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/ Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations In a letter dated October 1, 2014, NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of March 23, 2015. The letter requested examination outlines be provided by January 8, 2015 with the written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security," to be furnished by February 6, 2015.
Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:
ES-201-2, Examination Outline Quality Checklist ES-201-3, Examination Security Agreement ES-301-1, Administrative Topics ES-301-2, Control Room/In-Plant Systems Outline ES-301-5, Transient and Event Checklist ES-D-ls, Scenario Outlines ES-401-2, PWR Examination Outline ES-401-3, Generic Knowledge and Abilities Outline ES-401-4, Record of Rejected K/As Outline of Sampling Methodology and Kl A Suppression Report The information provided in the enclosure is confidential in nature and is not for release to the public NextEra Energy Seabrook, LLC.
626 Lafayette Rd, Seabrook, NH 03874
U.S. Nuclear Regulatory Commission SBK-L-14238/Page 2 Should you have any questions regarding this matter, please contact Mr. Ed Pigott, Operations Training Supervisor, at (603) 773-7192.
Sincerely, NextEra Energy Seabrook, LLC cc (Without Enclosures):
Document Control Desk D. Dorman, NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Lamb, NRC Project Manager, Project Directorate I-2 P. Cataldo, NRC Senior Resident Inspector
era*
ENERGV- SEABROOK January 22, 2015 Docket 50-443 SBK-L-15011 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations
Reference:
SBK-L-14238, Submittal oflnformation for Operator Licensing Examinations, December 22, 2014 In a letter dated October 1, 2014, NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of March 23, 2015. The letter requested examination outlines be provided by January 8, 2015 with the written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security," to be furnished by February 6, 2015.
Per your request, NextEra Energy Seabrook, LLC encloses simulator scenarios, Job Performance Measures (JPMs) and related supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security." The remaining requested information will be submitted by February 6, 2015.
The information provided in the enclosure is confidential in nature and is not for release to the public.
NextEra Energy Seabrook, LLC.
626 Lafayette Rd, Seabrook, NH 03874
U.S. Nuclear Regulatory Commission SBK-L-15011/Page 2 Should you have any questions regarding this matter, please contact Mr. Ed Pigott, Operations Training General Supervisor, at (603) 773-7192.
Sincerely, NextEra Energy Seabrook, LLC Licensing Manager cc (Without Enclosures):
Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Lamb, NRC Project Manager, Project Directorate 1-2 NRC Senior Resident Inspector
era' ENERGY~
SEABROOK February 5, 2015 Docket 50-443 SBK-L-15022 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations
References:
- 1. SBK-L-14238, Submittal oflnformation for Operator Licensing Examinations, December 22, 2014
- 2. SBK-L-15011, Submittal oflnformation for Operator Licensing Examinations, January 22, 2015 In a letter dated October 1, 2014, NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of March 23, 2015. The letter requested examination outlines be provided by January 8, 2015 with the written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security," to be furnished by February 6, 2015.
Per your request, NextEra Energy Seabrook, LLC encloses the written examinations and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security."
The information provided in the enclosure is confidential in nature and is not for release to the public.
NextEra Energy Seabrook, LLC.
626 Lafayette Rd, Seabrook, NH 03874
U.S. Nuclear Regulatory Commission SBK-L-15022/Page 2 Should you have any questions regarding this matter, please contact Mr. Ed Pigott, Operations Training General Supervisor, at (603) 773-7192.
Sincerely, NextEra Energy Seabrook, LLC
. I~
I ~JJ&-
i ) ' I ~
h,1 <
' . '- I '
Michael Ossing Licensing Manager cc (Without Enclosures):
Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Lamb, NRC Project Manager, Project Directorate I-2 NRC Senior Resident Inspector