ML15119A310

From kanterella
Revision as of 12:22, 5 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Miscellaneous Exam Material (Folder 1)
ML15119A310
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/02/2015
From: Bryant R
NextEra Energy Seabrook
To: David Silk
Operations Branch I
Shared Package
ML14254A318 List:
References
TAC U01915
Download: ML15119A310 (15)


Text

f\.JE:<Tera ENE..BQX~ WRITTEN EXAMINATION ITEM REVIEW Page 1 of 2

,. ,,,.. *"'"""' - NUCLEAR mrr Directions: (Refer to TR-AA-230-1004 SAT Implementation)

Complete this analysis for each question missed by ~ 40% of the students.

Evaluation Title/Number: 2015 LOIT NRC exam Date the examination was administered: 3/31/15 Number of questions on the examination: 100 Number of questions that were missed by ~ 30% of the 5

students:

Number of students evaluated: 9 Number of students who failed the exam: 0 Percent of students who failed the examination: 0 Complete page 2 of this form.

Indicate AR number(s) generated as a result of this analysis (or indicate "NONE"):

Review performed by:

Date:

Approved by:

TR-M-230-~. Revision 1

i'Jr:-)<1*era'*

EN_§_f=3.~ . . WRITTEN EXAMINATION ITEM REVIEW Page 2 of 2 f *

,. ,""" NUClEAR FLEET

~IST EACH QUESTION THAT WAS MISSED BY~ 30% OF THE STUDENTS Review Conclusions Comment Section

% of # of students Question students who missed the Include a comment for each Number who missed question ANO A. B. c. D. E. F. G. H. "NO" answer. If a corrective action is the question failed the exam generated, list the corrective action number on the front page.

[8]Y rg]Y rg]Y [8]Y [8]Y [8]Y [8]Y [8]Y 11 54 0 ON ON ON ON ON ON ON ON

[8]Y rg]Y rg]Y [8]Y [8]Y IZ!Y IZ!Y IZ!Y 17 45 0 ON ON ON ON ON ON ON ON 31 54 0 IZ!Y [8]Y [8]Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y ON ON ON ON ON ON ON ON 61 33 0 IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y IZ!Y ON ON ON ON ON ON ON ON DY DY DY DY IZ!Y IZ!Y IZ!Y IZ!Y This is a KIA based question from IZI N IZI N !ZIN ~N ON ON ON ON the NRC exam. There is no 97 60 0 specific learning objective but it is a KIA match from random selection process for the exam.

DY DY DY DY DY DY DY DY ON ON ON ON ON ON ON ON DY DY DY DY DY DY DY DY ON ON ON ON ON ON ON ON Review

Conclusions:

Review the question for each of the areas A. Does the test question tie directly to the learning objective(s)?

identified in A through H and check a "Y" for "Yes" or "N" for "No" to B. Is the test question at the same cognitive level as the tested objective(s)?

determine if there is a discrepancy with the question. For any 'NO' C. Does the lesson plan/ instructor guide provide information to support the objective(s)?

response(s) to A-H, initiate a corrective action if needed to define D. Is the training material content correct regarding the exam answer (that is, does the material support the answer or does it lead to an incorrect answer)?

the issues and document the corrective action number on the front E. Is there ONLY one correct answer provided on the exam?

page. Attach this form electronically to the corrective action (if F. Does the exam answer key indicate the correct answer?

written) and file the paper copy with the exam key. One corrective G. Does the test question meet the guidance in TR-AA-230-1002 SAT Design Phase?

action may be used to document multiple issues. H. Is this an acceptable test question per response of A-G (i.e. all 'YES' responses)?

Verify response to column H is 'YES' if no corrective action is indicated.

TR-AA-230-1004-F02, Revision 1

Standard Item Analysis Report On NRCl Version A Course#: 2013-2015 LOIT Instructor:

Course

Title:

2013-2015 LOIT Description 2013-2015 LOIT Day/Time: TermNear:

Total Possible Points: 75.00 Median Score: 69.33 Highest Score: 73.00 Standard Deviation: 1.81 Mean Score: 69.78 Lowest Score: 67.00 Student in this group: 9 Reliability Coefficient (KR20): 0.01 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -

  • indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 1 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 2 77.78% 100.00% 50.00% 0.52 D 0 0 2 *7 AB 3 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 4 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 5 66.67% 50.000/o 50.00% 0.17 B 0 *6 I 2 A 6 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 7 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 8 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 9 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 10 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 11 44.44% 0.00% 50.00% -0.38 B 0 *4 1 4 A 12 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 13 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 14 100.00% 100.00% 100.000/o 0.00 A *9 0 0 0 BCD 15 88.89% 100.00% 50.00% 0.54 A *8 0 1 0 BD 16 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 17 55.56% 100.00% 50.00% 0.51 c 0 0 *5 4 AB 18 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 19 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 20 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 21 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 22 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 23 88.89% 100.00% 50.00% 0.54 D 0 1 0 *8 AC 24 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 25 88.89% 100.00% 50.00% 0.35 A *8 1 0 0 CD 26 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 27 100.000/o 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 28 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 29 77.78% 100.00% 50.00% 0.52 B 1 *7 1 0 D 30 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 31 44.44% 100.00% 50.00% 0.36 D 1 1 3 *4 32 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 33 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 34 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 35 88.89% 100.00% 100.00% -0.04 c 1 0 *8 0 BD 36 77.78% 1(1').00% 100.00% 0.23 A *7 1 0 1
  • c 37 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 38 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD Page I of2 03/31/15

Standard Item Analysis Report On NRCl Version A Course#: 2013-2015 LOIT Instructor:

Course

Title:

2013-2015 LOIT Description 2013-2015 LOIT Day/Time: Term/Year:

Total Possible Points: 75.00 Median Score: 69.33 Highest Score: 73.00 Standard Deviation: 1.81 Mean Score: 69.78 Lowest Score: 67.00 Student in this group: 9 Reliability Coefficient (KR20): 0.01 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -

  • indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 39 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 40 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 41 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 42 100.00°/o 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 43 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 44 77.78% 50.00% 50.00% -0.21 B 0 *7 2 0 AD 45 77.78% 50.00% 50.00% -0.07 B 0 *7 0 2 AC 46 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 47 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 48 88.89% 100.00% 100.00% -0.04 D 1 0 0 *8 BC 49 88.89'1/o 100.00% 100.00% 0.15 A *8 I 0 0 CD 50 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 51 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 52 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 53 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 54 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 55 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 56 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 57 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 58 100.00% 100.00% 100.00% 0.00 A *9 0 0 0 BCD 59 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 60 77.78% 100.00% 100.00% -0.21 A *7 1 0 1 c 61 66.67% 100.00% 50.00% 0.30 D 1 0 2 *6 B 62 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 63 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 64 77.78% 100.00% 100.00% -0.07 A *7 1 0 1 c 65 100.00% 100.00% 100.00% 0.00 D 0 0 0 *9 ABC 66 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 67 88.89'1/o 100.00% 100.00% 0.15 D 1 0 0 *8 BC 68 100.00% 100.00% 100.00% 0.00 c 0 0 *9 0 ABD 69 100.00% 100.00% 100.00% 0.00 B 0 *9 0 0 ACD 70 88.89% 100.00% 100.00% 0.15 B 0 *8 1 0 AD 71 88.89% 100.00% 100.00% 0.15 B 0 *8 0 I AC 72 88.89'1/o 100.00% 50.00% 0.54 c 0 0 *8 1 AB 73 88.89% 100.00% 50.00% 0.35 A *8 1 0 0 CD 74 100.00% 100.00% IOQ.00% 0.00 A *9 0 0 0
  • BCD 75 77.78% 100.00% 50.00% 0.38 B 0 *7 0 2 AC Page 2 of2 03/31115

Standard Item Analysis Report On NRCSRonll Version A Course#: 2013-2015 LOIT Instructor:

Course

Title:

2013-2015 LOIT Description 2013-2015 LOIT Day/Time: TennNear:

Total Possible Points: 25.00 Median Score: 23.25 Highest Score: 24.00 Standard Deviation: 0.75 Mean Score: 23.20 Lowest Score: 22.00 Student in this group: 5 Reliability Coefficient (KR20): 0.00 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -

  • indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 1 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 2 0.00% 0.00% 0.00% 0.00 x 0 0 1 4 AB 3 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 4 0.000/o 0.00% 0.00% 0.00 x 0 5 0 0 ACD 5 0.00% 0.00% 0.00% 0.00 x 0 3 1 1 A 6 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 7 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 8 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 9 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 10 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 11 0.00% 0.000/o 0.000/o 0.00 x 0 2 0 3 AC 12 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 13 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 14 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 15 0.00% 0.00% 0.00% 0.00 x 4 0 1 0 BD 16 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 17 0.000/o 0.00% 0.00% 0.00 x 0 0 3 2 AB 18 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 19 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 20 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 21 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 22 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 23 0.00% 0.00% 0.00% 0.00 x 0 1 0 4 AC 24 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 25 0.00% 0.00% 0.00% 0.00 x 4 1 0 0 CD 26 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 27 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 28 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 29 0.00% 0.00% 0.00% 0.00 x 1 3 1 0 D 30 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 31 0.00% 0.00% 0.00% 0.00 x 0 1 0 4 AC 32 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 33 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 34 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 35 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 36 O.Q<>o/o 0.00% 0.00% 0.00 x 5 0 0 ,o BCD 37 0.000/o 0.00% 0.00% 0.00 x 0 0 0 5 ABC 38 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD Page 1 of3 03/31/15

Standard Item Analysis Report On NRCSRonll Version A Course#: 2013-2015 LOIT Instructor:

Course

Title:

2013-2015 LOIT Description 2013-2015 LOIT Day/Time: TermNear:

Total Possible Points: 25.00 Median Score: 23.25 Highest Score: 24.00 Standard Deviation: 0.75 Mean Score: 23.20 Lowest Score: 22.00 Student in this group: 5 Reliability Coefficient (KR20): 0.00 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies *

  • indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 39 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 40 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 41 0.000/o 0.00% 0.00% 0.00 x 0 5 0 0 ACD 42 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 43 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 44 0.000/o 0.00% 0.00% 0.00 x 0 3 2 0 AD 45 0.00% 0.00% 0.00% 0.00 x 0 3 0 2 AC 46 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 47 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 48 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 49 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 50 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 51 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 52 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 53 0.00% 0.000/o 0.00% 0.00 x 0 5 0 0 ACD 54 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 55 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 56 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 57 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 58 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 59 0.000/o 0.00% 0.00% 0.00 x 0 0 5 0 ABD 60 0.00% 0.00% 0.00% 0.00 x 5 0 0 0 BCD 61 0.00% 0.00% 0.00% 0.00 x 0 0 1 4 AB 62 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 63 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 64 0.00% 0.00% 0.00% 0.00 x 4 1 0 0 CD 65 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 66 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 67 0.00% 0.00% 0.00% 0.00 x 0 0 0 5 ABC 68 0.00% 0.00% 0.00% 0.00 x 0 0 5 0 ABD 69 0.00% 0.00% 0.00% 0.00 x 0 5 0 0 ACD 70 0.00% 0.00% 0.00% 0.00 x 0 4 1 0 AD 71 0.00% 0.00% 0.00% 0.00 x 0 4 0 1 AC 72 0.000/o 0.00% 0.00% 0.00 x 0 0 4 1 AB 73 0.00% 0.00% 0.00% 0.00 x 4 I 0 0 CD 74 0.00% 0.0~ 0.00% 0.00 x 5 0 0 0
  • BCD 75 0.00% 0.00% 0.00% 0.00 x 0 3 0 2 AC 76 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD Page 2 of3 03/31/15

Standard Item Analysis Report On NRCSRonll Version A Course#: 2013-2015 LOIT Instructor:

Course

Title:

2013-2015 LOIT Description 2013-2015 LOIT Day/Time: Term/Year:

Total Possible Points: 25.00 Median Score: 23.25 Highest Score: 24.00 Standard Deviation: 0.75 Mean Score: 23.20 Lowest Score: 22.00 Student in this group: 5 Reliability Coefficient (KR20): 0.00 Student Records Based On: All Students Correct Group Responses Point Correct Response Frequencies -

  • indicates correct answer Non No. Total Upper27% Lower27% Biserial Answer A B c D Distractor 77 100.00% 100.00% 100.00% 0.00 c 0 0 *5 0 ABO 78 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 79 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 80 80.00% 100.00% 0.00% 0.80 B 1 *4 0 0 CD 81 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC 82 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 83 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 84 80.00% 100.00% 100.00% 0.13 B 0 *4 1 0 AD 85 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC 86 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 87 80.00% 0.00% 100.00% -0.53 A *4 I 0 0 CD 88 80.00% 100.00% 0.00% 0.80 c 0 1 *4 0 AD 89 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 90 100.00% 100.00% 100.00% 0.00 c 0 0 *5 0 ABD 91 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 92 100.00% 100.00% 100.00% 0.00 c 0 0 *5 0 ABD 93 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC 94 80.00% 100.00% 100.00% -0.53 A *4 1 0 0 CD 95 80.00% 100.00% 100.00% 0.13 c 0 0 *4 1 AB 96 100.00% 100.00"A. 100.00% 0.00 A *5 0 0 0 BCD 97 40.00% 100.00% 0.00% 0.87 B 2 *2 0 1 c 98 100.00% 100.00% 100.00% 0.00 A *5 0 0 0 BCD 99 100.00% 100.00% 100.00% 0.00 B 0 *5 0 0 ACD 10 100.00% 100.00% 100.00% 0.00 D 0 0 0 *5 ABC Page 3 of3 03/31115

2015 Written Exam questions and responses.

Question Student 5 * , ' Question: What does pressure boundary mean?

Reply: Means pressure boundary of #2 seal.

8 Question: Does this question assume this is how we operate now?

Reply: Yes.

14 Question: Should I assume normal controller alignemt?

Reply: Yes 16 Question: Answer A and C would both require the reactor to be tripped.

A would be faster. Should we answer based on no operator action?

Reply: I cannot give you any information.

23 Question: Should IR level be in amps?

Reply: Correct as written.

46 Question: What is the meaning of "current"?

Reply: Means all bulleted items has occurred and time is now.

44 Question: Should I assume its the controlling channel?

Reply: Yes 45 Question: "5" Hg back pressure" is it absolute?

Reply: Called NRC, Chris Lally. Decided to add A the Hg. (hgA) to indicate it is absolute. Made change to master exam. Wrote on white board and called attention to entire class.

97 Question: Did rest of surveillance get completed. Cycling of PORV is part of RC-OT004. (Note, this is incorrect and was not told to student.)

Reply: Called NRC, Chris Lally. Decided to tel student that they have all information required.

71 Question: Is the time, 15 minutes, the time taken to install and remove the shielding?

Reply: Answer question as written.

44 Question: What does initially mean?

Reply: Right then.

85 Question: How can you answer question without P fig 2 Reply: You have all the information you need.

87 Question: Were you successful in E-2?

Reply: If it were unsuccessful it would be specified.

71 Question: Is this after 6 or 12 seconds?

Reply: Answer what's going to happen?

PROCTOR SRO RO SRO RO SRO RO SRO RO SRO

era ENERGY- SEABROOK December 22, 2014 Docket 50-443 SBK-L-14238 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/ Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations In a letter dated October 1, 2014, NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of March 23, 2015. The letter requested examination outlines be provided by January 8, 2015 with the written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security," to be furnished by February 6, 2015.

Per your request, NextEra Energy Seabrook, LLC encloses the examination outlines as follows:

ES-201-2, Examination Outline Quality Checklist ES-201-3, Examination Security Agreement ES-301-1, Administrative Topics ES-301-2, Control Room/In-Plant Systems Outline ES-301-5, Transient and Event Checklist ES-D-ls, Scenario Outlines ES-401-2, PWR Examination Outline ES-401-3, Generic Knowledge and Abilities Outline ES-401-4, Record of Rejected K/As Outline of Sampling Methodology and Kl A Suppression Report The information provided in the enclosure is confidential in nature and is not for release to the public NextEra Energy Seabrook, LLC.

626 Lafayette Rd, Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L-14238/Page 2 Should you have any questions regarding this matter, please contact Mr. Ed Pigott, Operations Training Supervisor, at (603) 773-7192.

Sincerely, NextEra Energy Seabrook, LLC cc (Without Enclosures):

Document Control Desk D. Dorman, NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Lamb, NRC Project Manager, Project Directorate I-2 P. Cataldo, NRC Senior Resident Inspector

era*

ENERGV- SEABROOK January 22, 2015 Docket 50-443 SBK-L-15011 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations

Reference:

SBK-L-14238, Submittal oflnformation for Operator Licensing Examinations, December 22, 2014 In a letter dated October 1, 2014, NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of March 23, 2015. The letter requested examination outlines be provided by January 8, 2015 with the written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security," to be furnished by February 6, 2015.

Per your request, NextEra Energy Seabrook, LLC encloses simulator scenarios, Job Performance Measures (JPMs) and related supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security." The remaining requested information will be submitted by February 6, 2015.

The information provided in the enclosure is confidential in nature and is not for release to the public.

NextEra Energy Seabrook, LLC.

626 Lafayette Rd, Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L-15011/Page 2 Should you have any questions regarding this matter, please contact Mr. Ed Pigott, Operations Training General Supervisor, at (603) 773-7192.

Sincerely, NextEra Energy Seabrook, LLC Licensing Manager cc (Without Enclosures):

Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Lamb, NRC Project Manager, Project Directorate 1-2 NRC Senior Resident Inspector

era' ENERGY~

SEABROOK February 5, 2015 Docket 50-443 SBK-L-15022 United States Nuclear Regulatory Commission Attn: Mr. David Silk, Senior Operations Engineer/Chief Examiner 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 Seabrook Station Submittal of Information for Operator Licensing Examinations

References:

1. SBK-L-14238, Submittal oflnformation for Operator Licensing Examinations, December 22, 2014
2. SBK-L-15011, Submittal oflnformation for Operator Licensing Examinations, January 22, 2015 In a letter dated October 1, 2014, NextEra Energy Seabrook, LLC was requested to furnish documentation to support the administration of Senior Reactor Operator and Reactor Operator licensing examinations scheduled for the week of March 23, 2015. The letter requested examination outlines be provided by January 8, 2015 with the written examinations, operating tests, and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security," to be furnished by February 6, 2015.

Per your request, NextEra Energy Seabrook, LLC encloses the written examinations and supporting reference materials identified in Attachment 3 of ES-201, "Initial Licensing Examination Process; Examination Security."

The information provided in the enclosure is confidential in nature and is not for release to the public.

NextEra Energy Seabrook, LLC.

626 Lafayette Rd, Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L-15022/Page 2 Should you have any questions regarding this matter, please contact Mr. Ed Pigott, Operations Training General Supervisor, at (603) 773-7192.

Sincerely, NextEra Energy Seabrook, LLC

. I~

I ~JJ&-

i ) ' I ~

h,1 <

' . '- I '

Michael Ossing Licensing Manager cc (Without Enclosures):

Document Control Desk NRC Region I Administrator D. E. Jackson, NRC Region I Operations Branch Chief J. Lamb, NRC Project Manager, Project Directorate I-2 NRC Senior Resident Inspector