IR 05000373/2008005
Download: ML090370950
Text
February 6, 2009
Mr. Charles Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INTEGRATED INSPECTION REPORT 05000373/2008005; 05000374/2008005
Dear Mr. Pardee:
On December 31, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your LaSalle County Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on January 13, 2009, with Site Vice President, Mr. Daniel Enright, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, one NRC-identified finding of very low safety significance was identified. The finding involved a violation of NRC requirements. However, because of it's very low safety significance, and because the issue was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation (NCV) in accordance with Section VI.A.1 of the NRC Enforcement Policy. If you contest the subject or severity of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector Office at the LaSalle County Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18
Enclosure:
Inspection Report 05000373/2008005; 05000374/2008005
w/Attachment:
Supplemental Information cc w/encl: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Manager Regulatory Assurance - LaSalle County Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission
SUMMARY OF FINDINGS
......................................................................................................... 1
REPORT DETAILS
..................................................................................................................... 2 Summary of Plant Status......................................................................................................... 2 1. SAFETY .................................................................................................................. 2
1R01 Adverse Weather Protection
.................................................... 2
1R04 Equipment Alignment
............................................................... 3
1R05 Fire Protection
......................................................................... 4
1R06 Flooding
................................................................................... 5
1R11 Licensed Operator Requalification Program
............................. 5
1R12 Maintenance Effectiveness
...................................................... 6
1R13 Maintenance Risk Assessments and Emergent Work Control
.. 7
1R15 Operability Evaluations
............................................................ 8
1R19 Post-Maintenance Testing
....................................................... 8
1R22 Surveillance Testing
RADIATION SAFETY
................................................................................................. 10 2PS2 Radioactive Material Processing and Transportation (71122.02)
OTHER ACTIVITIES
................................................................................................... 13
4OA1 Performance Indicator Verification
.............................................. 13
4OA2 Identification and Resolution of Problems
................................... 16
4OA5 Other Activities......................................................................................... 20 4OA6
Management Meetings ............................................................................ 21 4OA7 Licensee-Identified Violations .................................................................. 22
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- D. Enright, Site Vice President
- D. Rhoades, Plant Manager
- J. Bashor, Site Engineering Director
- L. Blunk, Operations Training Manager
- S. Wilkinson, Chemistry Manager
- H. Do, Corporate Inservice Inspection Manager
- B. Ginter, Engineering Programs Manager
- F. Gogliotti, System Engineering Senior Manager
- W. Hilton, Engineering Supervisor - Mechanical/Structural
- K. Ihnen, Nuclear Oversight Manager
- A. Kochis, Inservice Inspection Engineer
- R. Leasure, Radiation Protection Manager
- S. Marik, Operations Director
- B. Rash, Maintenance Director
- J. Rommel, Design Engineering Senior Manager
- K. Rusley, Emergency Preparedness Manager
- J. Shields, Inservice Inspection Program Supervisor
- T. Simpkin, Regulatory Assurance Manager
- H. Vinyard, Shift Operations Superintendent
- G. Wilhelmsen, Design Manager
- J. White, Site Training Director
- C. Wilson, Station Security Manager
- D. Amezaga, GL 89-13 Program Owner
- J.C. Feeney, NOS Lead Assessor
- D. Henly, Design Engineer Nuclear Regulatory Commission
- K. Riemer, Chief, Reactor Projects Branch 2
LIST OF ITEMS
OPENED, CLOSED AND DISCUSSED
Opened
- 05000374/2008005-01 NCV Failure to Incorporate Regulatory Guide 1.9 Testing Methodology into Procedures (Section 4OA2.4)
Closed
- 05000374/FIN-2008005-01 NCV Failure to Incorporate Regulatory Guide 1.9 Testing Methodology into Procedures (Section 4OA2.4)
- 05000374/FIN-2007004-03 URI State Of South Carolina Suspended Access To Barnwell Disposal Facility On August 22, 2007 (Section 4OA5)
- Attachment
LIST OF DOCUMENTS REVIEWED
The following is a partial list of documents reviewed during the inspection.
- Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
- Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1R01 Adverse Weather Protection PROCEDURES Number Description or Title Date or Revision
- LOP-CW-09 Circulation Water System Ice Melting (CW) Rev. 13
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 848282 Gap Identified in
- LOS-ZZ-A2 11/21/2008
- 849759
- OFP-FB256 Can Freeze without Auxiliary Heating in the Winter 12/1/2008
- WORK DOCUMENTS Number Description or Title Date or Revision
- 01086796
- LOS-ZZ-A2 Winterize Station Att. A 10/16/2008
- MISCELLANEOUS Number Description or Title Date or Revision
- ZZ-A2 winter mode for '08.doc:
- Notes on
- LOS-ZZ-A2 Gap -
- 1R04 Equipment Alignment
- PROCEDURES Number Description or Title Date or Revision
- LOP-DG-03M Unit 0 Diesel Generator Mechanical Checklist Rev. 8
- LOP-RH-01E Unit 1 RHR Service water System Electrical Checklist Rev. 8
- LOP-RHWS-1AM Unit 1 A RHR Service Water System Mechanical Checklist Rev. 2
- LOP-VC-01M Unit 0 Control room HVAC System Mechanical Rev. 11
- Attachment PROCEDURES Number Description or Title Date or Revision Checklist
- LOS-DG-03E Unit 0 Diesel generator Electrical Checklist Rev. 9
- 1R05 Fire Protection
- MISCELLANEOUS Number Description or Title Date or Revision
- LaSalle County Station Fire Protection Report 2008
- UFSAR 2008
- 1R06 Flooding OPERABILITY EVALUATIONS Number Description or Title Date or Revision
- OP-AA-108-115 Attachment 1:
- Operability Evaluation OE07-004, Rev. 3 Rev. 6
- 1R11 Licensed Operator Requalification
- MISCELLANEOUS Number Description or Title Date or Revision
- ESG 89 Out of the Box Simulator Training Scenario Rev. 0
- Licensed Operator Exam Results
- 1R12 Maintenance Effectiveness
- PROCEDURES Number Description or Title Date or Revision
- LOS-PC-Q1 Primary Containment Isolation Valves Operability Test and Inservice Inspection Rev. 40
- LOS-PC-Q2 Primary Containment Isolation Valves Operability Test and Inservice Inspection for Modes 4, 5 or Defueled Rev. 48
- Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 369810 A VE Compressor Trip on High Oil Temperature 9/2/2005
- 382688 4 Maintenance Rule Functional Failure on A VE System 10/6/2005
- 533989 2RE024 Failed the
- LOS-PC-Q1 and is Inoperable 9/21/2006
- 533989 2RE024 Failed the
- LOS-PC-Q1 and is Inoperable 9/21/2006
- 552969 1B22-F019 Stroke Time Exceeded Required Action Time 11/3/2006
- 595195 2CM023B Indicates Dual when Stroking from Open to Close 2/23/2007
- 596171 1B33-F019 Continues to Degrade for 1st Stroke Timing 2/26/2007
- 598483 2IN100 Fails 1st Surveillance Acceptance (Cycle time) 3/2/2007
- 643264 1E12-F097 Found Failed During Acoustic Testing 6/22/2007
- 661902 2G33-Z001-06A Didn't Close in 'Hold' 8/17/2007
- 709276 0VE09YB Damper Failure 12/9/2007
- 771286 0VE04CB Oil Level Low 5/3/2008
- 773160 Work Order to Replace 1B33-F019 Limit Switch in L1R13 5/8/2008
- 792275 Stem Lube Coordination Issue 7/1/2008
- 798472 1RE024 Open Cycle Time Excessive 7/20/2008
- 799179 Galling Discovered on 1RE024 Valve Stem 7/22/2008
- 802717 1RF013 Close Time Greater Than Required Action Range 8/1/2008
- 802802 ASCO 3-Way Solenoid Required Replacement 8/1/2008
- 807707 B VE Compressor Shaft Oil Leak 8/15/2008
- 808172 Vibration Analysis Identifies Minor Impacting in Compressor 8/18/2008
- 808829 1RE024 Shows Dual when Required to be Full Closed 8/19/2008
- 814387 Vibration Levels on 0VE04CB Trending Upward 9/5/2008
- 817100 0B VE Compressor Parameter Change 9/12/2008
- 819855 PCIS (PC-04) Exceeded Maintenance Rule Criteria 9/19/2008
- 849321 Maintenance Rule Function
- VE-01 Performance Criteria Exceeded 11/25/2008
- 850385 B VE Comp. Freon Level at Cold Weather Minimum 11/29/2008
- 854189 Work Order Needed for Internal Inspection of 0VC05CB 12/9/2008
- 854195 Work Order Needed for Internal Inspection of 0VE04CA 12/9/2008
- Attachment MISCELLANEOUS Number Description or Title Date or Revision
- Maintenance Rule Scoping for
- PC-03,
- PC-04,
- PC-05 various
- Performance Criteria Report, PCIS for
- PC-03,
- PC-04,
- PC-05
- Performance Monitoring - Condition Monitoring
- PC-03
- 10/2006 - 10/2008
- Performance Monitoring - Reliability
- PC-03
- 10/2006 - 10/2008
- Performance Monitoring - Reliability
- PC-04
- 10/2006 - 10/2008
- Performance Monitoring - Reliability
- PC-05
- 10/2006 - 10/2008
- Risk Significance Summary for
- PC-03,
- PC-04,
- PC-05 various Determination
- IR 819855 Determination Template for
- PC-04 ASME XI Stroke Time Testing for all Primary Containment 10/21/2008
- LSCS-UFSAR, Section 9.4 Heating, Ventilation and Air Conditioning Systems Maintenance Rule Expert Panel Meeting Agenda 5/15/2008
- MAINTENANCE RULE Number Description or Title Date or Revision
- Maintenance Rule Evaluation - PCIV April 2008
- 1R13 Maintenance Risk Assessments and Emergent Work Control PROCEDURES Number Description or Title Date or Revision
- LEP-DG-105 Maintenance and Adjustment of Woodward U 8 Governor Shutdown Solenoids Rev. 12
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 829363 NOS ID:
- Response to Potential Common Cause Failure of 1B
- DG 10/10/2008
- 836161 On Line Risk Turns Red on a Loss of Standby DC Charger 11/27/2008
- 844283 Unexpected group 1 MSIV Half-Isolation Signal 11/12/2008
- 828185 Issue Resolution Documentation Form - 1B DG failed to start during monthly surveillance Rev. 6
- Attachment WORK DOCUMENTS Number Description or Title Date or Revision
- Plant Status:
- LaSalle Plant Conditions 10/27/2008
- Operations Log 11/13/2008
- Operations Log 11/14/2008
- DRAWINGS Number Description or Title Date or Revision 1E-1-4232AD Schematic Diagram Primary Containment & Reactor Vessel Isolation System "PC" (B21H) Part 4 Rev. AG
- MISCELLANEOUS Number Description or Title Date or Revision VETIP VM# J-0157 Woodward Governor - Installation & Operation Manual for Shutdown Solenoid for UG Governor Rev. T
- 1R15 Operability Evaluations
- PROCEDURES Number Description or Title Date or Revision
- LOS-DG-SR6 Division 2 Cooling Water System Test Rev. 9
- LOS-RD-SR5 Control Rod Drive Timing 1/10/2007
- LS-AA-1110 Reportable Event SAF 1.8:
- Event or Condition That Could Have Prevented Fulfillment of a Safety Function Rev. 12
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 824848 Rod 34-31 Withdraw Speed is Too Fast 10/1/2008
- 824856 Rod 38-03 Withdraw Speed is Too Fast 10/1/2008
- 826039 Rod 34-31 Double Notching 10/3/2008
- 826044 Hydrogen Pressure Indication Discrepancies 10/3/2008
- 826093 Following L1M18 GC Lid Leaks 10/3/2008
- 826109 Entered
- LOA-WL-001 Due to Low Lake Level 10/3/2008
- 836026 1P85-F016 Valve Packing Leaks 1 Drop/Sec 10/3/2008
- 836856 Flow Degraded 10/28/2008
- Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 485457 VY Cooler Flow Out of Band for
- LOS-DG-SR6 5/1/2006
- 828185-06 EACE:
- 1B DG Engine Lockout Received Shortly After Start Attempt 10/08/2008
- 847066 Heavy Rust & Calcium Identified on Unit 1 Tendons 11/18/2008
- CALCULATIONS Number Description or Title Date or Revision
- EC 360691 CSCS Cooling Water Flow Margins for Operability of the ECCS Cubicle Room Coolers and DG Coolers Rev. 0
- EC 372438 LaSalle Unit 1 Fast Withdrawal Time for Control Rod 34-31 Rev. 0
- OPERABILITY EVALUATIONS Number Description or Title Date or Revision OE08-006 Degraded Performance of Control Rod 34-31
- Rev. 0 OE06-001 Potential Degradation of Valve 0DG006 Rev. 0
- MISCELLANEOUS Number Description or Title Date or Revision
- LSCS-UFSAR Rev. 13
- LSCS-UFSAR Rev. 15
- LSCS-UFSAR Rev. 16
- IWL-3000 Acceptance Standards undated
- 1R19 PM Testing
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 827335 Failed Parts in 0VE04CB Compressor Removed for Replacement 10/6/2008
- 830825 Work Control Goals not met for the week of 10/6/2008 10/14/2008
- 830826 Suction Pressure Operating in Wider than Expected Band 10/14/2008
- 830858 Key Calc review - Calc 1I18 Enhancements 10/14/2008
- Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 832336 RCA Exit Point Personnel Contamination Monitoring 10/17/2008
- 852018 2B VP Chiller Start Anomaly 12/3/2008
- 855244 Vibration Increase on 1A Reactor Protection System (RPS) Following Modification 12/11/2008
- PROCEDURES Number Description or Title Date or Revision
- LOP-RP-01 Reactor Protection System
- MG-Set Start-up and Operation Rev. 9
- LOP-RP-03 RPS Bus A Transfer Rev. 24
- LOS-VC-M1 Control room Emergency Makeup Unit Train B Operability Test Rev. 24
- LOP-VP-02 Startup, Operation and Shutdown of Primary Containment Chilled Water and Ventilation System Rev. 31
- WORK DOCUMENTS Number Description or Title Date or Revision
- 1165056
- LOS-VC-M1 VC EMU "B" Train Att. B 10/07/2008
- 1R22 Surveillance Testing
- PROCEDURES Number Description or Title Date or Revision
- LOS-CS-SR1 Operating Department Surveillance:
- Secondary Containment Leak Rate Test 10/1/2008
- LOS-DG-M3 1B(2B) Diesel Generator Operability Test Rev. 69
- LOS-RH-Q1 RHR (PCI) and RHR Service Water Pump and Valve Inservice Test for Modes 1, 2, 3, 4 and 5 Rev. 67
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 828185 1B DG Engine Lockout Received Shortly After Start Attempt 10/8/2008
- 828551 NOS ID:
- Reportability of Unit 1 HPCS Safety 10/9/2008
- Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision Function
- 829363 NOS ID:
- Response to Potential Common Cause Failure of 1B
- DG 10/10/2008
- WORK DOCUMENTS Number Description or Title Date or Revision
- HLA Brief for
- LOS-CS-SR1 /
- LOS-CS-Q1 10/7/2008
- HLA Brief for
- LOS-CS-SR1 /
- LOS-CS-Q1 10/21/2008
- Operations Log 10/21/2008
- LOS-RH-Q1 1C RHR System Operability Att. 1C 11/17/2008
- 2PS2 Radioactive Material Processing and Transportation CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 663732-07
- Root Cause Radioactive Shipping Violation Due To Procedure Lacking Adequate Defense in Depth
- 8/23/2007
- 663776
- South Carolina Suspends LaSalle's Radioactive Waste Permit for Barnwell
- 8/22/2007
- 684031-02
- Common Cause Analysis on Adverse Trend in Radiation Protection Performance
- 11/16/2007
- 690080
- Carrier Changed Following Completion Of Radioactive Shipment Forms
- 10/25/2007
- 707322
- Focused Area Self-Assessment Radioactive Material Processing and Transportation
- 10/8/2008
- 763550
- Crane Problems Pose Radiological Risk
- 3/25/2008
- 772073
- Limited Quantity Radioactive Shipment In Excess of DOT Limits on Receipt
- 5/5/2008
- 772931
- Incoming Equipment Found to Have Radiological Contaminated Item
- 5/7/2008
- 804553
- Personnel Contamination Discovered at Radiological Control Area Exit
- 8/6/2008
- 828000
- Shipping Focused Area Self-Assessment Deficiency
- 10/8/2008
- Attachment PROCEDURES REVIEWED Number Description or Title Date or Revision
- Interim Abandoned Equipment Identification, Evaluation and Control
- Revision 3
- LOP-RT-05
- Reactor Water Clean-up System Filter/Demineralizer Backwash
- 8/22/2008
- LOP-WX-10
- Establishing a Spent Resin Tank Transfer Loop
- Revision 14
- LOP-WX-12
- Establishing Reactor Water Clean-up Phase Separator Transfer Loop and Tank Recirculation
- Revision 19
- LOP-WX-29
- Loading of Radioactive Waste Shipments Using High Integrity Containers
- Revision 7
- LOP-WX-32
- IRF General Use Procedure
- Revision 10
- LOS-WX-Q3
- Radwaste High Radiation surveillance
- Revision 2
- LW07-02
- LSA-I Equipment Waste Shipment
- 3/1/2007
- LW07-011
- Type B Resin Shipment
- LW07-014
- LSA-II Resin Shipment
- 6/21/2007
- LW08-01
- LSA-II Fuel Cooling Filters
- 1/3/2008
- LW08-023
- Type A Resin
- 3/20/2008
- Radioactive Waste Shipments to Energy Solution's Clive Utah Disposal Site Containerized Waste Facility
- Revision 7
- Packaging of Radioactive Material Shipments
- Revision 12
- Inspection and Loading of Radioactive Material Shipments
- Revision 3
- 10
- CF 61 Program
- Revision 1
- Process Control Program for Radioactive Wastes
- Revision 6
- MISCELLANEOUS Number Description or Title Date or Revision UFSAR 11.4
- Solid Waste Management System
- Revision 14
- WORK DOCUMENTS Number Description or Title Date or Revision
- LOS-WX-Q3 Radwaste High Radiation Surveillance
- 3/6/2008
- Attachment 4OA1 Performance Indicator Verification
- MISCELLANEOUS Number Description or Title Date or Revision
- LER 2008-001-00 High Pressure Core Spray System Declared Inoperable Due to Failed Room Ventilation Supply Fan Rev. 00 TRM Appendix G SFDP SFDP Tracking Worksheet, Support System Inoperable Rev. 4
- MSPI Unavailability and Reliability Data for Core Standby Cooling Systems
- October 2007 - September 2008
- MSPI Unavailability and Reliability Data for Residual Heat Removal Systems
- October 2007 - September 2008
- MSPI Unavailability and Reliability Data for Reactor Core Isolation Cooling Systems
- October 2007 - September 2008
- MSPI Unavailability and Reliability Data for High Pressure Injection Systems
- October 2007 - September 2008
- October 2007 - September 2008
- MSPI Basis Document LaSalle County Station Rev. 5
- NEI 99-02, Performance Indicators
- Rev. 5
- PROCEDURES Number Description or Title Date or Revision
- LES-RH-202A Unit 2 Division 1 RHR Pump Start Time Delay Relay Surveillance Rev. 10
- LOP-DG-04 Diesel Generator Special Operations Rev. 47
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 682781 1B Diesel Generator Load/Speed Drifts 10/10/2007
- 682796 1B Diesel Generator Voltage Regulator Adjustment Erratic 10/10/2007
- 723020 High Vibes/Low Discharge Pressure on RCIC Water Leg Pump 01/16/2008
- 723285 2E51-F054 Failed to Auto Open 01/16/2008
- 723360 Pump Shaft Oil Seal Retaining Ring Rotating on Shaft 01/17/2008
- 840907 NRC Identified Error in MSPI Unavailability Reporting 11/5/2008
- 857032 NRC ID'D:
- Discrepancy Between LER Submittal and Safety System Functional Failure Report
- 12/16/2008
- Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 857522 NRC ID'D:
- Reported Unavailability for RHR When Not Required 12/17/2008
- 829363 NOS ID:
- Response to Potential Common Cause Failure of 1B
- DG 10/10/2008
- 4OA2
- Problem Identification and Resolution PROCEDURES Number Description or Title Date or Revision
- LOS-DG-R2B Diesel Generator Shutdown and Hot Restart Rev. 8
- LOS-DG-R2B 2B Diesel Generator Twenty-Four Hour Run Surveillance Rev. 7
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 861714 NRC ID:
- Testing Discrepancy per Regulatory Guide 1.9, Rev. 3 12/29/2008
- WORK DOCUMENTS Number Description or Title Date or Revision
- Operations Log 1/29/2007 to 12/29/2008
- MISCELLANEOUS Number Description or Title Date or Revision ANSI/IEEE Std. 387-1984 IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations 11/21/1984 OpESS
- FY 2008-01 Negative Trend and Recurring Events Involving Emergency Diesel Generators 2008 Reg. Guide 1.9 Selection, Design, Qualification, and Testing of Emergency Diesel Generator Units Used as Class 1E Onsite Electric Power Systems at Nuclear Power Plants Rev. 3
- Attachment 4OA5 Other Activities PROCEDURES Number Description or Title Date or Revision
- LOS-DG-R0 0 Diesel Generator 0DG01K Twenty-Four Hour Run Surveillance Rev. 10
- LOS-DG-R1A 1A Diesel Generator 1DG01K Twenty-Four Hour Run Surveillance Rev. 10
- LOS-DG-R1B 1B Diesel Generator Twenty-Four Hour Run Surveillance Rev. 9
- LOS-DG-R2A 2A Diesel Generator 2DG01K Twenty-Four Hour Run Surveillance Rev. 10
- LOS-DG-R2B 2B Diesel Generator Twenty-Four Hour Run Surveillance Rev. 8
- CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
- 648587
- Unexpected Radioactive Debris Inside LaSalle
- TN-RAM Cask Shipment
- 7/10/2007
- CALCULATIONS Number Description or Title Date or Revision AK19 Input KW Loading on 4160 SWGR 141Y, 142Y and 242Y Rev. 0071 AK15 KWIN Loading on 4160 SWGR 143 and 243 Rev. 001B
- MISCELLANEOUS Number Description or Title Date or Revision LW07-016 Type B
- TN-RAM Cask to Barnwell
- 6/29/2007 Energy Solutions Technical 1035
- Handling
- TN-RAM Waste Liners
- 5/6/2008 Energy Solutions Technical 1016
- Handling the
- TN-RAM Shipping Cask Using the Pool Filling Method
- 5/7/2008
- Energy Solutions
- TN-RAM Liner Video Inspection and Documentation Instructions for Existing Loaded Liners in Spent Fuel Pools 10/5/2007
- RWE-NUKEM Corporation - Handling
- TN-RAM Waste Liners Revision 0
- 3/2/2006
- NUKEM Corporation - Handling
- TN-RAM Waste Liners Revision 6
- 9/26/2007
- NUKEM Corporation - Handling the
- TN-RAM 9/21/2007
- Attachment MISCELLANEOUS Number Description or Title Date or Revision Shipping Cask Using the Pool Filling, Revision 12
- NUKEM Corporation - Handling the
- TN-RAM Shipping Cask Using the Pool Filling, Revision 11
- 2/20/2007
- Attachment
LIST OF ACRONYMS
- USED [[]]
- EC [[]]
- NRC [[]]
PMT Post-Maintenance Testing
radwaste radioactive waste