February 6, 2009

Mr. Charles Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 NRC INTEGRATED INSPECTION REPORT 05000373/2008005; 05000374/2008005

Dear Mr. Pardee:

On December 31, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an integrated inspection at your LaSalle County Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on January 13, 2009, with Site Vice President, Mr. Daniel Enright, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, one NRC-identified finding of very low safety significance was identified. The finding involved a violation of NRC requirements. However, because of it's very low safety significance, and because the issue was entered into your corrective action program, the NRC is treating the issue as a Non-Cited Violation (NCV) in accordance with Section VI.A.1 of the NRC Enforcement Policy. If you contest the subject or severity of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector Office at the LaSalle County Station. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

Inspection Report 05000373/2008005; 05000374/2008005

w/Attachment:

Supplemental Information cc w/encl: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Manager Regulatory Assurance - LaSalle County Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission

SUMMARY OF FINDINGS

......................................................................................................... 1

REPORT DETAILS

..................................................................................................................... 2 Summary of Plant Status......................................................................................................... 2 1. SAFETY .................................................................................................................. 2

1R01 Adverse Weather Protection

.................................................... 2

1R04 Equipment Alignment

............................................................... 3

1R05 Fire Protection

......................................................................... 4

1R06 Flooding

................................................................................... 5

1R11 Licensed Operator Requalification Program

............................. 5

1R12 Maintenance Effectiveness

...................................................... 6

1R13 Maintenance Risk Assessments and Emergent Work Control

.. 7

1R15 Operability Evaluations

............................................................ 8

1R19 Post-Maintenance Testing

....................................................... 8

1R22 Surveillance Testing

RADIATION SAFETY

................................................................................................. 10 2PS2 Radioactive Material Processing and Transportation (71122.02)

OTHER ACTIVITIES

................................................................................................... 13

4OA1 Performance Indicator Verification

.............................................. 13

4OA2 Identification and Resolution of Problems

................................... 16

4OA5 Other Activities......................................................................................... 20 4OA6

Management Meetings ............................................................................ 21 4OA7 Licensee-Identified Violations .................................................................. 22

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

D. Enright, Site Vice President
D. Rhoades, Plant Manager
J. Bashor, Site Engineering Director
L. Blunk, Operations Training Manager
S. Wilkinson, Chemistry Manager
H. Do, Corporate Inservice Inspection Manager
B. Ginter, Engineering Programs Manager
F. Gogliotti, System Engineering Senior Manager
W. Hilton, Engineering Supervisor - Mechanical/Structural
K. Ihnen, Nuclear Oversight Manager
A. Kochis, Inservice Inspection Engineer
R. Leasure, Radiation Protection Manager
S. Marik, Operations Director
J. Miller, NDE Level III
B. Rash, Maintenance Director
J. Rommel, Design Engineering Senior Manager
K. Rusley, Emergency Preparedness Manager
J. Shields, Inservice Inspection Program Supervisor
T. Simpkin, Regulatory Assurance Manager
H. Vinyard, Shift Operations Superintendent
G. Wilhelmsen, Design Manager
J. White, Site Training Director
C. Wilson, Station Security Manager
D. Amezaga, GL 89-13 Program Owner
J.C. Feeney, NOS Lead Assessor
D. Henly, Design Engineer Nuclear Regulatory Commission
K. Riemer, Chief, Reactor Projects Branch 2

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

Opened

05000373/2008005-01;
05000374/2008005-01 NCV Failure to Incorporate Regulatory Guide 1.9 Testing Methodology into Procedures (Section 4OA2.4)

Closed

05000373/2008005-01;
05000374/FIN-2008005-01 NCV Failure to Incorporate Regulatory Guide 1.9 Testing Methodology into Procedures (Section 4OA2.4)
05000373/2007004-03;
05000374/FIN-2007004-03 URI State Of South Carolina Suspended Access To Barnwell Disposal Facility On August 22, 2007 (Section 4OA5)
Attachment

LIST OF DOCUMENTS REVIEWED

The following is a partial list of documents reviewed during the inspection.

Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1R01 Adverse Weather Protection PROCEDURES Number Description or Title Date or Revision
LOP-CW-09 Circulation Water System Ice Melting (CW) Rev. 13
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
848282 Gap Identified in
LOS-ZZ-A2 11/21/2008
849759
OFP-FB256 Can Freeze without Auxiliary Heating in the Winter 12/1/2008
WORK DOCUMENTS Number Description or Title Date or Revision
01086796
LOS-ZZ-A2 Winterize Station Att. A 10/16/2008
MISCELLANEOUS Number Description or Title Date or Revision
ZZ-A2 winter mode for '08.doc:
Notes on
LOS-ZZ-A2 Gap -
1R04 Equipment Alignment
PROCEDURES Number Description or Title Date or Revision
LOP-DG-03M Unit 0 Diesel Generator Mechanical Checklist Rev. 8
LOP-RH-01E Unit 1 RHR Service water System Electrical Checklist Rev. 8
LOP-RHWS-1AM Unit 1 A RHR Service Water System Mechanical Checklist Rev. 2
LOP-VC-01M Unit 0 Control room HVAC System Mechanical Rev. 11
Attachment PROCEDURES Number Description or Title Date or Revision Checklist
LOS-DG-03E Unit 0 Diesel generator Electrical Checklist Rev. 9
1R05 Fire Protection
MISCELLANEOUS Number Description or Title Date or Revision
LaSalle County Station Fire Protection Report 2008
UFSAR 2008
1R06 Flooding OPERABILITY EVALUATIONS Number Description or Title Date or Revision
OP-AA-108-115 Attachment 1:
Operability Evaluation OE07-004, Rev. 3 Rev. 6
1R11 Licensed Operator Requalification
MISCELLANEOUS Number Description or Title Date or Revision
ESG 89 Out of the Box Simulator Training Scenario Rev. 0
Licensed Operator Exam Results
CY 2008
1R12 Maintenance Effectiveness
PROCEDURES Number Description or Title Date or Revision
LOS-PC-Q1 Primary Containment Isolation Valves Operability Test and Inservice Inspection Rev. 40
LOS-PC-Q2 Primary Containment Isolation Valves Operability Test and Inservice Inspection for Modes 4, 5 or Defueled Rev. 48
Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
369810 A VE Compressor Trip on High Oil Temperature 9/2/2005
382688 4 Maintenance Rule Functional Failure on A VE System 10/6/2005
533989 2RE024 Failed the
LOS-PC-Q1 and is Inoperable 9/21/2006
533989 2RE024 Failed the
LOS-PC-Q1 and is Inoperable 9/21/2006
552969 1B22-F019 Stroke Time Exceeded Required Action Time 11/3/2006
595195 2CM023B Indicates Dual when Stroking from Open to Close 2/23/2007
596171 1B33-F019 Continues to Degrade for 1st Stroke Timing 2/26/2007
598483 2IN100 Fails 1st Surveillance Acceptance (Cycle time) 3/2/2007
643264 1E12-F097 Found Failed During Acoustic Testing 6/22/2007
661902 2G33-Z001-06A Didn't Close in 'Hold' 8/17/2007
709276 0VE09YB Damper Failure 12/9/2007
771286 0VE04CB Oil Level Low 5/3/2008
773160 Work Order to Replace 1B33-F019 Limit Switch in L1R13 5/8/2008
792275 Stem Lube Coordination Issue 7/1/2008
798472 1RE024 Open Cycle Time Excessive 7/20/2008
799179 Galling Discovered on 1RE024 Valve Stem 7/22/2008
802717 1RF013 Close Time Greater Than Required Action Range 8/1/2008
802802 ASCO 3-Way Solenoid Required Replacement 8/1/2008
807707 B VE Compressor Shaft Oil Leak 8/15/2008
808172 Vibration Analysis Identifies Minor Impacting in Compressor 8/18/2008
808829 1RE024 Shows Dual when Required to be Full Closed 8/19/2008
814387 Vibration Levels on 0VE04CB Trending Upward 9/5/2008
817100 0B VE Compressor Parameter Change 9/12/2008
819855 PCIS (PC-04) Exceeded Maintenance Rule Criteria 9/19/2008
849321 Maintenance Rule Function
VE-01 Performance Criteria Exceeded 11/25/2008
850385 B VE Comp. Freon Level at Cold Weather Minimum 11/29/2008
854189 Work Order Needed for Internal Inspection of 0VC05CB 12/9/2008
854195 Work Order Needed for Internal Inspection of 0VE04CA 12/9/2008
Attachment MISCELLANEOUS Number Description or Title Date or Revision
Maintenance Rule Scoping for
PC-03,
PC-04,
PC-05 various
Performance Criteria Report, PCIS for
PC-03,
PC-04,
PC-05
Performance Monitoring - Condition Monitoring
PC-03
10/2006 - 10/2008
Performance Monitoring - Reliability
PC-03
10/2006 - 10/2008
Performance Monitoring - Reliability
PC-04
10/2006 - 10/2008
Performance Monitoring - Reliability
PC-05
10/2006 - 10/2008
Risk Significance Summary for
PC-03,
PC-04,
PC-05 various Determination
IR 819855 Determination Template for
PC-04 ASME XI Stroke Time Testing for all Primary Containment 10/21/2008
LSCS-UFSAR, Section 9.4 Heating, Ventilation and Air Conditioning Systems Maintenance Rule Expert Panel Meeting Agenda 5/15/2008
MAINTENANCE RULE Number Description or Title Date or Revision
Maintenance Rule Evaluation - PCIV April 2008
1R13 Maintenance Risk Assessments and Emergent Work Control PROCEDURES Number Description or Title Date or Revision
LEP-DG-105 Maintenance and Adjustment of Woodward U 8 Governor Shutdown Solenoids Rev. 12
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
829363 NOS ID:
Response to Potential Common Cause Failure of 1B
DG 10/10/2008
836161 On Line Risk Turns Red on a Loss of Standby DC Charger 11/27/2008
844283 Unexpected group 1 MSIV Half-Isolation Signal 11/12/2008
OP-AA-106-101-1006 for
828185 Issue Resolution Documentation Form - 1B DG failed to start during monthly surveillance Rev. 6
Attachment WORK DOCUMENTS Number Description or Title Date or Revision
Plant Status:
LaSalle Plant Conditions 10/27/2008
Operations Log 11/13/2008
Operations Log 11/14/2008
DRAWINGS Number Description or Title Date or Revision 1E-1-4232AD Schematic Diagram Primary Containment & Reactor Vessel Isolation System "PC" (B21H) Part 4 Rev. AG
MISCELLANEOUS Number Description or Title Date or Revision VETIP VM# J-0157 Woodward Governor - Installation & Operation Manual for Shutdown Solenoid for UG Governor Rev. T
1R15 Operability Evaluations
PROCEDURES Number Description or Title Date or Revision
LOS-DG-SR6 Division 2 Cooling Water System Test Rev. 9
LOS-RD-SR5 Control Rod Drive Timing 1/10/2007
LS-AA-1110 Reportable Event SAF 1.8:
Event or Condition That Could Have Prevented Fulfillment of a Safety Function Rev. 12
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
824848 Rod 34-31 Withdraw Speed is Too Fast 10/1/2008
824856 Rod 38-03 Withdraw Speed is Too Fast 10/1/2008
825803 Unit 1 Rod 34-31 Withdraw Speed is Fast Replace CRDM L1R13 10/2/2008
826039 Rod 34-31 Double Notching 10/3/2008
826044 Hydrogen Pressure Indication Discrepancies 10/3/2008
826093 Following L1M18 GC Lid Leaks 10/3/2008
826109 Entered
LOA-WL-001 Due to Low Lake Level 10/3/2008
836026 1P85-F016 Valve Packing Leaks 1 Drop/Sec 10/3/2008
836856 Flow Degraded 10/28/2008
Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
485457 VY Cooler Flow Out of Band for
LOS-DG-SR6 5/1/2006
828185-06 EACE:
1B DG Engine Lockout Received Shortly After Start Attempt 10/08/2008
847066 Heavy Rust & Calcium Identified on Unit 1 Tendons 11/18/2008
CALCULATIONS Number Description or Title Date or Revision
EC 360691 CSCS Cooling Water Flow Margins for Operability of the ECCS Cubicle Room Coolers and DG Coolers Rev. 0
EC 372438 LaSalle Unit 1 Fast Withdrawal Time for Control Rod 34-31 Rev. 0
OPERABILITY EVALUATIONS Number Description or Title Date or Revision OE08-006 Degraded Performance of Control Rod 34-31
Rev. 0 OE06-001 Potential Degradation of Valve 0DG006 Rev. 0
MISCELLANEOUS Number Description or Title Date or Revision
LSCS-UFSAR Rev. 13
LSCS-UFSAR Rev. 15
LSCS-UFSAR Rev. 16
IWL-3000 Acceptance Standards undated
1R19 PM Testing
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
827335 Failed Parts in 0VE04CB Compressor Removed for Replacement 10/6/2008
830825 Work Control Goals not met for the week of 10/6/2008 10/14/2008
830826 Suction Pressure Operating in Wider than Expected Band 10/14/2008
830858 Key Calc review - Calc 1I18 Enhancements 10/14/2008
Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
832336 RCA Exit Point Personnel Contamination Monitoring 10/17/2008
852018 2B VP Chiller Start Anomaly 12/3/2008
855244 Vibration Increase on 1A Reactor Protection System (RPS) Following Modification 12/11/2008
PROCEDURES Number Description or Title Date or Revision
LOP-RP-01 Reactor Protection System
MG-Set Start-up and Operation Rev. 9
LOP-RP-03 RPS Bus A Transfer Rev. 24
LOS-VC-M1 Control room Emergency Makeup Unit Train B Operability Test Rev. 24
LOP-VP-02 Startup, Operation and Shutdown of Primary Containment Chilled Water and Ventilation System Rev. 31
WORK DOCUMENTS Number Description or Title Date or Revision
1165056
LOS-VC-M1 VC EMU "B" Train Att. B 10/07/2008
1R22 Surveillance Testing
PROCEDURES Number Description or Title Date or Revision
LOS-CS-SR1 Operating Department Surveillance:
Secondary Containment Leak Rate Test 10/1/2008
LOS-DG-M3 1B(2B) Diesel Generator Operability Test Rev. 69
LOS-LP-Q1 LPCI pump and valve surveillance (IST) Rev. 49
LOS-RH-Q1 RHR (PCI) and RHR Service Water Pump and Valve Inservice Test for Modes 1, 2, 3, 4 and 5 Rev. 67
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
828185 1B DG Engine Lockout Received Shortly After Start Attempt 10/8/2008
828551 NOS ID:
Reportability of Unit 1 HPCS Safety 10/9/2008
Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision Function
829363 NOS ID:
Response to Potential Common Cause Failure of 1B
DG 10/10/2008
WORK DOCUMENTS Number Description or Title Date or Revision
HLA Brief for
LOS-CS-SR1 /
LOS-CS-Q1 10/7/2008
HLA Brief for
LOS-CS-SR1 /
LOS-CS-Q1 10/21/2008
Operations Log 10/21/2008
WO 567504
LOS-DG-M3 1B DG Fast Start Att. 1B-Fast 10/9/2008
WO 975355 Sec Cont Leak Rate Test Procedure at 4000 SCFM to 0.25 inches 10/20/2008
WO 1162312
LOS-RH-Q1 1C RHR System Operability Att. 1C 11/17/2008
2PS2 Radioactive Material Processing and Transportation CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
663732-07
Root Cause Radioactive Shipping Violation Due To Procedure Lacking Adequate Defense in Depth
8/23/2007
663776
South Carolina Suspends LaSalle's Radioactive Waste Permit for Barnwell
8/22/2007
684031-02
Common Cause Analysis on Adverse Trend in Radiation Protection Performance
11/16/2007
690080
Carrier Changed Following Completion Of Radioactive Shipment Forms
10/25/2007
707322
Focused Area Self-Assessment Radioactive Material Processing and Transportation
10/8/2008
763550
Crane Problems Pose Radiological Risk
3/25/2008
772073
Limited Quantity Radioactive Shipment In Excess of DOT Limits on Receipt
5/5/2008
772931
Incoming Equipment Found to Have Radiological Contaminated Item
5/7/2008
804553
Personnel Contamination Discovered at Radiological Control Area Exit
8/6/2008
828000
Shipping Focused Area Self-Assessment Deficiency
10/8/2008
Attachment PROCEDURES REVIEWED Number Description or Title Date or Revision
CC-AA-109
Interim Abandoned Equipment Identification, Evaluation and Control
Revision 3
LOP-RT-05
Reactor Water Clean-up System Filter/Demineralizer Backwash
8/22/2008
LOP-WX-10
Establishing a Spent Resin Tank Transfer Loop
Revision 14
LOP-WX-12
Establishing Reactor Water Clean-up Phase Separator Transfer Loop and Tank Recirculation
Revision 19
LOP-WX-29
Loading of Radioactive Waste Shipments Using High Integrity Containers
Revision 7
LOP-WX-32
IRF General Use Procedure
Revision 10
LOS-WX-Q3
Radwaste High Radiation surveillance
Revision 2
LW07-02
LSA-I Equipment Waste Shipment
3/1/2007
LW07-011
Type B Resin Shipment
LW07-014
LSA-II Resin Shipment
6/21/2007
LW08-01
LSA-II Fuel Cooling Filters
1/3/2008
LW08-023
Type A Resin
3/20/2008
RP-AA-600-1004
Radioactive Waste Shipments to Energy Solution's Clive Utah Disposal Site Containerized Waste Facility
Revision 7
RP-AA-602
Packaging of Radioactive Material Shipments
Revision 12
RP-AA-603
Inspection and Loading of Radioactive Material Shipments
Revision 3
RP-AA-605
10
CF 61 Program
Revision 1
RW-AA-100
Process Control Program for Radioactive Wastes
Revision 6
MISCELLANEOUS Number Description or Title Date or Revision UFSAR 11.4
Solid Waste Management System
Revision 14
WORK DOCUMENTS Number Description or Title Date or Revision
WO 1089565
LOS-WX-Q3 Radwaste High Radiation Surveillance
3/6/2008
Attachment 4OA1 Performance Indicator Verification
MISCELLANEOUS Number Description or Title Date or Revision
LER 2008-001-00 High Pressure Core Spray System Declared Inoperable Due to Failed Room Ventilation Supply Fan Rev. 00 TRM Appendix G SFDP SFDP Tracking Worksheet, Support System Inoperable Rev. 4
MSPI Unavailability and Reliability Data for Core Standby Cooling Systems
October 2007 - September 2008
MSPI Unavailability and Reliability Data for Residual Heat Removal Systems
October 2007 - September 2008
MSPI Unavailability and Reliability Data for Reactor Core Isolation Cooling Systems
October 2007 - September 2008
MSPI Unavailability and Reliability Data for High Pressure Injection Systems
October 2007 - September 2008
MSPI Unavailability and Reliability Data for Emergency AC Power Systems
October 2007 - September 2008
MSPI Basis Document LaSalle County Station Rev. 5
NEI 99-02, Performance Indicators
Rev. 5
PROCEDURES Number Description or Title Date or Revision
LES-RH-202A Unit 2 Division 1 RHR Pump Start Time Delay Relay Surveillance Rev. 10
LOP-DG-04 Diesel Generator Special Operations Rev. 47
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
682781 1B Diesel Generator Load/Speed Drifts 10/10/2007
682796 1B Diesel Generator Voltage Regulator Adjustment Erratic 10/10/2007
723020 High Vibes/Low Discharge Pressure on RCIC Water Leg Pump 01/16/2008
723285 2E51-F054 Failed to Auto Open 01/16/2008
723360 Pump Shaft Oil Seal Retaining Ring Rotating on Shaft 01/17/2008
840907 NRC Identified Error in MSPI Unavailability Reporting 11/5/2008
857032 NRC ID'D:
Discrepancy Between LER Submittal and Safety System Functional Failure Report
12/16/2008
Attachment CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
857522 NRC ID'D:
Reported Unavailability for RHR When Not Required 12/17/2008
829363 NOS ID:
Response to Potential Common Cause Failure of 1B
DG 10/10/2008
4OA2
Problem Identification and Resolution PROCEDURES Number Description or Title Date or Revision
LOS-DG-R2B Diesel Generator Shutdown and Hot Restart Rev. 8
LOS-DG-R2B 2B Diesel Generator Twenty-Four Hour Run Surveillance Rev. 7
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
861714 NRC ID:
Testing Discrepancy per Regulatory Guide 1.9, Rev. 3 12/29/2008
WORK DOCUMENTS Number Description or Title Date or Revision
Operations Log 1/29/2007 to 12/29/2008
MISCELLANEOUS Number Description or Title Date or Revision ANSI/IEEE Std. 387-1984 IEEE Standard Criteria for Diesel-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations 11/21/1984 OpESS
FY 2008-01 Negative Trend and Recurring Events Involving Emergency Diesel Generators 2008 Reg. Guide 1.9 Selection, Design, Qualification, and Testing of Emergency Diesel Generator Units Used as Class 1E Onsite Electric Power Systems at Nuclear Power Plants Rev. 3
Attachment 4OA5 Other Activities PROCEDURES Number Description or Title Date or Revision
LOS-DG-R0 0 Diesel Generator 0DG01K Twenty-Four Hour Run Surveillance Rev. 10
LOS-DG-R1A 1A Diesel Generator 1DG01K Twenty-Four Hour Run Surveillance Rev. 10
LOS-DG-R1B 1B Diesel Generator Twenty-Four Hour Run Surveillance Rev. 9
LOS-DG-R2A 2A Diesel Generator 2DG01K Twenty-Four Hour Run Surveillance Rev. 10
LOS-DG-R2B 2B Diesel Generator Twenty-Four Hour Run Surveillance Rev. 8
CAP DOCUMENTS REVIEWED Number Description or Title Date or Revision
648587
Unexpected Radioactive Debris Inside LaSalle
TN-RAM Cask Shipment
7/10/2007
CALCULATIONS Number Description or Title Date or Revision AK19 Input KW Loading on 4160 SWGR 141Y, 142Y and 242Y Rev. 0071 AK15 KWIN Loading on 4160 SWGR 143 and 243 Rev. 001B
MISCELLANEOUS Number Description or Title Date or Revision LW07-016 Type B
TN-RAM Cask to Barnwell
6/29/2007 Energy Solutions Technical 1035
Handling
TN-RAM Waste Liners
5/6/2008 Energy Solutions Technical 1016
Handling the
TN-RAM Shipping Cask Using the Pool Filling Method
5/7/2008
Energy Solutions
TN-RAM Liner Video Inspection and Documentation Instructions for Existing Loaded Liners in Spent Fuel Pools 10/5/2007
RWE-NUKEM Corporation - Handling
TN-RAM Waste Liners Revision 0
3/2/2006
NUKEM Corporation - Handling
TN-RAM Waste Liners Revision 6
9/26/2007
NUKEM Corporation - Handling the
TN-RAM 9/21/2007
Attachment MISCELLANEOUS Number Description or Title Date or Revision Shipping Cask Using the Pool Filling, Revision 12
NUKEM Corporation - Handling the
TN-RAM Shipping Cask Using the Pool Filling, Revision 11
2/20/2007
Attachment

LIST OF ACRONYMS

USED [[]]
AC Alternating Current
ASME American Society of Mechanical Engineers
CAP Corrective Action Program
CFR Code of Federal Regulations
CW Circulating Water
DC Direct Current
DG Diesel Generator
DOT Department of Transportation
DRP Division of Reactor Projects
EC [[]]
CS Emergency Core Cooling System
HPCS High Pressure Core Spray
IMC Inspection Manual Chapter
IP Inspection Procedure
IR Issue Report
MSIV Main Steam Isolation Valve
MSPI Mitigating System Performance Indicator NCV Non-Cited Violation
NEI Nuclear Energy Institute
NRC [[]]
U.S. Nuclear Regulatory Commission
PCIS Primary Containment Isolation System
PI Performance Indicator

PMT Post-Maintenance Testing

radwaste radioactive waste

RCIC Reactor Core Isolation Cooling
RHR Residual Heat Removal
RP Radiation Protection
RPS Reactor Protection System
SDP Significance Determination Process
TS Technical Specification
UFSAR Updated Final Safety Analysis Report
USAR Updated Safety Analysis Report VC Control Room
VE Electrical Equipment Room
VP Containment Ventilation
WO Work Order
WS Service Water