MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
1-Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Salem Generating Station December 10, 1993 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of November 1993 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance 10CFR50.59 Evaluations Operating Summary Refueling Information RH:pc cc: Mr. Thomas T. Martin Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19046 Enclosures 8-1-7.R4 The Energy People 9312200006 931130 I 1' 95-2189 (10M) 12-89 PDR ADOCK 05000311 l_J)
R PDR
e AVERAGE DAILY UNIT POWE.VEL Docket No.: 50-311 Unit Name: Salem #2 Date: 12-10-93 Completed by: Mark Shedlock Telephone: 339-2122 Month NOVEMBER 1993 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 1014 17 1127 2 1120 18 1134 3 1140 19 1130 4 1139 20 1131 5 1122 21 1131 6 1123 22 1115 7 1116 23 996 8 1114 24 860 9 1119 25 944 10 1120 26 1008 11 1120 27 1127 12 1132 28 1124 13 1135 29 1053 14 805 30 1023 15 1076 31 16 1133 P. 8.1-7 Rl
OPERATING DATA REP~
Docket No: 50-311 Date: 12/10/93 Completed by: Mark Shedlock Telephone: 339-2122 Operating Status
- 1. Unit Name Salem No. 2 Notes
- 2. Reporting Period November 1993
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) 1170
- 5. Design Electrical Rating (Net MWe) 1115
- 6. Maximum Dependable Capacity(Gross MWe) 1149
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason NA
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any NONE This Month Year to Date Cumulative
- 11. Hours in Reporting Period 720 8016 106369
- 12. No. of Hrs. Rx. was Critical 720 5442.11 69207.71
- 13. Reactor Reserve Shutdown Hrs. 0 0 0
- 14. Hours Generator On-Line 720 5259.21 66817.67
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 2375899.2 17136708 162232397.8 Gross Elec. Energy Generated (MWH) 811230 5760570 *70468058
- 18. Net Elec. Energy Gen. (MWH) 778308 5478233 67064209
- 19. Unit Service Factor 100 65.6 62.8
- 20. Unit Availability Factor 100 65.6 62.8
- 21. Unit Capacity Factor (using MDC Net) 97.7 61.8 57
- 22. Unit Capacity Factor (using DER Net) 96.9 61.3 56.5
- 23. Unit Forced Outage Rate 0 11.6 22.1
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
NONE
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
NA 8-l-7.R2
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH NOVEMBER 1993 DOCKET NO.: ....:5::..:0:..,.*""27c.::2~--
UN IT NAME: _s'"-'a""'l""e"'m-'#"-"'2,___ _
DATE: _1"""2,._/""10=/+93"""'"'__,-
COMPLETED BY: Mark Shedloc~
TELEPHONE: ....:3=3-.9.....
-2""'1=22---._ _
METHOD OF SHUTTING LICENSE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION 2
NO. DATE TYPE 1 (HOURS) REASON REACTOR REPORT # CODE 4 CODE 5 TO PREVENT RECURRENCE 044 11-14-93 F 5.9 A 5 ------- CH HTEXCH NUCLEAR STEAM GENERATOR INTERNAL PROBLEMS 045 11-23-93 F 25.38 A 5 ------- HF PUMPXX CIRCULATING WATER PUMPS 046 11-28-93 F 6.73 A 5 ------- EG RELAYX SWITCHYARD OR HIGH VOLTAGE SYSTEM PROBLEMS 1 2 3 4 5 F: Forced Reason Method: Exhibit G - Instructions Exhibit 1 - Same S: Scheduled A-Equipment Failure (explain) 1-Manual for Preparation of Data Source B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report CLER) File D-Requlatory Restriction 4-Continuation of (NUREG-0161)
E-Operator Training & License Examination Previous Outage F-Administrative 5-Load Reduction G-Operational Error (Explain) 9-0ther H-Other (Explain)
SAFE~Y RELATED MAIN.ANCE DOC.T NO:
UNIT NAME:
50-311
- MONTH.: - NOVEMBER 1993 SALEM 2 DATE: DECEMBER 10, 1993 COMPLETED BY: R. HELLER TELEPHONE: (609)339-5162 WO NO UNIT EQUIPMENT IDENTIFICATION 931025097 2 VALVE 22SW4 FAILURE DESCRIPTION: SERVICE WATER LEAK ON THE PIPING AT THE WELD TO 22SW4 - REPAIR 931029130 2 VALVE 26SW3 FAILURE DESCRIPTION: HANDWHEEL BROKEN OFF DURING TAGGING - REPLACE
~------------------------------------------------------------------
931103095 2 VALVE 23SW58 FAILURE DESCRIPTION: 23SW58 HAS NO FLOW - OPEN AND INSPECT 931112110 2 2A DIESEL GENERATOR FAILURE DESCRIPTION: THE BRANCH PIPE TO HEADER JACKET WATER IS LEAKING - REWORK BY CHANGING OUT GASKETS
10CFRS0.59'EVALUATI. DO.T NO: 50-311
~MONTH.: - NOVEMBER 19 9 3 UNIT NAME: SALEM 2 DATE: DECEMBER 10, 1993 COMPLETED BY: R. HELLER TELEPHONE: (609)339-5162 The following items were evaluated in accordance with the provisions of the Code of Federal Regulations 10CFR50.59. The Station Operations Review Committee has reviewed and concurs with these evaluations.
ITEM
SUMMARY
A. Design Change Packages 2EC-3202 Pkg 1 "CW-0008 circulating Water Electrical Upgrade Unit 2 (Outage)" - This DCP performs the following work:
1.) This DCP completes the electrical tie-in of the new Unit 2 Circ. Water 460V substation and demolished the existing substation. The substation was installed previously on its foundation by DCP lSC-2298. A new splice/pull box is installed on the existing foundation to perform the cable splices.
The substation is tested and re-energized; 2.) The 230 VAC motor control center, transformer, control equipment and lighting panels are located in a metal building ("Control House"). This control house is dismantled and replaced. All existing electrical equipment is reused. New ventilation, sump pump and piping is provided for the cable manhole; 3.) This DCP refurbished panels 360-2 and TS-2. Panels 670-2A, 670-2B and 670-2C are replaced, and 4.)
Three of the four screen wash pump motors (No. 21, 23, 24) have been replaced over time as the old motors failed. When the motors were replaced, they were upgraded from 125 horsepower to 150 horsepower. The remaining 125 HP motor (No. 22) is replaced by this DCP. Cabling to all four screen wash pumps is replaced to accommodate the increased motor size. This DCP does not reduce the margin of safety as defined in the basis for any Technical Specification. There are no requirements directly specified for the operation or performance of any circulating water system equipment in the Technical Specifications. This modification increases the circulating water system reliability and availability. (SORC 93-101) 2EC-3081 Pkg 1 "Penetration Area Welding Receptacles" Rev. 1 - This DCP provides three new 460V welding receptacles, one in the Chilled Water Pump Area, El. 100, at column lines BC-16.2, one in the Main Steam Penetration
10CFR50.59"EVALUATI. DO.T NO: 50-311
- MONTH; - NOVEMBER 1993 UNIT NAME: SALEM 2 DATE: DECEMBER 10, 1993 COMPLETED BY: R. HELLER TELEPHONE: (609)339-5162 (cont'd)
ITEM
SUMMARY
Area, El. 100, near column lines FF-16.8, and one in Personnel Hatch Area, 'El. 100, near column lines GG-16.8. These receptacles are in a common circuit fed from a new circuit breaker, I2118-21X, in the 2El 460-230 Volt Control Center. With this installation, welding receptacles will be available to power welding machines in these areas with no need to breach wall penetrations for power cables.
This will provide the capability for TIG welding, as well as SMAW welding, in each of these areas without the need to breach wall penetrations. This DCP will not reduce the margin of safety as defined in the basis for any Technical Specification because the new welding machine receptacles will be on a circuit powered from a non-vital bus, the 2EL 460-230V Control Center. The control center has the spare capacity to take the additional circuit and there -1 I
will be no effect on any other part of the power distribution system, vital or non-vital. There is no increase in load on the control center or the group bus as far as the Load Management Study is _
concerned because the welding receptacles are intermittent loads. Activities pertaining to the affected penetrations will be conducted in accordance with approved procedures. (SORC 93-103)
B. Safety Evaluations (S/E)
CN 93-24 "SGS-UFSAR Section 3.6.5.12.5 Revisions" - DEF
- DES-93-00660 identified that SGS-UFSAR Section 3.6.5.12.5 which applies only to Unit 2 does not address moderate energy pipe failure in the 10 Ton C02 Room and the Diesel Fuel Storage Tank areas.
SGS-UFSAR Section 3.1.3 identifies that the NRC required that a Moderate - Energy Break Analysis (MEBA) be performed for Unit 2. The proposal revises SGS-UFSAR Section 3.6.5.12.5 to address the 10 Ton C02 room, the Diesel Fuel storage Tank areas, and the entrance to these areas on the basis of a revised MEBA (Design Calculation S-C-ZZ-SDC-1203} as follows: "The 10 Ton C02 Room, the Diesel Fuel Storage Tank areas, and the entrance to these areas contain service water, fuel oil, and carbon dioxide
10CFRS0.59"EVALUATI. DO.T NO: 50-311
'MONTH~ - NOVEMBER 1993 UNIT NAME: SALEM 2 DATE: DECEMBER 10, 1993 COMPLETED BY: R. HELLER TELEPHONE: {609)339-5162 (cont'd)
ITEM
SUMMARY
fire protection MEL piping in addition to diesel fuel oil storage and transfer system equipment. The areas do not contain floor drainage, hence service water or fuel oil piping failure could cause flooding of the areas and the adjoining fuel transfer pump rooms. therefore, flooding of diesel fuel oil storage and transfer system equipment can occur. Spray damage can also occur. However, because blackout coincident with service water or fuel oil piping failure is not a design basis condition at Salem Generating Station, diesel fuel oil storage and transfer equipment are not required to function to mitigate the consequences of such piping failure. Protection against the effects of service water or fuel oil piping failure is not required for diesel fuel oil storage and transfer system equipment. No changes are being made to any component, system or structure. There is no effect on plant operation. The only change is the addition of a description of the facility in SGS-UFSAR Section 3.6.5.12.5, which is changed on the basis o'f a revised MEBA {Design Calculation S-C-ZZ-SDC-1203). There is no reduction in the margin of safety as defined in the basis for any Technical Specification. {SORC 93-101)
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT 2 NOVEMBER 1993 SALEM UNIT NO. 2 The Unit began the period operating at full power and continued to operate at essentially full power until November 14, 1993, when load was reduced to 50% for repairs to repair #21 steam generator feed pump. The Unit was restored to full power on November 15, 1993, and continued to operate at that level until November 23, 1993, when power was reduced to 79% due to jamming of the travelling screen for 23A circulator. The repairs were completed and a power escalation commenced later the same day. Power was held at 86% due to governor swings on #21 steam generator feed pump. Power was increased to 100%
on November 26, 1993. A load reduction to 80% was required on November 29, 1993 due to forced cooling problems on the main transformer. The cooling was restored and power increased to 100%
later in the day. The Unit continued to operate at 100% power through the remainder of the period.
REFUELING. INFORMATII DO.T NO: 50-311 "MONTH-:: -'NOVEMBER 1993 UNIT NAME: SALEM 2 DATE: DECEMBER 10, 1993 COMPLETED BY: R. HELLER TELEPHONE: (609)339-5162 MONTH NOVEMBER 1993
- 1. Refueling information has changed from last month:
YES NO X
- 2. Scheduled date for next refueling: SEPTEMBER 24, 1994
- 3. Scheduled date for restart following refueling: NOVEMBER 22, 1994
- 4. a) Will Technical Specification changes or other license amendments be required?:
YES NO ~~~-
NOT DETERMINED TO DATE X b) Has the reload fuel design been reviewed by the Station Operating Review Committee?:
YES NO ~--=X~~
If no, when is it scheduled?: OCTOBER 94
- 5. Scheduled date(s) for submitting proposed licensing action:
N/A
- 6. Important licensing considerations associated with refueling:
- 7. Number of Fuel Assemblies:
- a. Incore 193
- b. In Spent Fuel storage 464
- 8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
- 9. Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: March 2003 8-1-7.R4