September 29, 2006

Enclosure contains SafeguardsInformation. When Separated fromenclosure, this document is notSAFEGUARDS InformationMrs. Mary Vice President R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519

SUBJECT: R. E. GINNA NUCLEAR POWER PLANT, LLC - NRC INSPECTION REPORT05000244/2006010

Dear Mrs. Korsnick:

On September 14, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed aninspection at your R. E. Ginna Nuclear Power Plant, LLC. The enclosed inspection report documents the inspection results, which were discussed on September 20, 2006 with you and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection. WARNING: Violation of Section 147, "SafeguardsInformation," of the Atomic Agency Act is subject tocivil and criminal penalties.Safeguards information determination made by:Name/Title Barry C.Westreich, Chief Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/ Date 05/12/06 M.G. Korsnick-2-In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.21.

Sincerely,/RA/ Arthur Burritt, Acting, signed for Brian J. McDermottProjects Branch 1 Division of Reactor ProjectsDocket No.50-244License No.DPR-18

Enclosure:

NRC Inspection Report 05000244/2006010 ( )cc w/o encl:D Holm, Plant General Manager R. Randall, Director of Licensingcc w/encl; w/SGI:R. Teed, Supervisor, Nuclear Security J. Spath, State Liaison Officer/Program Director, New York State Energy Research and Development Authority F. Tabert, State Homeland Security Advisor, State of New York