IR 05000445/2007006
Download: ML071880010
Text
July 6, 2007
Mike Blevins, Senior Vice President and Chief Nuclear Officer TXU Power ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION - NRC INTEGRATEDINSPECTION REPORT 05000445/2007006
Dear Mr. Blevins:
On May 21, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection atyour Comanche Peak Steam Electric Station, Unit 1, facility. No inspection of Unit 2 was performed under this report number. This inspection was conducted due to the Unit 1 steam generator and reactor vessel head replacement activities. The enclosed inspection report documents the inspection findings, which were discussed on May 21, 2007, with Mr. R. Floresand other members of your staff.This inspection examined activities conducted under your licenses as they related to safety andcompliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. This inspection covers steam generator and reactor vessel head replacement activities.Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be made available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Should you have any questions concerning this inspection, we will be pleased to discuss themwith you.
Sincerely,/RA/Claude Johnson, Chief Project Branch A Division of Reactor Projects TXU Power-2-Docket Nos.:50-445License Nos.:NPF-87
Enclosure:
NRC Inspection Report 05000445/2007006
w/Attachment:
Supplemental Informationcc w/
Enclosure:
Fred W. Madden, Director Regulatory Affairs TXU Power P.O. Box 1002 Glen Rose, TX 76043George L. Edgar, Esq.Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004Terry Parks, Chief InspectorTexas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711The Honorable Walter MaynardSomervell County Judge P.O. Box 851 Glen Rose, TX 76043Richard A. Ratliff, ChiefBureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189 TXU Power-3-Brian AlmonPublic Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78711-3326Susan M. JablonskiOffice of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087Lisa R. Hammond, ChiefTechnological Hazards Branch National Preparedness Division FEMA Region VI 800 N. Loop 288 Denton, TX 76209 TXU Power-4-Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (RJC1)DRS Deputy Director (WBJ)Senior Resident Inspector (DBA)Branch Chief, DRP/A (CEJ1)Senior Project Engineer, DRP/A (TRF)Team Leader, DRP/TSS (CJP)RITS Coordinator (MSH3)DRS STA (DAP)M. Kunowski, OEDO RIV Coordinator (MAK3)ROPreports CP Site Secretary (ESS)SUNSI Review Completed: __CEJ_ADAMS: YesG No Initials: _CEJ_____ Publicly Available G Non-Publicly Available G Sensitive Non-SensitiveC:\FileNet\ML071880010.wpdRIV:RI:DRP/ASRI:DRP/AC:DRS/EBC:DRS/OBC:DRS/PEBC:DRS/PSBAASanchezDBAllenDAPowersATGodyLJSmithMPShannonE-CEJohnsonE-CEJohnson/RA//RA//RA//RA/7/2/077/2/076/22/076/20/076/21/076/18/07C:DRP/ACEJohnson/RA/7/6/07OFFICIAL RECORD COPYT=Telephone E=E-mail F=Fax U.S. NUCLEAR REGULATORY COMMISSIONREGION IVDockets:50-445Licenses:NPF-87 Report: 05000445/2007006 Licensee:TXU Generation Company LP Facility:Comanche Peak Steam Electric Station, Unit 1 Location:FM-56, Glen Rose, Texas Dates:January 1, 2007 through May 21, 2007Inspectors: D. Allen, Senior Resident InspectorA. Sanchez, Resident Inspector E. Owen, Reactor Inspector, Engineering Branch 1 R. Kopriva, Senior Reactor Inspector, Engineering Branch 1 W. Sifre, Senior Reactor Inspector, Engineering Branch 1 R. Azua, Reactor Inspector, Engineering Branch 1 S. Rutenkroger, Reactor Inspector, Engineering Branch 1 Gilbert L. Guerra, CHP, Health Physicist Donald L. Stearns, Health PhysicistApproved by:Claude Johnson, Chief, Project Branch ADivision of Reactor Projects
Attachment:
Supplemental Information Enclosure-2-
SUMMARY OF FINDINGS
..................................................-3-
REPORT DETAILS
........................................................-4-
REACTOR SAFETY
.......................................................-4-1R02Evaluations of Changes, Tests, or Experiments (71111.02)..............-4-1R08Inservice Inspection Activities (71111.08)...........................-5-1R13Maintenance Risk Assessments and Emergent Work Evaluation (71111.13)...........................................................-9-1R17Permanent Plant Modifications (71111.17B).........................-9-1R19Postmaintenance Testing (71111.19).............................-10-1R20Refueling and Outage Activities (71111.20).........................-12-1R23Temporary Plant Modifications (71111.23)..........................-13-RADIATION SAFETY.....................................................-14-2OS1Access Control To Radiologically Significant Areas (71121.01)..........-14-2OS2ALARA Planning and Controls (71121.02)..........................-15-OTHER ACTIVITIES......................................................-17-4OA2Problem Identification and Resolution (71152).......................-17-4OA5Other Activities...............................................-18-4OA6Meetings, Including Exit........................................-25-