Contention 40 Re Unsuitability of Site for Proposed Nuclear Plant.Assumed Fission Product Release from Any Significant Accident Will Exceed Radioactivity Dose Limitations
ML19209B197
Person / Time
Site: Allens Creek File:Houston Lighting and Power Company icon.png
Issue date: 07/24/1979
From: Doherty J
DOHERTY, J.F.
To:
Shared Package
ML19209B198 List:
References
NUDOCS 7910090313
Download: ML19209B197 (1)


Text

+y'_ p/ ]%!D

+. ' 4 =

. h s?'i jy S. . .sG ,m- . .u,.,v. . . ns..

gpf L. . .,

,y..,,,

. .. r.

. n -....- - -

w. uo u . v..

3=..,,,..-,

a :u =s ..2 . - -

a . : 2,,.7 ,,,3, w :... a . . . a .,w ,....

. ., D Y '

In :he Matter of Houston L'shring )s and acuer eonpany:

n )

>--Docket j'C-466 CL (Allens Creek '.iuclear Generating )

Station, Unit 1) )

JCEIi F. DCIERTY'S CCliTII?2 ION #40 John F. Doherty, Intervenor in the above proceed.ing, filen this contention pursuant to 10 CFR 2.712 (a) (1) as a conten-tion based on infornation not available previously.

  • PZZT OF CO:ITINTICU 20 Intervenor contends the Allens Creek site is unsuitable for the proposed nuclear plant, because the assuned fission product release fron an7 accident considered credible will exceed the linitations of radiocctivity dose to the low pop-ulation zone stated in 10 CFR100.11, (a) (1), (2), and (3),

This Intervenor c6ntends this because the actual re-lease of radio-activity fran the Three Mile Island accident exceeded. cal.culated release for any accident considered credible b7 a factor of 22, using the calculation sug-gestions of 2egulator7 Gui.ie 1.4.* The proposed AC::G3 nad Three Mile Island are sufficiently similar in design such that the miscalculation in the ill-fated reactor's case is the sane for the subject of these proceedings, in re-Enrd to source terns, and other factors.

This contention is carticularly relevant to .'.ONG3 construction license croces.iing becausa :he J.po'.icant's

'rrosed N?35 will use the largest 3'dR core attengted, . tit". t. e highest power core density, and greater nininun critical heat flux ratic than any functioning 3'iR plant. Construction of the olant at the propcsed site will in.ure j Intervenor's heal:h and safet7 incerest by exposing hin to radiation in excess of the ruidelines of TC CFR 100.1'.