ML19220A048

From kanterella
Revision as of 04:25, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Massachusetts Institute of Technology (Mit) - Notification of a Change in Level 1 Facility Staffing
ML19220A048
Person / Time
Site: MIT Nuclear Research Reactor
Issue date: 08/01/2019
From: Foster J, Lau E
Massachusetts Institute of Technology (MIT)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML19220A048 (1)


Text

n I l

. ,,--**~.**--**--'-~---\ I*; '.* *l

~l r~ .* . . ! \ . MIT NUCLEAR REACTOR LABORATORY tr .*.* * ... ! r .!1 , 1I  !

!L . . . . . . . ":~...--~-.... ..,_....._~~-,.

-l I

AN MIT INTERDEPARTMENTAL CENTER Edward S. Lau Mail Stop: NW12-122 Phone: 617 253-4211 Assistant Director 138 Albany Street Fax: 617 324-0042 Reactor Operations Cambridge, MA 02139 Email: eslau@mit.edu 1 August 2019 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn.: Document Control Desk

Subject:

NRL Director, Docket No. 50-20, License R-37 Massachusetts Institute of Technology (MIT) provides the following notification of a change in Level 1 facility staffing, in accordance with MIT Reactor Technical Specification 7.7.3(a): Dr. Gordon Kohse has been named the Interim Director for the MIT Nuclear Reactor Laboratory (NRL), effective 1 August 2019. He succeeds Dr. David E. Moncton, who departs the Lab and plans to return to his research after taking a department head sabbatical. Dr. Kohse has education and experience commensurate with MIT's requirements for the NRL Director position. He is a Principal Research Scientist with the NRL and previously served as Deputy Director of Research and Services, working at the NRL for over 40 years. In accordance with ANSI/ANS Standard 15.4-2016 Section 4.2, he has received briefings sufficient to provide an understanding of the general operational and emergency aspects of the reactor facility.

Sincerely, Edward S. Lau, NE John P. Foster Assistant Director of Reactor Operations Director of Reactor Operations MIT Research Reactor MIT Research Reactor cc: USNRC - Senior Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation USNRC - Senior Reactor Inspector Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation