IR 05000424/2006401
Download: ML063120538
Text
October 17, 2006
Mr. D. E. Grissett Vice President - Vogtle Project Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC INSPECTION REPORT05000424/2006401 and 0500425/2006401
Dear Mr. Grissette:
On August 30, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspectionat your Vogtle Electric Generating Plant. The enclosed inspection report documents the inspection results, which were discussed on August 31, 2006, with Mr. Tom Tynan and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
The (inspector/inspectors) reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified. In accordance with 10 CFR 2.390 and the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The PublicElectronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. D.E. Grissette-2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,/RA/
Scott M. Shaeffer, ChiefReactor Projects Branch 2 Division of Reactor ProjectsDocket Nos.50-424, 50-425License Nos.NPF-68, NPF-81
Enclosure:
NRC Inspection Report 05000424/2006401 and 0500425/2006401 w/Attachment ( )cc w/encl:T. E. Tynan General Manager, Plant Vogtle Southern Nuclear Operating Company, Inc.
7821 River Road Waynesboro, GA 30830N. J. StringfellowManager-Licensing Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, AL 35201-1295cc w/o encl:J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
P. O. Box 1295 Birmingham, AL 35201-1295Bentina C. TerrySouthern Nuclear Operating Company, Inc.
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295(cc w/o encl cont'd - See page 3)