ML19105B048 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 12/09/1981 |
From: | Virginia Electric & Power Co (VEPCO) |
To: | Office of Nuclear Reactor Regulation |
References | |
NUREG 0737 | |
Download: ML19105B048 (159) | |
Similar Documents at Surry | |
---|---|
Category:- No Document Type Applies
MONTHYEARML22034A3952022-02-16016 February 2022
[Table view]Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21342A1412021-12-0909 December 2021 Enclosure - List of Attendees for the Public Meeting in Tarrytown, Ny, Re Indian Point Units 1, 2, and 3 PSDAR ML21130A0532019-09-30030 September 2019 Appendix C: Criticality Analysis Checklist ML19105B0552019-04-15015 April 2019 Superseded Pages Per Revision No. 01 to Environmental Sampling Program ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement ML19011A1712019-01-0404 January 2019 Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting Documents ML17038A2702016-12-14014 December 2016 Non-Proprietary Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) ML16277A1882016-10-0303 October 2016 2016301 Final SRO Written Examination ML15097A1172015-04-0707 April 2015 Soarca Surry 2004 Meteorological File ML15065A2382015-02-0606 February 2015 Acord Certificate of Liability Insurance ML14162A5772014-06-25025 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushim Dai-ichi Nuclear Power Plant Accident ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1019301942010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for Surry ML1011005512010-04-20020 April 2010 Public Meeting Attendees (4/13/10) ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0931004632009-11-0404 November 2009 E-mail Attachment Revised Dominion Draft Response to NRC GL 04-02 RAI Question #4 ML12024A0732009-03-31031 March 2009 Don Dube Comments; Soarca Secy and Associated Enclosures ML12024A0742009-03-0909 March 2009 RES Response Comments; Don Dube Comments: Soarca Secy and Associated Enclosures ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0730400302007-10-0101 October 2007 Sign-In Roster for Public Meeting with Dominion Nuclear ML0634705992006-12-14014 December 2006 Plant Service List ML0513005392005-05-0505 May 2005 Attachment 1, Response to Requests for Additional Information on Nuclear Facility Quality Assurance Program Description ML0513005442005-05-0505 May 2005 Attachment 2, Response to Requests for Additional Information Re Proposed Technical Specifications Changes Associated with Nuclear Facility Quality Assurance Program Description ML0513005592005-05-0505 May 2005 Enclosure 5, Response to Requests for Additional Information Replacement Discussion of Changes ML0513005562005-05-0505 May 2005 Enclosure 4, Response to Requests for Additional Information Marked Up Discussion of Changes ML0631805182004-06-0101 June 2004 Tragis Routing Engine Version 1.4.15, from Surry to Yucca Mountain ML0414803912004-05-0707 May 2004 Halon System, Emergency Switchgear Room and Fire Protection Drawings ML0410701372004-04-0808 April 2004 Attachment 1, List of Attendees for Surry Annual Assessment Meeting Dated 04/08/04 ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0505404692004-02-10010 February 2004 Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0505402642003-10-22022 October 2003 Summary of EB1 Findings (07-09/03) ML0403502122003-08-13013 August 2003 DRS Open Items Status ML0403506872003-08-0505 August 2003 DRS Open Item Status ML0224003322002-08-27027 August 2002 Outline for Phone Calls with Licensees for: Davis-Besse, H.B. Robinson, North Anna Unit 2 and Surry Unit 2 ML0213304862002-04-29029 April 2002 Dominion'S SBO Supplemental Response, Final Draft Dated 04/29/2002 ML0201003882002-01-24024 January 2002 Enclosufigures Depicting the Locations of the Surry and North Anna Power Stations and Their Associated Transmission Lines ML19093A4871989-07-24024 July 1989 Generic Letter 89-06, Re SPDS Photographs, Which Is Made Up of Series of Colorgraphic Displays Arranged in a Hierarchical Manner ML19105B0471982-06-28028 June 1982 06/28/1982 Superseded Pages Per Revision 3 to Response to NUREG 0737 Post TMI Requirements ML19105B0481981-12-0909 December 1981 12/09/1981 Superseded Pages Per Revision 2 to Response to NUREG 0737 Post TMI Requirements ML19105B0501981-06-18018 June 1981 06/18/1981 Superseded Pages Per Revision 1 to Response to NUREG 0737 Post TMI Requirements 2022-02-16 |