Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML17355A3901999-07-27027 July 1999 Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3021999-04-26026 April 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2471999-03-0808 March 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Certain Requirements from TS Section 6.0 That Are Adequately Controlled by Existing Regulations Other than 10CFR50.36 & TS ML17355A2391999-02-24024 February 1999 Application for Amends to Licenses DPR-31 & DPR-41,removing Restrictions on Location at Which Temp of UHS May Be Monitored in TS 3/4.7.4 ML17354B1621998-10-27027 October 1998 Application for Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi- Discipline Supervisor Position Into TS ML17354A8321998-03-12012 March 1998 Application for Amends to Licenses DPR-31 & DPR-41,deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7601998-01-0909 January 1998 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 5.3.1 & 6.9.1.7 to Allow Implementation of Zirlo Fuel Rod Cladding ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17354A6141997-08-27027 August 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Turkey Point Units 3 & 4 TS to Allow Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4201997-02-24024 February 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs 6.9.1.7, COLR & Adding Best Estimate Large Break Loss of Coolant Accident Analysis to COLR ML17354A3721996-12-17017 December 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3501996-11-22022 November 1996 Application for Amends to Licenses DPR-31 & DPR-41, Requesting Rev to Allow Unit 3 Diesel Fuel Oil Storage Tank to Be Drained,Inspected & Cleaned While Maintaining at Least One Unit 3 Diesel Operable ML17354A2851996-10-0303 October 1996 Application for Amend to Licenses DPR-31 & DPR-41 to Modify Plants Units 3 & 4 to Revise TS Allowing Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7971996-07-17017 July 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7091996-05-28028 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Section 6.0, Administrative Controls, IAW 10CFR50.90 to Address Licensed Qualifications of Operations Manager ML17353A6881996-05-10010 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6501996-04-23023 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 7.4 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation. ML17353A6561996-04-19019 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6151996-03-21021 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6061996-03-20020 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.5.1 to Remove SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels from Ts,Per Line-Item 7.4 from GL 93-05 ML17353A5981996-03-0505 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 4.4.3.3 & 4.5.2 to Reduce Frequency of Surveillances & Insps in Accordance W/Gl 93-05 Items,6.6 & 7.5 ML17353A5011995-12-18018 December 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising Definition of RTP from 2,200 Mwt to 2,300 Mwt.Proprietary TR WCAP-13719,Rev 2 & Nonproprietary TRs WCAP-13718,Rev 2 & WCAP-14276,Rev 1 Encl.Proprietary TR WCAP-13719 Withheld ML17353A4521995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Index to Delete Bases Re Administrative Controls & Reviews ML17353A4491995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs w/Line-Item 10.1 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation, Per GL 94-01 ML17353A3951995-10-0404 October 1995 Application for Amend to License DPR-31 & DPR-41,modifying Plant TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/ Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3811995-09-28028 September 1995 Application for Amends to Licenses DPR-31 & DPR-41, Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3511995-09-11011 September 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 10.1 from GL 93-05, Line-Item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation & Guidance in GL 94-01 ML17353A2811995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Per Selected Line Items from NRC GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation. ML17353A2771995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 ML17353A2741995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2711995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2681995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.1.3.1, Movable Control Assemblies - Group Height & 3/4.1.3.2, Position Indication Sys - Operating & Asociated Bases ML17353A2651995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Table 4.3-1 Re Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17352B1821995-05-23023 May 1995 Application for Amends to Licenses DPR-31 & DPR-41.Amends Would Use Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation Setpoints ML17352B0851995-03-30030 March 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot- Start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17352A8361994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3.9.4 & 1.9,allowing Containment Personnel Airlock Doors to Be Opened During Core Operations & Movement of Irradiated Fuel in Containment ML17352A8291994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.4.9.1 to Remove Schedule for Withdrawal of Rv Matl Surveillance Specimens,Gl 91-01 ML17352A7221994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3.1.3.6, Reactivity Control Sys CR Insertion Limits, 3/4.2.2, Heat Flux Hot Channel Factor - Fq(Z) & 6.9.1.7, COLR & Associated Bases,Per GL 88-16.COLRs Encl ML17352A7301994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.7.1 & Associated Bases Which Address Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML17352A7271994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.8.1.1.2e & 4.8.1.1.2f Re EDG Fuel Oil Testing Program ML17352A5451994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.0.5a, Applicability - Srs, to Reflect Intent of Revised STS (NUREG-1431) for ISI & Testing Programs,In Accordance W/Recommendations in Draft NUREG-1482 ML17352A5421994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.6.2.1.d, CSS Surveillance Interval for Air or Smoke Flow Test Through CS Header from at Least Once Per 5 Yrs to at Least Once Per 10 Yrs,Per GL 93-05 & NUREG-1366 ML17352A4611994-02-18018 February 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.5.2.8, Audits by Deleting Frequencies Performed Under Cognizance of Nuclear Review Board,Per GL 93-07 ML17352A4351993-12-28028 December 1993 Application for Amends to Licenses DPR-31 & DPR-41,proposing Addition of SG Water Level - high-high Protection to TS Tables 3.3-2,3.3-3,4.3-2 & Associated Bases,In Accordance W/ Commitment to GL 89-19 for Resolution of USI A-47 ML17352A2621993-10-0404 October 1993 Application for Amend to Licenses DPR-31 & DPR-41 Revising Surveillance Requirement 4.6.1.2a & Associated Bases to Conform w/NUREG-1431,Standard Ts,Westinghouse Plants,Rev 0 ML17352A2201993-09-0303 September 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3/4.7.1.6, Standby FW Sys & Associated Bases to Eliminate Cranking DGs ML17352A2011993-08-17017 August 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising License Conditions 3.G & 3.F Respectively,To Conform to Std Fire Protection License Proposed as Stated in GL 86-10 ML17352A1061993-07-20020 July 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Definitions to Ensure Consistency W/New 10CFR20 Requirements & Changing Radiological Effluent Release Rept Frequency ML17349A8771993-05-21021 May 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 5.2.2, Design Pressure & Temp & Associated Bases to Correct Ref to Max Containment Design Internal Pressure from 59 Psig to 55 Psig 1999-07-27
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML17355A3901999-07-27027 July 1999 Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis ML17355A3021999-04-26026 April 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Obsolete Part of License Condition 3.L & Incorporating Administrative Changes to TS Index,Ts 3/4.1.2.5 & TS 3/4.7.6 ML17355A2471999-03-0808 March 1999 Application for Amends to Licenses DPR-31 & DPR-41,deleting Certain Requirements from TS Section 6.0 That Are Adequately Controlled by Existing Regulations Other than 10CFR50.36 & TS ML17355A2391999-02-24024 February 1999 Application for Amends to Licenses DPR-31 & DPR-41,removing Restrictions on Location at Which Temp of UHS May Be Monitored in TS 3/4.7.4 ML17354B1621998-10-27027 October 1998 Application for Amends to Licenses DPR-31 & DPR-41,to Incorporate Specific Staff Qualifications for Multi- Discipline Supervisor Position Into TS ML17354A8321998-03-12012 March 1998 Application for Amends to Licenses DPR-31 & DPR-41,deleting License Conditions 3.I,3.K,3.H & 4 & Incorporating Recent Organization Change in TS 6.5.1.2 & 6.5.3.1.a ML17354A7601998-01-0909 January 1998 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 5.3.1 & 6.9.1.7 to Allow Implementation of Zirlo Fuel Rod Cladding ML17309A9111997-12-29029 December 1997 Application for Amend to License NPF-16,modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17354A6141997-08-27027 August 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Turkey Point Units 3 & 4 TS to Allow Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week ML17354A4201997-02-24024 February 1997 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs 6.9.1.7, COLR & Adding Best Estimate Large Break Loss of Coolant Accident Analysis to COLR ML17354A3721996-12-17017 December 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS to Change SR for TS 4.4.10 Re Reactor Coolant Pump Flywheel Insp ML17354A3501996-11-22022 November 1996 Application for Amends to Licenses DPR-31 & DPR-41, Requesting Rev to Allow Unit 3 Diesel Fuel Oil Storage Tank to Be Drained,Inspected & Cleaned While Maintaining at Least One Unit 3 Diesel Operable ML17354A2851996-10-0303 October 1996 Application for Amend to Licenses DPR-31 & DPR-41 to Modify Plants Units 3 & 4 to Revise TS Allowing Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 ML17353A7971996-07-17017 July 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TSs to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Intervals Determined by performance-based Criteria ML17353A7091996-05-28028 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Section 6.0, Administrative Controls, IAW 10CFR50.90 to Address Licensed Qualifications of Operations Manager ML17353A6881996-05-10010 May 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6501996-04-23023 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 7.4 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation. ML17353A6561996-04-19019 April 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl & Incorporating Administrative Clarifications & Corrections ML17353A6151996-03-21021 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Such That Requirements for Radiological Effluent Controls Relocated to Offsite Dose Calculation Manual or Process Control Program ML17353A6061996-03-20020 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.5.1 to Remove SRs & Operability Requirements for ECCS SI Accumulators That Concern Water Level & Pressure Channels from Ts,Per Line-Item 7.4 from GL 93-05 ML17353A5981996-03-0505 March 1996 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Sections 4.4.3.3 & 4.5.2 to Reduce Frequency of Surveillances & Insps in Accordance W/Gl 93-05 Items,6.6 & 7.5 ML17353A5011995-12-18018 December 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising Definition of RTP from 2,200 Mwt to 2,300 Mwt.Proprietary TR WCAP-13719,Rev 2 & Nonproprietary TRs WCAP-13718,Rev 2 & WCAP-14276,Rev 1 Encl.Proprietary TR WCAP-13719 Withheld ML17353A4521995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Index to Delete Bases Re Administrative Controls & Reviews ML17353A4491995-11-22022 November 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Specs w/Line-Item 10.1 from NRC GL 93-05, Line-Item Tech Specs Improvements to Reduce Surveillance Requirements for Testing During Power Operation, Per GL 94-01 ML17353A3951995-10-0404 October 1995 Application for Amend to License DPR-31 & DPR-41,modifying Plant TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/ Esfas,Tables 4.3-1 & 4.3-2 SR for Rps/Nis/Esfas & Bases 3/4.3.1 & 3/4.3.2 for Rps/Nis/Esfas Instrumentations ML17353A3811995-09-28028 September 1995 Application for Amends to Licenses DPR-31 & DPR-41, Implementing Revised Thermal Design Procedure & SG Water Level low-low Setpoint ML17353A3511995-09-11011 September 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS in Accordance w/Line-Item 10.1 from GL 93-05, Line-Item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation & Guidance in GL 94-01 ML17353A2811995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Per Selected Line Items from NRC GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation. ML17353A2771995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Tables 3.3-1 & 3.3-2 Action Statements for Rps/Nis/Esfas Instrumentation,Tables 4.3-1 & 4.3-2 SRs for Rps/Nis/Esfas Instrumentation & Bases 3/4.3.1 & 3/4.3.2 ML17353A2741995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,adding to Approved COLR Analysis Methodology Used for SBLOCA Analysis in Anticipation of Thermal Uprate to 2,300 Mwt for Both Units & Increasing Current Margin to Calculated PCT ML17353A2711995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS to Achieve Consistency Throughout Document by Removing Outdated Matl,Incorporating Administrative Clarifications & Corrections & Correcting Typos ML17353A2681995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.1.3.1, Movable Control Assemblies - Group Height & 3/4.1.3.2, Position Indication Sys - Operating & Asociated Bases ML17353A2651995-07-26026 July 1995 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS Table 4.3-1 Re Nuclear Instrumentation Sys Adjustments Based on Calorimetric Measurements at Reduced Power Levels ML17352B1821995-05-23023 May 1995 Application for Amends to Licenses DPR-31 & DPR-41.Amends Would Use Changed Setpoint Presentation Format for RPS & ESFAS Instrumentation Setpoints ML17352B0851995-03-30030 March 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS SR 4.8.1.1.2.g.7,allowing Separation of 5-minute hot- Start Test from 24-h EDG Test Run,Deleting Associated Footnote & Adding New TS SR 4.8.1.1.2.g.14 ML17352B0001995-01-17017 January 1995 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.9.1.7, COLR, Re Implementation of FPL Nuclear Physics Methodology for Calculations of COLR Parameters.Fpl Topical Rept NF-TR-95-01, Nuclear Physics Methodology... Encl ML17352A8361994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3.9.4 & 1.9,allowing Containment Personnel Airlock Doors to Be Opened During Core Operations & Movement of Irradiated Fuel in Containment ML17352A8291994-10-20020 October 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.4.9.1 to Remove Schedule for Withdrawal of Rv Matl Surveillance Specimens,Gl 91-01 ML17352A7221994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3.1.3.6, Reactivity Control Sys CR Insertion Limits, 3/4.2.2, Heat Flux Hot Channel Factor - Fq(Z) & 6.9.1.7, COLR & Associated Bases,Per GL 88-16.COLRs Encl ML17352A7301994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 3/4.7.1 & Associated Bases Which Address Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML17352A7271994-07-19019 July 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.8.1.1.2e & 4.8.1.1.2f Re EDG Fuel Oil Testing Program ML17352A5451994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.0.5a, Applicability - Srs, to Reflect Intent of Revised STS (NUREG-1431) for ISI & Testing Programs,In Accordance W/Recommendations in Draft NUREG-1482 ML17352A5421994-04-19019 April 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 4.6.2.1.d, CSS Surveillance Interval for Air or Smoke Flow Test Through CS Header from at Least Once Per 5 Yrs to at Least Once Per 10 Yrs,Per GL 93-05 & NUREG-1366 ML17352A4611994-02-18018 February 1994 Application for Amends to Licenses DPR-31 & DPR-41,revising TS 6.5.2.8, Audits by Deleting Frequencies Performed Under Cognizance of Nuclear Review Board,Per GL 93-07 ML17352A4351993-12-28028 December 1993 Application for Amends to Licenses DPR-31 & DPR-41,proposing Addition of SG Water Level - high-high Protection to TS Tables 3.3-2,3.3-3,4.3-2 & Associated Bases,In Accordance W/ Commitment to GL 89-19 for Resolution of USI A-47 ML17352A2621993-10-0404 October 1993 Application for Amend to Licenses DPR-31 & DPR-41 Revising Surveillance Requirement 4.6.1.2a & Associated Bases to Conform w/NUREG-1431,Standard Ts,Westinghouse Plants,Rev 0 ML17352A2201993-09-0303 September 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 3/4.7.1.6, Standby FW Sys & Associated Bases to Eliminate Cranking DGs ML17352A2011993-08-17017 August 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising License Conditions 3.G & 3.F Respectively,To Conform to Std Fire Protection License Proposed as Stated in GL 86-10 ML17352A1061993-07-20020 July 1993 Application for Amends to Licenses DPR-31 & DPR-41,revising TS Definitions to Ensure Consistency W/New 10CFR20 Requirements & Changing Radiological Effluent Release Rept Frequency ML17349A8771993-05-21021 May 1993 Application for Amends to Licenses DPR-31 & DPR-41,modifying TS 5.2.2, Design Pressure & Temp & Associated Bases to Correct Ref to Max Containment Design Internal Pressure from 59 Psig to 55 Psig 1999-07-27
[Table view] |
Text
p REGULATDR+liNFORliATIDN DISTRIBUTION QTEM (SIDS) tACCESSION NBR:830919021'l'OC OATEN'3/09/12. NOTARIZED YES ~ DOCKET 0 FACIL:50~250 Turkey Poj'nt Pl'anti Unit 3i Florjda Power and Light C 05000250 50 251 Turkey Point Planti Unit 4i F'lorida Power and Light>> C 05000251 BYNAME, AUTH AUTHOR AFFILIATION EISENHUTiD 6 ~ ~ Florida Power 8 Light Co.
'RECIP,NAME RECIPIENT. AFFILIATE'ION EISENHUTFD.G. Division of L,icensino
'
SUBJECT:
Aoolicatjon for amend to License DPR 31 8 DPR 4iideleting ETS Section 0. 1. 1.E ie 10CFRSO Aoo 0 groundwater monitoring.
CODE A001S COPIES RECEIVED:LTR i NCL~
~ ~is
.SIZE' sX'if'ISTRIBUTION TIUTLEi OR Submitta-1; General Distr.ibution NOTES:
RECIPIENT COPIES RECIPIENT COPIES'LiT ID CODE/NAME LTTR ENCL *ID'ODE/NAMEI T,R EN C L.
NRR ORB1 BC 01 7,- .7 INTERNAL: "ELD/HDS4* 1 0 NRR/DE/MTEB 1 1 NRR/DI DIR 1 1 NRR/DL/ORAB 1 0 TB 1 '1 NRR/DSI/RABi 1 1 04 1- '1 'RGN2 1 1 EXTERNAL'ORS 09 LPDR 03 1 1 NRC 'PDR 02 NSIC 05 it '1 NTIS TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 iENCL
Jt: ~fr.' V. I>> VV I >H 'f l i ',h'
.]!$ 34~i g3'f ~~I.95 ]( l A f ib ~V
$ $i V k4V.V li I"'t' ~
kC 6' VVC 9 J ghP f 2 lilt~ Vf)mg f'lc>f i it' f t r. '>~K CI t<"5v'Oed(V 96~ r.-j nO ZeW f13/ 1 il. 1ntypal
.II > AI $
'" ~
V Tli
't(>t'v II "3 tKj I> tv~
"g 1~ a~ t
~ QJ L li'V ~ )
g VVV iq tq tai. f < iw
. I,k1~.gal i ~ ri.~r~i ,C, ~ 'IX.V IV@ t,'Fige l ~O v'r: I ~ rar. 0~ <'>
a II nr fefu. i to->'4u ." Xr
..~ni v af i 'c lo;tr a<v~si~ l~,- .
iv ~.
<a A,
'ra c
~p PIQV I[ 3~ t tilV i o'r 0 I;.l.I ]vJ > I,-j g I ' l '
v
" f II~ g '< . ~ I / ~ ~ lr <>>
1
>gJ J,V 4~,W :Vtl '41 ~< 3
~f f-~ ~<, J 'iIv '
ig<VJ'ih i aTl"'X l, X'. <<I V 0 Wt.i,<l'3 <g,.HS. JQ'4.V ~.
S 4l kV W I f ii'E~vI'kV,.
AJAR s
- 5. 9I. Vj ~ II
<tI ) Vg i- ~ Il'.
J V II V 1 i I
O. BOX 14000, JUNO BEACH, FL 33408 I
j FLORIDA POWER 8 LIGHT COMPANY September l2, 1983 L-83-482 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Eisenhut:
RE: Turkey Point Units 3 & 4 Docket Nos. 50-250 and 50-25 I Proposed License Amendment Deletion of A endix B Groundwater Monitorin Florida Power & Light Company requests the deletion of the subject Environmental Technical Specification (Section 4.I.I.2). Deletion of this ETS requirements was previously requested on February IO, l983. The request was withdrawn by FPL on April 25, l 983 pending finalization of a revised monitoring program under discussion at that time between Florida Power & Light Company and the South Florida Water Management District. Attachment A is a copy of the finalized agreement.
Attachment B is a summary document describing the history of groundwater monitoring and interceptor ditch operation at Turkey Point. This summary document also contains the basic findings of the monitoring program to dote and briefly discusses the revised monitoring program.
The revised agreement between Florida Power & Light Company and The South Florida Water Management District binds the twq.~arties to very specific monitoring requirements and operating conditions. With this agreement in place, retention of a monitoring program requirement in the Turkey Point, Appendix B, Environmental Technical Specifications is unnecessarily redundant and should be deleted.
Attachment C is our no significant hazards consideration determination.
In accordance with IO CFR l70.22, it has been determined that this represents a Class I and Class III amendment and a check for payment will follow under separate cover.
Very truly yours, Robert E. Uhrig )do Vice President Advanced Systems & Technology REU/ADB/SAV/cab 8309i902ii 8309i2 PDR ADOCK 05000250 Attachments P PDR PEOPLE... SERVING PEOPLE
iC STA'TE OF FLORIDA )
) ss.
COUNTY OF PALM BEACH )
Robert E. Uhri being first duly sworn, deposes.and says:
That he is Vice. President of Florida Power & 'Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best. of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
Robert E. Uhrig Subscribed and sworn to before me this
~/+ day of 19~.
.;=-'.-" -",C"'
.~,. fNOTARY>~PUrBLIC, in and for the County Jo@f Palm- Beach, State of Flor ida.
Notary Public, State of Flor1da at Large My commission expires:.
~
My ' Commission Expires October 30,.1983 founding Agan~
't 41 ir ~'I I
I ~ ~ I t
P I>>
'4 J
jJ
SoutFFlorida ,TACH$1ENT A Juecror Water Management District Post Office Box V '3301, Gun Club'Road Zo West Palm Beach. Florida 33402 Telephone (305).686-8800 Florida WATS L'ine 1-800-432.2045
~ ~ ~ N IN REPLY REFER TO:
0-FPL-22 Turkey, Point 8046/306 3uly 19, 1983 Mr. Charles D. Henderson, Manager Environmental Technical Services FPL juno Beach 700, Universe Boulevard 3uno Beach,, Florida 33408 Re: FPL h: SFWMD Agreement Turkey Point
Dear Mr. H erson:
Enclosed is a. fully and originally executed copy of the agreement between FPL'nd the South Florida Water .Management District for. Ground'ater Monitoring and Interceptor Ditch Operation Procedures at the Turkey Point Plant.
r If you have any questions,.please do not hesitate to contact'this office.
Sincer ly, tephen A. Walker Deputy Distr'ict Counsel W:ep Enclosure Robert L. Crarrr. Jr. Robert W. Padricir Chairman FOrt Lauderdale VCe Charrman FOrt PierCe
'p,sihrov I Rrirnhsm r manse I r'.nie~r~s Jen~ Bellamv
Oi 1
,n
C 'I AGREEMENT THIS AGREEMENT made and entered into this ~ day of A. D., 1983, by and between FLORIDA POWER R LIGHT COMPANY, hereinafter referred to as "FPL" and SOUTH FLORIDA WATER MANAGEMENT'ISTRICT, hereinafter referred to as "DISTRICT".
WITNESSETH WHEREAS, FPL and the CENTRAL AND SOUTHERN FLORIDA FLOOD CONTROL DISTRICT, hereinafter referred to as the "CSFFCD", predecessor to the DISTRICT, entered into an agreement dated February 2, 1972, hereinafter referred to as the "Original Agreement", governing the rights and obligations of the parties concerning the construction, operation and monitoring of the cooling water system 'for FPL's power generating plant at Turkey Point in Dade County, Florida; and WHEREAS, the Original Agreement has been supplemented and amended on three separate occasions; the First Supplemental' Agreement having been executed on October Zl, 1974; the Second Supplemental Agreemenk having been executed on August 14, 1975; and the Third Supplemental Agreement having been executed on September 10, 1976; and WHEREAS, the obligations undertaken by FPL and'he CSFFCD in the Original Agreement and the supplemental agreements have been satisfactorily performed to date; and construction of the cooling water system is complete; and WHEREAS, FPL still'as a continuing obligation to monitor for impacts of the cooling water system on the water resources of the DISTRICT in general and on the DISTRICT's facilities and operations in particular; and
\
WHEREAS, past monitoring activities indicate that any such impacts can be sufficiently determined through.a modified monitoring program; and
0 ,I I
FPL Agreement Page 2 of 7 WHEREAS, the parties desire to modify the present monitoring program to reflect current needs and conditions; and WHEREAS, the parties desire to set forth, in one agreement, all remaining obligations existing between them by virtue of the Original Agreement, the supplemental agreements and:the modified monitoring program.
NOW THEREFORE, the parties hereto agree as follows:
A.,INTERCEPTOR DITCH SYSTEM
- 1. FPL and DISTRICT agree that the purpose of the system is to restrict movement of saline water from the cooling water system westward of Levee 31E adjacent to the cooling water system to those amounts which would occur without the existence of the cooling water system. '
- 2. The operating criteria for the interceptor ditch system have been established by FPL to meet the objective set forth in Paragraph A.l. If at any time it is determined by DISTRICT that FPL operations. are such .that the objective of Paragraph A.l. is not being achieved, FPL agrees that it will immediately revise .the operating criteria for the interceptor ditch system upon the written instructions of DISTRICT's Executive Director or his authorized representative. Upon approval by DISTRICT, the new operating criteria shall be immediately placed into effect. FPL shall designate an official or employee of FPL who will be responsible for the receipt. of said operating criteria and for carrying them out.
- 3. If in the sole judgment of DISTRICT it is determined that operational changes, as specified under. Paragraph A.2., are not adequate to achieve the objective of Paragraph A.l., FPL will promptly take action to find and .implement other feasible engineering measures,to achieve the objective of Paragraph A.l., including reasonable
0 41 I' F P L Agree ment Page 3 of 7 alterations in the operation or design of the:interceptor ditch system. Should such alterations fail to achieve said objective, other feasible engineering measures regarding the cooling water system will be undertaken. If alterations to the cooling water system become necessary, any such alterations will take into account the reasonable operational requirements of the existing power plant.
- 4. Nothing contained in this Agreement shall estop the DISTRICT from availing itself of all other rights and remedies it may now or hereafter have to achieve the objective of Paragraph A.l.
- 5. Pump operation logs of a form acceptable to the DISTRICT shall be maintained by FPL for each interceptor ditch pumping installation. The current and preceding month's logs will be maintained at a designated on-site location for examination
'
by DISTRICT personnel.
- 6. FPL shall bear all costs associated with the construction, operation, maintenance, replacement, alteration, modification, or relocation of any and all existing or future interceptor ditch facilities made necessary by the cooling water system.
- 7. FPL shall save and hold the DISTRICT 'harmless and will defend against any and all claims arising from construction, operation, maintenance,
.replacement, alteration, modification or relocation of any existing or future interceptor ditch facilities made necessary by the cooling water system.
B. WATER TRANSFER FACILITIES
- 1. FPL shall accept on its lands east of Levee 31E, and be responsible for the use or disposal of all excess surface waters from the drainage basins of Canals 106 and 107, as shown on the attached Exhibit "A", made a part hereof, which can be delivered by Structures 20-A and 20 regardless of time and duration of discharge and quality. The
0 I ,1 F P L Agree m ent Page 4 of 7 parties agree that the capacity of the existing water transfer facilities replaces as nearly as practical that capacity which existed prior to the construction of FPL's cooling system.
FPL shall, at Its expense, operate and maintain the drainage system from Structure 20 seaward to the intersection with the Seadade Canal.
- 2. Operation of water transfer facilities shall be in accordance with instructions given FPL by DISTRICT's Director of Field Services or his designated representative. FPL shall designate an official or employee of FPL who will be responsible for the receipt of said operating instructions and for carrying them out.
- 3. FPL agrees to hold and save the DISTRICT harmless and to defend against any claim arising from the construction, operation, maintenance, replacement, modification, alteration or relocation of the water transfer facilities for Canal 106 and
'
Canal 107.
C. 'ONITORING P ROVISIONS
- 1. FPL shall monitor the cooling water system and the interceptor ditch facilities,to ensure that the objective specified in Paragraph A.l. is met.
- 2. The monitoring program outlined in the manual designated "FLORIDA POWER R LIGHT COMPANY'URKEY POINT~ FLORIDA'ROUNDWATER MONITORING AND INTERCEPTOR DITCH OPERATION PROCEDURES", revised July, 1983, hereinafter referred to as the "REVISED OPERATING MANUAL", which is incorporated herein by reference, shall be sufficient to meet the monitoring requirements imposed in Paragraph C:1.
- 3. Further revision or modification of the REVISED OPERATING MANUAL, shall be made in accordance with this Agreement and shall be set out in a supplement executed by both parties hereto, which supplement shall be attached to the
Ik FPL Agreement Page 5 of 7 REVISED OPERATING MANUAL as a part of that document. Provided, however, that non-substantive changes may be accomplished by letter, which, when signed by the party requesting the change and accepted by the other party, shall be incorporated into the REVISED" OPERATING MANUAL.
- 4. FPL shall designate an official, employee or agent of FPL who will have the responsibility for maintaining the monitoring installations in satisfactory operating condition and for collecting the required data and maintaining the record thereof.
- 5. FPL shall collect the data as provided in the REVISED OPERATING MANUAL; shall retain the same for a minimum of twenty-four (24) months; and shall review and analyze the data so collected consistent with the objectives of this Agreement. In August of each year, FPL shall submit to the DISTRICT a summary report evaluating the preceding year's events in terms of historic trends. The summary report shall consist of the information called for in the REVISED OPERATING MANUAL. The summary report shall not contain raw data unless specifically requested by the DISTRICT.
- 6. FPL shall bear all costs of installation, instrumentation, operation, maintenance, replacement, modification, alteration, or relocation of the monitoring system or any element thereof.
- 7. FPL shall hold and save DISTRICT harmless and will defend against any and all claims arising from installation, instrumentation, operation, maintenance, replacement, modification, alteration, or relocation of the monitoring system or any element thereof.
D. GENERAL PROVISIONS
- 1. This Agreement supercedes the Original Agreement between the
II FPL Agreement Page 6 of 7 parties dated February 2, 1972, and the Supplemental Agreements, dated October 21, 1974, August 1'4, 1975, and September 10, 1976.
- 2. This Agreement. shall be binding on the parties and their assigns and successors.
- 3. Should any unusual .event occur or should any substantive physical, mechanical, structural or operational changes be contemplated'to be made to the cooling water system, then FPL shall immediately notify the DISTRICT and, if the DISTRICT shall so request, a meeting of the representatives of both 'FPL and the DISTRICT, comprising the group known as the Technical Advisory Group, shall be convened at the earliest mutually convenient time to review and analyze such unusual occurrence or such contemplated substantive physical, mechanical, structural or operational changes and to determine by mutual agreement what action shall be taken in relation thereto.
'"4. Should any unusual event occur or should any substantive physical, mechanical, structural or operational changes be contemplated to be made .with regard to DISTRICT'S operations in the vicinity of the cooling water system, then. DISTRICT shall immediately notify FPL and, if FPL shall'so request, a meeting of the representatives of both FPL and the DISTRICT, comprising the group known as the Technical Advisory Group, shall be convened. at the earliest mutually convenient time to review and analyze such unusual occurrence or such contemplated substantive physical, mechanical, structural or operational changes and for FPL to make recommendations regarding the action to be taken in relation thereto.
- 5. In the event FPL discontinues the use of the feeder, collector and cooling canals as a part of its cooling system, then FPL's obligations as to interceptor ditch pumping and as to monitoring shall cease and terminate. In'the event FPL e
0 ~
'
FPL Agreement Page 7 of 7 discontinues the use of a portion of the feeder, collector or cooling canals as a part of its cooling system, then, to the extent, in the judgment of DISTRICT, that interceptor ditch pumping and monitoring are no longer necessary, such obligations shall cease and terminate.
IN WITNESS WHEREOF, the parties hereto have set their hands and seals, in duplicate originals, the day and year first above written.
FLORIDA POWER R L'IGHT COMPANY (Corporate Seal)
By Vice President Executed in the presence of: Advanced Systems and Technology ATTEST:
As to FPL By
Title:
No ry Public for . he State of Florida at Large SOUT DA WATER MANAGEMENT DISTR , B ITS GOVERNING BOARD (Corporate Seal)
By WlG Chairman Executed in the prese of:
ATTEST:
As to DISTRICT By taQt Secretary
lk I I ~
PAID DRZVE DRAINAGE DIVIDE G-6 ~
"/
G-21. / /
S20A I PCWER 0 I PL&i T 3/
~
TOTAL DRAINAGE AREA
= 27.9 mi Z
l /
/ I I
g l 5
/ r
~
I l / B ZSCAYh'
( BAY
/ COOLING I
/ cmuL
'-35 ~ G-28 ( / svsrm I
I G-27
/
~
~S ( /
/
/
6 I I
l C-107 'S 20
/ .
l I
I 0 I
'0 I 0 I S~ DADE CANAL
,FEET 1000 0 1000 2000 EXHIBIT A. DRAINAGE BASINS OF CANALS 106 and 107
4l 4~
~"