ML060970044

From kanterella
Revision as of 21:13, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Correction to Amendment No. 165 Technical Specification Page 3/4 3-31
ML060970044
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/06/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC8605
Download: ML060970044 (1)


Text

TABLE 4.3.2.1-1 (Continued)

ISOLATION ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL OPERATIONAL CHANNEL FUNCTIONAL CHANNEL CONDITIONS FOR WHICH TRIP FUNCTION CHECK TEST CALIBRATION SURVEILLANCE REQUIRED HIGH PRESSURE COOLANT INJECTION SYSTEM ISOLATION (Continued)

h. HPCI Torus Compartment Temperature - High NA Q R 1, 2, 3
i. Drywell Pressure - High NA Q R 1, 2, 3
j. Manual Initiation NA R NA 1, 2, 3
7. RHR SYSTEM SHUTDOWN COOLING MODE ISOLATION
a. Reactor Vessel Water Level -

Low, Level 3 S Q R 1, 2, 3

b. Reactor Vessel (RHR Cut-in Permissive) Pressure - High NA Q R 1, 2, 3
c. Manual Initiation NA Q(a) NA 1, 2, 3
    • When any turbine stop valve is greater than 90% open and/or when the key-locked bypass switch is in the Norm position.
  1. Refer to Specification 3.1.5 for applicability.

(a) Manual initiation switches shall be tested at least once per 18 months. All other circuitry associated with manual initiation shall receive a CHANNEL FUNCTIONAL TEST at least once per 92 days as part of circuitry required to be tested for automatic system isolation.

(b) Each train or logic channel shall be tested at least every other 92 days.

HOPE CREEK 3/4 3-31 Amendment No. 165