Technical Specifications, Issuance of Amendment Ultimate Heat Sink, MC8054
ML062140397
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/01/2006
From: Stewart Bailey
NRC/NRR/ADRO/DORL/LPLB
To: Levis W
Public Service Enterprise Group
ENNIS R, NRR/DLPM,415-1453
Shared Package
ML062130006 List:
References
TAC MC8054
Download: ML062140397 (1)


Text

PLANT SYSTEMS ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7.1.3 The ultimate heat sink (Delaware River) shall be OPERABLE with:

a. A minimum river water level at or above elevation -9'0 Mean Sea Level, USGS datum (80'0 PSE&G datum), and
b. An average river water temperature of less than or equal to 85.0*F.*

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3, 4, 5 and *.

ACTION:

With the river water temperature in excess of 85.0*F, continued plant operation is permitted provided that both emergency discharge valves are open and emergency discharge pathways are available. With the river water temperature in excess of 88.0*F, continued plant operation is permitted provided that all of the following additional conditions are satisfied: all SSWS pumps are OPERABLE, all SACS pumps are OPERABLE, all EDGs are OPERABLE and the SACS loops have no cross-connected loads (unless they are automatically isolated during a LOP and/or LOCA); with ultimate heat sink temperature greater than 89 0 F and less than or equal to 91.4*F, verify once per hour that water temperature of the ultimate heat sink is less than or equal to 89 0 F averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period; otherwise, with the requirements of the above specification not satisfied:

a. In OPERATIONAL CONDITIONS 1, 2 or 3, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b. In OPERATIONAL CONDITIONS 4 or 5, declare the SACS system and the station service water system inoperable and take the ACTION required by Specification 3.7.1.1 and 3.7.1.2.
c. In Operational Condition *, declare the plant service water system inoperable and take the ACTION required by Specification 3.7.1.2. The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.1.3 The ultimate heat sink shall be determined OPERABLE:

a.' By verifying the river water level to be greater than or equal to the minimum limit at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b. By verifying river water temperature to be within its limit:
1) at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the river water temperature is less than or equal to 82 0 F.
2) at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the river water temperature is greater than 82 0 F.