|
---|
Category:- No Document Type Applies
MONTHYEARML24227A5612024-08-12012 August 2024 Inservice Inspection Request for Information ML22207A0492022-07-25025 July 2022 Information Request, Security IR 2022402 NLS2021035, Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 32021-05-10010 May 2021 Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3 NLS2016063, Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version)2016-10-27027 October 2016 Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version) ML16125A5222016-05-0404 May 2016 FOIA/PA-2016-0455 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1003306012010-02-0808 February 2010 Compression Test of Concrete, 4000 Psi ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML1003413132010-01-0808 January 2010 Compression Test of Concrete, 3000 Psi ML0911802472009-03-0909 March 2009 Enclosure 5 - FAQ Log ML0921105892009-03-0606 March 2009 Nebraska Game and Parks Commission Species by County List ML0917606542008-04-0404 April 2008 CNS Lr - Air Pollutants and Control Techniques - Particulate Matter, Control Techniques, EPA ML0917501832008-02-15015 February 2008 Lr - NPPD Statement on Addressing Climate Change ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0721104332007-07-25025 July 2007 Questions from 1 Through 8 ML0628602402006-10-11011 October 2006 Analysis: Briefing Description of Issue ML0628602412006-10-11011 October 2006 Analysis: Brief Description of Issue ML0628602342006-10-11011 October 2006 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628602292006-10-11011 October 2006 Analysis: Brief Description of Issue ML0628300792006-10-0606 October 2006 Release Severity and Timing Classification Scheme (Severity, Timing) ML0627101442006-09-25025 September 2006 Violations (Violations Are Severity Level IV Unless Otherwise Stated) ML0623601262006-08-22022 August 2006 Loop Category ML0623601232006-08-22022 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the VB Code! ML0623601192006-08-22022 August 2006 Potential Risk Contribution from Large Early Release Frequency (LERF) ML0623601172006-08-22022 August 2006 Identification and Resolution of Problems - SW System Alignment ML0622205442006-08-0909 August 2006 State the Performance Deficiency Exactly as Stated ML0622204842006-08-0909 August 2006 Undated Paper, Page 8, Table 2 ML0622204962006-08-0909 August 2006 Preliminary Risk Screening for Cooper Service Water Issues ML0622205002006-08-0909 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the V ML0622205612006-08-0909 August 2006 SDP Phase 1 Screening Worksheet for IE, Ms, and B Cornerstones ML0618607002006-07-0303 July 2006 Enclosure - Final Significance Determination Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0601805372005-06-27027 June 2005 CNS - 06-2005 - Initial Examination Written Reference Handout ML0628602152004-12-0202 December 2004 SERP Worksheet for DP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601972004-11-30030 November 2004 E-Mail from Sanborn to Allen Et Al., Agenda for Region IV Serp'S on Thurs., Dec. 2, Outside Scope ML0628601862004-10-20020 October 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0619802422004-10-18018 October 2004 NRC Question B and CNS Answer ML0619802352004-10-18018 October 2004 NRC Question a and CNS Answer ML0619802282004-09-22022 September 2004 Condition Report CR-CNS-2004-06422, Alarm Procedure Errors ML0619404202004-09-21021 September 2004 CNS Answers to NRC Questions ML0623602872004-08-25025 August 2004 Memo from R. A. Gramm (NRR) to T. A. Bergman (Oedo), Subj: G20040484, Re-Issued Briefing Package for Drop-In Visit on September 2, 2004 by Nebraska Public Power District (NPPD) Officials... ML0628601042004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601052004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601062004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601092004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0619404382001-12-26026 December 2001 CNS Notification 10132527 ML0619403082001-06-12012 June 2001 CNS Surveillance Data Sheets - Procedure 7.3.1.11, Revision 3 2024-08-12
[Table view] |
Text
NRC QUESTION "A" Question:
How was the degraded battery condition (i.e. C&D Part 21) factored into the analysis for extending RCIC operation to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />?
Answer and Basis:
The Part 21 (Event No. 36073) identified a condition of non-conforming, high levels of calcium within the positive plate grids of some of their type LCR-25 batteries. The nonconforming condition was found
'to be isolated to a batch of battery cells supplied to NPPD in 1995, which are currently installed in the 250 VDC batteries at CNS. The 125 VDC batteries were replaced with cells manufactured in 2000 and.2001
- and are not susceptible to the nonconforming calcium levels in the positive plate grids.
Elevated levels of:calcium within the positive plate grid alloy can result in the acceleration of the normal aging phenomenon of positive plate growth associated with-battery cells. The positive plate growth eventually leads to internal shorts and, thus, reduced battery capacity (i.e. need for replacement). Even with the aging phenomenon being accelerated, therate of plate growth is slow, allowing sufficient predictive measures to detect degradation before the batteries are unable to perform their function.
In responseto the Part 21, the frequency for visual inspection of the 250 VDC batteries has been increased from once per -12 months to every 6 months. The inspection activity is completed under Surveillance Procedure 6.EE.6 11. The 250 VDC battefies were inspected during December 2003 and again during June 2004, with no discrepancies associated with plate swelling. Therefore, there were no signs of positive plate swelling at the time of the condition.
Both Div. I and Div. Ii 250 VDC batteries are scheduled for replacement during RF022 (WO's 4296299 and 4296400, respectively).
Sign:. ":a Steve Baker, EE\DC System Engineer Sign: 1&k41ŽA 4fl irPv Todd Hottovy, E Manar