MONTHYEARML24227A5612024-08-12012 August 2024 Inservice Inspection Request for Information ML22207A0492022-07-25025 July 2022 Information Request, Security IR 2022402 NLS2021035, Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 32021-05-10010 May 2021 Attachment/Enclosureport of Change and Summary of 50.54(q) Analysis - On-Shift Staffing Analysis, Rev. 3 NLS2016063, Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version)2016-10-27027 October 2016 Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version) ML16125A5222016-05-0404 May 2016 FOIA/PA-2016-0455 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1003306012010-02-0808 February 2010 Compression Test of Concrete, 4000 Psi ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML1003413132010-01-0808 January 2010 Compression Test of Concrete, 3000 Psi ML0911802472009-03-0909 March 2009 Enclosure 5 - FAQ Log ML0921105892009-03-0606 March 2009 Nebraska Game and Parks Commission Species by County List ML0917606542008-04-0404 April 2008 CNS Lr - Air Pollutants and Control Techniques - Particulate Matter, Control Techniques, EPA ML0917501832008-02-15015 February 2008 Lr - NPPD Statement on Addressing Climate Change ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0721104332007-07-25025 July 2007 Questions from 1 Through 8 ML0628602402006-10-11011 October 2006 Analysis: Briefing Description of Issue ML0628602412006-10-11011 October 2006 Analysis: Brief Description of Issue ML0628602342006-10-11011 October 2006 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628602292006-10-11011 October 2006 Analysis: Brief Description of Issue ML0628300792006-10-0606 October 2006 Release Severity and Timing Classification Scheme (Severity, Timing) ML0627101442006-09-25025 September 2006 Violations (Violations Are Severity Level IV Unless Otherwise Stated) ML0623601262006-08-22022 August 2006 Loop Category ML0623601232006-08-22022 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the VB Code! ML0623601192006-08-22022 August 2006 Potential Risk Contribution from Large Early Release Frequency (LERF) ML0623601172006-08-22022 August 2006 Identification and Resolution of Problems - SW System Alignment ML0622205442006-08-0909 August 2006 State the Performance Deficiency Exactly as Stated ML0622204842006-08-0909 August 2006 Undated Paper, Page 8, Table 2 ML0622204962006-08-0909 August 2006 Preliminary Risk Screening for Cooper Service Water Issues ML0622205002006-08-0909 August 2006 Danger Will Robinson: If You Change Cell Locations You May Break the V ML0622205612006-08-0909 August 2006 SDP Phase 1 Screening Worksheet for IE, Ms, and B Cornerstones ML0618607002006-07-0303 July 2006 Enclosure - Final Significance Determination Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0601805372005-06-27027 June 2005 CNS - 06-2005 - Initial Examination Written Reference Handout ML0628602152004-12-0202 December 2004 SERP Worksheet for DP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601972004-11-30030 November 2004 E-Mail from Sanborn to Allen Et Al., Agenda for Region IV Serp'S on Thurs., Dec. 2, Outside Scope ML0628601862004-10-20020 October 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0619802422004-10-18018 October 2004 NRC Question B and CNS Answer ML0619802352004-10-18018 October 2004 NRC Question a and CNS Answer ML0619802282004-09-22022 September 2004 Condition Report CR-CNS-2004-06422, Alarm Procedure Errors ML0619404202004-09-21021 September 2004 CNS Answers to NRC Questions ML0623602872004-08-25025 August 2004 Memo from R. A. Gramm (NRR) to T. A. Bergman (Oedo), Subj: G20040484, Re-Issued Briefing Package for Drop-In Visit on September 2, 2004 by Nebraska Public Power District (NPPD) Officials... ML0628601042004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601052004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601062004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0628601092004-07-15015 July 2004 SERP Worksheet for SDP-Related Finding at Cooper Nuclear Station, Service Water Gland Seal Water Configuration Deficiency ML0619404382001-12-26026 December 2001 CNS Notification 10132527 ML0619403082001-06-12012 June 2001 CNS Surveillance Data Sheets - Procedure 7.3.1.11, Revision 3 2024-08-12
[Table view] |
Text
Potential Risk Contribution from Large Early Release Frequency (LERF):
In accordance with Manual Chapter 0609, Appendix A, Attachment 1, Step 2.6, "Screening for the Potential Risk Contribution Due to LERF," the analyst assessed the impact of large early release frequency because the Phase 2 SDP result provided a risk significance estimation of 7.
As documented in a letter from Arthur T. Howell Ill, Director, Division of Reactor Projects to Randall K. Edington, Vice President-Nuclear and CNO or the Nebraska Public Power District, dated March 31, 2005, the NRC previously evaluated the dominant sequences associated with a loss of service water initiator at Cooper. The conclusion was that, at the Cooper Nuclear Station, no significant LERF sequences are derived from a loss of service water. The postulated core damage sequences take more time than the average to progress to core damage. This would provide additional time to vessel breach and the postulated release. Additionally, the licensee and the states of Nebraska and Missouri have documented that there is a relatively short time estimated to evacuate the close-in population surrounding Cooper Nuclear Station.
LERF is defined in NRC Inspection Manual Chapter 0609, Appendix H, "Containment Integrity Significance Determination Process" as: "the frequency of those accidents leading to significant, unmitigated release from containment in a time frame prior to the effective evacuation of the close-in population such that there is a potential for early health effect." The NRC has noted that the dominant core damage sequences following a loss of service water at Cooper are long sequences that take greater than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to proceed to reactor pressure vessel breach. The shortest calculated interval from the time reactor conditions would have met the requirements for entry into a general emergency (requiring the evacuation) until the time of postulated containment rupture was 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. The licensee stated that the average evacuation time for Cooper from the declaration of a General Emergency was 62 minutes.
The NRC determined that, based on a 62-minute average evacuation time, effective evacuation of the close-in population could be achieved within 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. Therefore, the dominant core damage sequences affected by the subject performance deficiency were not LERF contributors. As such, the NRC's best estimate determination of the change in LERF resulting from the performance deficiency was zero.