Plum Brook Reactor Facility Reactor Master Inspection Plan - Fiscal Year (Fy) 2008
ML072920546
Person / Time
Site: Plum Brook
Issue date: 10/19/2007
From: Louden P
NRC/RGN-III/DNMS/DB
To: Earles J
US National Aeronautics & Space Admin (NASA), Lewis Research Ctr
References
Download: ML072920546 (3)


Text

October 19, 2007 Dr. Julian Earles, Director NASA Glenn Research Center at Lewis Field 21000 Brookpark Road M.S. 3-2 Cleveland, Ohio 44135

SUBJECT:

PLUM BROOK REACTOR FACILITY REACTOR MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2008

Dear Dr. Earles:

In accordance with NRC Manual Chapter 2545, Research and Test Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for the Plum Brook Reactor. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for October 2007 through September 2008 (FY2008). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2008 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2008, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2008 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Plum Brook Reactor FY2008 MIP.

We currently project the Region will conduct two to three inspections at the Plum Brook Reactor during FY2008. The following is a list of the inspection procedures we expect to use during our inspections. The specific procedure(s) used during each inspection will depend on the specific decommissioning activities being conducted.

Inspection Procedure Inspection Procedure Title IP 69013 Research and Test Reactor Decommissioning IP 83801 Inspection of Final Surveys of Permanently Shutdown Reactors In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

J. Earles We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Patrick L. Louden, Chief Decommissioning Branch Docket Nos. 50-30 and 50-185 License Nos. TR-3 and R-93 cc: Radiation Health Program Director, Ohio Department of Health Stephen Helmer, Bureau of Radiation Protection, Ohio Department of Health Ohio Environmental Protection Agency, Division of Planning Keith Peecook, NASA, Plumbrook Station Distribution:

Docket File R. Tadesse, FSME C. Glen, FSME RIII PRR CAC (e-mail) mailto:ROPreports@nrc.gov

J. Earles We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Mr. William Snell of my staff at (630) 829-9871.

Sincerely,

/RA/

Patrick L. Louden, Chief Decommissioning Branch Docket Nos. 50-30 and 50-185 License Nos. TR-3 and R-93 cc: Radiation Health Program Director, Ohio Department of Health Stephen Helmer, Bureau of Radiation Protection, Ohio Department of Health Ohio Environmental Protection Agency, Division of Planning Keith Peecook, NASA, Plumbrook Station Distribution:

Docket File R. Tadesse, FSME C. Glen, FSME RIII PRR CAC (e-mail) mailto:ROPreports@nrc.gov DOCUMENT NAME:PLUM BROOK MIP.doc XPublicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME Snell:mb Louden DATE 10/18/07 10/19/07 OFFICIAL RECORD COPY